  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 154ft / 47.3mTotal length
  • $14,322,000Total costs
  • 141,957Total average daily traffic
  • 45,928Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Depew
  • No street view available for this location

New bridges in Depew, OK - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 71950-1959
  • 11960-1969
  • 31970-1979
  • 31980-1989
  • 21990-1999
  • 32010-2019
Average Bridge Daily Traffic in Depew, OK
Average Bridge Truck Traffic in Depew, OK
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 35.7%Satisfactory
  • 21.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 21.4%Good
  • 28.6%Satisfactory
  • 28.6%Fair
  • 7.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 14.3%Good
  • 21.4%Satisfactory
  • 42.9%Fair
  • 7.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 21.1%Very good
  • 52.6%Good
  • 15.8%Satisfactory
  • 10.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 28.6%Very good
  • 57.1%Good
  • 14.3%Satisfactory
Find on map >>   Show street view

Structure Number: 1806,  Location: 8.1 MI E LINCOLN C/L (Lat: 35.808456,  Lng: -96.492683),  Route carried "on" structure: State highway 66,  Year Built: 1927,  Year Reconstructed: 1973,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,700 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,320 (year 2040),  Design Load: H 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 5573,  Location: .3S .7E 3.4S OF DEPEW (Lat: 35.749883,  Lng: -96.494242),  Route carried "on" structure: County highway N3660,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 16.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $246,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 5896,  Location: .2W 1.2S .1W OF DEPEW (Lat: 35.784294,  Lng: -96.515011),  Route carried "on" structure: County highway E0850,  Year Built: 1938,  Status: Posted for load,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.1m (23.3ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 30.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $246,000 ( Estimate for 2015),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 12892,  Location: 55.7 MI N E JCT I-35 (Lat: 35.821425,  Lng: -96.482189),  Route carried "on" structure: Interstate 44,  Year Built: 1953,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 37,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.837,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 53.6m (175.9ft),  Out-to-Out Width: 54.3m (178.1ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 12894,  Location: 56.5 MI'S N E JCT I-35 (Lat: 35.825353,  Lng: -96.468406),  Route carried "on" structure: Interstate 44,  Year Built: 1953,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 37,600 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.125,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 36.9m (121.1ft),  Out-to-Out Width: 37.5m (123.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $360,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 13049,  Location: 52.1 MI N E JCT I-35 (Lat: 35.805867,  Lng: -96.540467),  Route carried "on" structure: County highway D3630,  Year Built: 1953,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,000 (year 2040),  Design Load: H 15,  Features Intersected: TURNER TP (I-44) UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.045,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $743,000,  Total Project Cost: $1,422,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1307,  Location: 53.8 MI N E JCT I-35 (Lat: 35.813608,  Lng: -96.512064),  Route carried "on" structure: Interstate 44,  Year Built: 1953,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 37,600 (year 2040),  Design Load: HS 20,  Features Intersected: CO. RD. N3650 UNDER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.878,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.36m (14.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $545,000,  Roadway Improvement Cost: $818,000,  Total Project Cost: $1,563,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13106,  Location: 53.7 MI N E JCT I-35 (Lat: 35.812939,  Lng: -96.514450),  Route carried "on" structure: Interstate 44,  Year Built: 1953,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Average Future Daily Traffic: 37,600 (year 2040),  Design Load: H 20,  Features Intersected: LITTLE DEEP FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.684,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.08m (33.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,259,000,  Roadway Improvement Cost: $1,889,000,  Total Project Cost: $3,588,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18398,  Location: 9.0 MI E LINCOLN C/L (Lat: 35.813403,  Lng: -96.477811),  Route carried "on" structure: State highway 66,  Year Built: 1973,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,640 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.610,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18399,  Location: 9.6 MI E LINCOLN C/L (Lat: 35.814325,  Lng: -96.467114),  Route carried "on" structure: State highway 66,  Year Built: 1973,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,900 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,640 (year 2040),  Design Load: HS 20,  Features Intersected: SWAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.591,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 18556,  Location: 7.9 MI E LINCOLN C/L (Lat: 35.807017,  Lng: -96.495400),  Route carried "on" structure: State highway 66,  Year Built: 1973,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 2,700 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 4,320 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE DEEP FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.743,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.92m (29.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $725,000,  Roadway Improvement Cost: $1,197,000,  Total Project Cost: $2,031,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 20457,  Location: 7.0 MI E LINCOLN C/L (Lat: 35.806169,  Lng: -96.510394),  Route carried "on" structure: State highway 66,  Year Built: 1983,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,200 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.409,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $644,000 ( Estimate for 2015)
Find on map >>   Show street view

