Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Deposit, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 197ft / 60.3mTotal length
  • $28,477,000Total costs
  • 26,921Total average daily traffic
  • 3,613Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Deposit
  • No street view available for this location

New bridges in Deposit, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 21950-1959
  • 71960-1969
  • 11970-1979
  • 31980-1989
  • 31990-1999
Reconstructed bridges in Deposit, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 62000-2009
Average Bridge Daily Traffic in Deposit, NY
Average Bridge Truck Traffic in Deposit, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 75.0%Good
  • 16.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Good
  • 41.7%Satisfactory
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 10.0%Good
  • 30.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Serious
Find on map >>   Show street view

Structure Number: 100442,  Location: 1.4 MI N JCT RTS 8 + 10 (Lat: 42.098217,  Lng: -75.389150),  Route carried "on" structure: State highway 8,  Year Built: 1932,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 1,346 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,358 (year 2040),  Features Intersected: E BRCOLDSPRING CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.130,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $1,014,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1007631,  Location: JCT RTS 17 + 10 (Lat: 42.051722,  Lng: -75.414875),  Route carried "on" structure: State highway 17,  Year Built: 1961,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 3,270 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,102 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,285,000,  Roadway Improvement Cost: $753,000,  Total Project Cost: $2,038,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1007632,  Location: JCT RTS 17 + 10 (Lat: 42.051581,  Lng: -75.415089),  Route carried "on" structure: State highway 17,  Year Built: 1962,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 3,270 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,102 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.788,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.11m (13.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,090,000,  Roadway Improvement Cost: $639,000,  Total Project Cost: $1,729,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100764,  Location: .7 MI NW JCT SH 10 & SH17 (Lat: 42.061189,  Lng: -75.417086),  Route carried "on" structure: Other road ,  Year Built: 1990,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 3,228 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,519 (year 2037),  Design Load: HS 20,  Features Intersected: W BR DELAWARE RVR,  Facility Carried by Structure: OAK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.3m (115.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,768,000,  Roadway Improvement Cost: $1,035,000,  Total Project Cost: $2,803,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100766,  Location: .7 MI S JCT SH 8 & SH 10 (Lat: 42.079681,  Lng: -75.399075),  Route carried "on" structure: State highway 8,  Year Built: 1990,  Status: Open,  Structure Length: 16.31m (53.51ft),  Average Daily Traffic: 1,681 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,696 (year 2040),  Design Load: HS 20,  Features Intersected: W BR DELAWARE RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.685,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.30m (53.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,500,000,  Roadway Improvement Cost: $2,635,000,  Total Project Cost: $7,134,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013341,  Location: .3 MI NW JCT SH 17 & SH 1 (Lat: 42.055064,  Lng: -75.418806),  Route carried "on" structure: State highway 17,  Year Built: 1962,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 7.83m (25.69ft),  Average Daily Traffic: 3,221 (year 2009),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,025 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CENTRAL NY RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 13.8m (45.3ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.83m (25.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,680,000,  Roadway Improvement Cost: $1,569,000,  Total Project Cost: $4,249,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1013342,  Location: .3 MI NW JCT SH 17 & SH 1 (Lat: 42.054758,  Lng: -75.418683),  Route carried "on" structure: State highway 17,  Year Built: 1962,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 6.74m (22.11ft),  Average Daily Traffic: 3,221 (year 2009),  Truck Traffic: 19%,  Average Future Daily Traffic: 5,025 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CENTRAL NY RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.73m (22.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,829,000,  Roadway Improvement Cost: $1,071,000,  Total Project Cost: $2,900,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106333,  Location: 0.1 MI NW JCT RTS 10 + 8 (Lat: 42.080497,  Lng: -75.401822),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 490 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 686 (year 2038),  Design Load: HS 15,  Features Intersected: COLD SPRING CREEK,  Facility Carried by Structure: OLD ROUTE 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.3m (33.8ft)

Condition: Channel: Satisfactory,  Culverts: Serious,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $543,000,  Roadway Improvement Cost: $318,000,  Total Project Cost: $860,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 10727,  Location: 1 MI NE JCT SH 17 & SH 10 (Lat: 42.065694,  Lng: -75.415061),  Route carried "on" structure: State highway ,  Year Built: 1984,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,114 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,560 (year 2038),  Design Load: HS 20,  Features Intersected: BUTLER BROOK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 4.5m (14.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $923,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 222671,  Location: 3 MI NE STILESVILLE (Lat: 42.108206,  Lng: -75.363456),  Route carried "on" structure: Other road ,  Year Built: 1950,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 6 (year 2039),  Design Load: HS 20,  Features Intersected: E BR COLD SPRING BOOK,  Facility Carried by Structure: MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $302,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 226767,  Location: VILLAGE OF DEPOSIT (Lat: 42.058208,  Lng: -75.420658),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 513 (year 2016),  Truck Traffic: 18%,  Average Future Daily Traffic: 718 (year 2036),  Design Load: H 20,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: LAURELBANK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $799,000,  Roadway Improvement Cost: $468,000,  Total Project Cost: $1,267,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334961,  Location: VILLAGE OF DEPOSIT (Lat: 42.059578,  Lng: -75.426797),  Route carried "on" structure: Other road ,  Year Built: 1956,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 709 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 993 (year 2036),  Design Load: HS 20,  Features Intersected: OQUAGA CREEK,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,082,000,  Roadway Improvement Cost: $634,000,  Total Project Cost: $1,716,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33523,  Location: 1.3 MI N OF STILESVILLE (Lat: 42.097814,  Lng: -75.393275),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 315 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 441 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: E B COLD SPRNG CK,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $642,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335231,  Location: 3 MILES N OF STILESVILLE (Lat: 42.121972,  Lng: -75.397808),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 315 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 441 (year 2038),  Design Load: HS 20,  Features Intersected: COLD SPRING CREEK,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.864,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $754,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 336734,  Location: 2.8 MI N OF STILESVILLE (Lat: 42.117958,  Lng: -75.396319),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 315 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 441 (year 2038),  Design Load: H 20,  Features Intersected: COLD SPRING CREEK,  Facility Carried by Structure: COUNTY ROAD 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.397,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $146,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1007631,  Location: JCT RTS 17 + 10 (Lat: 42.051722,  Lng: -75.414875),  Route carried "under" structure: State highway 10,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 1,600 (year 1971),  Features Intersected: RTE 10,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 6.43m (21.10ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.7m (54.8ft)

Find on map >>   Show street view

Structure Number: 1007632,  Location: JCT RTS 17 + 10 (Lat: 42.051581,  Lng: -75.415089),  Route carried "under" structure: State highway 10,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 1,600 (year 1971),  Features Intersected: RTE 10,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 77022,  Location: VILLAGE OF DEPOSIT (Lat: 42.060044,  Lng: -75.427075),  Route carried "under" structure: County highway ,  Year Built: 1920,  Structure Length: 0. m,  Average Daily Traffic: 709 (year 2016),  Truck Traffic: 8%,  Features Intersected: COUNTY ROAD 237,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 2.76m (9.06ft),  Kilometerpoint: 0.467,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 11.8m (38.7ft)

Discuss Deposit, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.