Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dix Hills, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 118ft / 35.5mTotal length
  • $43,728,000Total costs
  • 951,975Total average daily traffic
  • 19,745Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dix Hills
  • No street view available for this location

New bridges in Dix Hills, NY - historical statistics
  • New bridges - historical statistics
  • 61940-1949
  • 41950-1959
  • 61960-1969
  • 22010-2019
Average Bridge Daily Traffic in Dix Hills, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 14.3%Good
  • 42.9%Satisfactory
  • 28.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Very good
  • 22.2%Good
  • 55.6%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Very good
  • 55.6%Good
  • 11.1%Satisfactory
  • 22.2%Fair
Find on map >>   Show street view

Structure Number: 104933,  Location: .6 MI W JCT RTS 231+495 (Lat: 40.793647,  Lng: -73.352831),  Route carried "on" structure: Other road ,  Year Built: 1963,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 4,914 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,080 (year 2040),  Design Load: H 20,  Features Intersected: 495I495I07031050 W/B, RT,  Facility Carried by Structure: HALF HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.326,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.07m (26.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,760,000,  Roadway Improvement Cost: $2,202,000,  Total Project Cost: $5,962,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1049341,  Location: JCT I495 & SH 231 (Lat: 40.797606,  Lng: -73.342181),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 80,648 (year 2002),  Truck Traffic: 13%,  Design Load: HS 20+Mod,  Features Intersected: 231 231 07011072 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.994,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.24m (20.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $5,248,000,  Roadway Improvement Cost: $3,073,000,  Total Project Cost: $8,322,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1049342,  Location: JCT I495 & SH 231 (Lat: 40.797317,  Lng: -73.342136),  Route carried "on" structure: Interstate 495,  Year Built: 1963,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 73,249 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 76,911 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 231 231 07011072, RTE 23
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.010,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.24m (20.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $5,248,000,  Roadway Improvement Cost: $3,073,000,  Total Project Cost: $8,322,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 104935,  Location: 1.2 MI E JCT RTS 231+495 (Lat: 40.803314,  Lng: -73.320186),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 3,851 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,678 (year 2040),  Design Load: HL 93,  Features Intersected: 495I495I07031069, WB, RT,  Facility Carried by Structure: CARLLS STRGT PATH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.671,  Lanes on structure: 3,  Lanes under structure: 9,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.39m (17.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,093,000,  Roadway Improvement Cost: $1,811,000,  Total Project Cost: $4,904,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 105737,  Location: 1.1 MI W JCT SH 231 & NSP (Lat: 40.825328,  Lng: -73.364508),  Route carried "on" structure: Other road ,  Year Built: 1949,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 2,564 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,590 (year 2039),  Design Load: H 20,  Features Intersected: RTE 908G,  Facility Carried by Structure: DIX HILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $951,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 105837,  Location: 1.1 MI W JCT RTS 231+NSP (Lat: 40.825161,  Lng: -73.364381),  Route carried "on" structure: Other road ,  Year Built: 1949,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 2,564 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,172 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908G,  Facility Carried by Structure: DIX HILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $951,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1058399,  Location: JCT NSP + RTE 231 (Lat: 40.823489,  Lng: -73.343403),  Route carried "on" structure: State highway 908G,  Year Built: 1950,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 70,309 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 83,632 (year 2040),  Design Load: H 20,  Features Intersected: RTE 231
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.796,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 21.8m (71.5ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $3,365,000,  Roadway Improvement Cost: $1,971,000,  Total Project Cost: $5,336,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1058409,  Location: 2.6 MI E JCT RTS 231+NSP (Lat: 40.818558,  Lng: -73.293583),  Route carried "on" structure: State highway 908G,  Year Built: 1951,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 70,309 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 83,632 (year 2040),  Design Load: H 20,  Features Intersected: COMMACK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.398,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 25.8m (84.6ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $3,785,000,  Roadway Improvement Cost: $2,217,000,  Total Project Cost: $6,002,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 205838,  Location: 2.2 MI NE JCT SH 231 + I4 (Lat: 40.825542,  Lng: -73.364686),  Route carried "on" structure: Other road ,  Year Built: 1949,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 2,564 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,590 (year 2039),  Design Load: H 20,  Features Intersected: OLD COUNTRY RD,  Facility Carried by Structure: DIX HILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Maintenance Responsibility: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,878,000,  Roadway Improvement Cost: $1,100,000,  Total Project Cost: $2,978,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104933,  Location: .6 MI W JCT RTS 231+495 (Lat: 40.793647,  Lng: -73.352831),  Route carried "under" structure: Interstate 495,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 197,421 (year 2002),  Features Intersected: 495I495I07031050 W/B, RT,  Facility Carried by Structure: HALF HOLLOW RD
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 8.045,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 1049341,  Location: JCT I495 & SH 231 (Lat: 40.797606,  Lng: -73.342181),  Route carried "under" structure: State highway 231,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 31,376 (year 2002),  Features Intersected: 231 231 07011072 NB, RTE,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 11.778,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 1049342,  Location: JCT I495 & SH 231 (Lat: 40.797317,  Lng: -73.342136),  Route carried "under" structure: State highway 231,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 31,376 (year 2002),  Features Intersected: 231 231 07011072, RTE 23,  Facility Carried by Structure: RTE I495
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 11.778,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 104935,  Location: 1.2 MI E JCT RTS 231+495 (Lat: 40.803314,  Lng: -73.320186),  Route carried "under" structure: Interstate 495,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 155,816 (year 2002),  Features Intersected: 495I495I07031069, WB, RT,  Facility Carried by Structure: CARLLS STRGT PATH
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 11.038,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 105737,  Location: 1.1 MI W JCT SH 231 & NSP (Lat: 40.825328,  Lng: -73.364508),  Route carried "under" structure: State highway 908G,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 71,543 (year 2002),  Features Intersected: RTE 908G,  Facility Carried by Structure: DIX HILLS ROAD
Minimum Vertical Clearance: 3.78m (12.40ft),  Kilometerpoint: 7.273,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 105837,  Location: 1.1 MI W JCT RTS 231+NSP (Lat: 40.825161,  Lng: -73.364381),  Route carried "under" structure: State highway 908G,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 71,543 (year 2002),  Features Intersected: RTE 908G,  Facility Carried by Structure: DIX HILLS ROAD
Minimum Vertical Clearance: 3.78m (12.40ft),  Kilometerpoint: 7.273,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 1058399,  Location: JCT NSP + RTE 231 (Lat: 40.823489,  Lng: -73.343403),  Route carried "under" structure: State highway 231,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 31,376 (year 2002),  Features Intersected: RTE 231,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 14.481,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 1058409,  Location: 2.6 MI E JCT RTS 231+NSP (Lat: 40.818558,  Lng: -73.293583),  Route carried "under" structure: County highway ,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 43,052 (year 2005),  Features Intersected: COMMACK ROAD,  Facility Carried by Structure: RTE 908G
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 18.8m (61.7ft)

Find on map >>   Show street view

Structure Number: 205838,  Location: 2.2 MI NE JCT SH 231 + I4 (Lat: 40.825542,  Lng: -73.364686),  Route carried "under" structure: Other road ,  Year Built: 1949,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2021),  Features Intersected: OLD COUNTRY RD,  Facility Carried by Structure: DIX HILLS ROAD
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 19.2m (63.0ft)

Discuss Dix Hills, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.