Structure Number: 21932,  Location: 5N 1E .2N OF MILFAY (Lat: 35.831881,  Lng: -96.547842),  Route carried "on" structure: County highway N3630,  Year Built: 1988,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: LITTLE DEEP FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.28m (17.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 22592,  Location: .4W 1.5N 1.1W OF DEPEW (Lat: 35.827911,  Lng: -96.534200),  Route carried "on" structure: County highway E0820,  Year Built: 1990,  Status: Posted for load,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: LITTLE DEEP FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.8m (19.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 31.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $474,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23208,  Location: .2W .2N .2W 2.5N OF DEPEW (Lat: 35.842544,  Lng: -96.512253),  Route carried "on" structure: County highway N3650,  Year Built: 1980,  Status: Posted for load,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.8m (25.6ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $159,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $251,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 2321,  Location: .3S 2.7E .3N OF DEPEW (Lat: 35.804394,  Lng: -96.458581),  Route carried "on" structure: County highway N3680,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 207 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 331 (year 2040),  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.101,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 19.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.92m (9.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $236,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 24394,  Location: .3S 2.7E .9N OF DEPEW (Lat: 35.813483,  Lng: -96.458594),  Route carried "on" structure: County highway N3680,  Year Built: 1992,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 200 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 320 (year 2040),  Design Load: HS 20,  Features Intersected: LITTLE DEEP FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.101,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.36m (20.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $519,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26693,  Location: 4.5W OF SH48/SH16 (Lat: 35.827997,  Lng: -96.469081),  Route carried "on" structure: County highway E0820,  Year Built: 1960,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 50 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: SWAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.72m (8.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $225,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 31175,  Location: 1.7E .2N OF DEPEW (Lat: 35.805833,  Lng: -96.476389),  Route carried "on" structure: County highway N3670,  Year Built: 2013,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Features Intersected: LITTLE DEEP FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31324,  Location: 5.3E OF MILFAY (Lat: 35.755278,  Lng: -96.470006),  Route carried "on" structure: County highway E0870,  Year Built: 2014,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31864,  Location: .2W .3N of DEPEW (Lat: 35.811889,  Lng: -96.512242),  Route carried "on" structure: County highway N3650,  Year Built: 2018,  Status: Open,  Structure Length: 4.62m (15.16ft),  Average Daily Traffic: 100 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 160 (year 2040),  Design Load: H 20,  Features Intersected: LITTLE DEEP FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13049,  Location: 52.1 MI N E JCT I-35 (Lat: 35.805867,  Lng: -96.540467),  Route carried "under" structure: Interstate 44,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 36%,  Features Intersected: TURNER TP (I-44) UNDER,  Facility Carried by Structure: CO. RD. D3630
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 8.158,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.6m (38.1ft)

Find on map >>   Show street view

Structure Number: 1307,  Location: 53.8 MI N E JCT I-35 (Lat: 35.813608,  Lng: -96.512064),  Route carried "under" structure: County highway N3650,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 15%,  Features Intersected: CO. RD. N3650 UNDER,  Facility Carried by Structure: TURNER TP (I-44)
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 10.779,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 9.8m (32.2ft)