Bridge Statistics for Deer Park, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 69ft / 21.2mTotal length
  • $15,490,000Total costs
  • 29,619Total average daily traffic
  • 3,539Total average daily truck traffic
  • 39,462Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Deer Park
  • No street view available for this location

New bridges in Deer Park, WA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11930-1939
  • 21950-1959
  • 31960-1969
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Deer Park, WA
Average Bridge Truck Traffic in Deer Park, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 77.8%Good
  • 22.2%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 50.0%Good
  • 10.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 60.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 63.6%Very good
  • 36.4%Good
Find on map >>   Show street view

Structure Number: 4029A,  Location: 15.9 N JCT US 2 (Lat: 47.953583,  Lng: -117.487778),  Route carried "on" structure: US 395,  Year Built: 1951,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 10,833 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,952 (year 2039),  Design Load: HS 15,  Features Intersected: DRAGOON CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 290.374,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.68m (8.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $950,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $1,901,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12563A,  Location: 14.7 E JCT SR 206 (Lat: 47.997083,  Lng: -117.349722),  Route carried "on" structure: US 2,  Year Built: 1984,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 10,114 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 13,026 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: W BRANCH LITTLE SPOKANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 502.099,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $1,020,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $2,040,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 80079,  Location: 0.1 W DEER PARK CL (Lat: 47.954025,  Lng: -117.487122),  Route carried "on" structure: County highway 655,  Year Built: 1968,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,506 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,048 (year 2042),  Design Load: HS 20,  Features Intersected: DRAGOON CREEK,  Facility Carried by Structure: CRAWFORD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.07m (3.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $532,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 81071,  Location: 4.0 N. CHATTAROY (Lat: 47.945786,  Lng: -117.353283),  Route carried "on" structure: County highway 1337,  Year Built: 1961,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 72 (year 2042),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: FINDLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $250,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82971,  Location: 1.0 MILES N. SR 2 (Lat: 48.001067,  Lng: -117.354353),  Route carried "on" structure: County highway 5259,  Year Built: 1915,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 98 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 141 (year 2041),  Design Load: H 15,  Features Intersected: WEST BRANCH CREEK,  Facility Carried by Structure: WEST BRANCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.02m (9.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,505,000,  Roadway Improvement Cost: $301,000,  Total Project Cost: $3,010,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 84185,  Location: 3.0 S DEER PARK (Lat: 47.887944,  Lng: -117.423231),  Route carried "on" structure: County highway 3366,  Year Built: 1935,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 152 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 218 (year 2042),  Design Load: H 15,  Features Intersected: DRAGOON CREEK,  Facility Carried by Structure: NORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $96,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $192,000 ( Estimate for 2014),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 8474,  Location: 00.2 W MILAN (Lat: 47.969536,  Lng: -117.333778),  Route carried "on" structure: County highway 853,  Year Built: 1954,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,046 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,946 (year 2041),  Design Load: HS 15,  Features Intersected: LITTLE SPOKANE RIVER,  Facility Carried by Structure: DEER PARK-MILAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $790,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $1,581,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84791,  Location: 0.75 E PSH NO 195 (Lat: 47.964489,  Lng: -117.333881),  Route carried "on" structure: County highway 3033,  Year Built: 1964,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 218 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 313 (year 2041),  Design Load: HS 15,  Features Intersected: LITTLE SPOKANE RIVER,  Facility Carried by Structure: MILAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $654,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,307,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 86209,  Location: 0.8 N WILD ROSE RD (Lat: 47.885972,  Lng: -117.465344),  Route carried "on" structure: County highway 810,  Year Built: 1996,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 269 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 387 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: DRAGOON CREEK,  Facility Carried by Structure: DALTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $546,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 865,  Location: 0.5 E MONROE ROAD (Lat: 47.903408,  Lng: -117.487231),  Route carried "on" structure: County highway 4618,  Year Built: 2000,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 1,241 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 1,787 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: DRAGOON CREEK,  Facility Carried by Structure: STALEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,488,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $2,976,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89009,  Location: 0.9 MI N. STALEY ROAD (Lat: 47.915678,  Lng: -117.498292),  Route carried "on" structure: County highway 3066,  Year Built: 2018,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 1,092 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,572 (year 2041),  Design Load: HL 93,  Features Intersected: W. BRANCH DRAGOON CREEK,  Facility Carried by Structure: MONROE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,155,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing