Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Dora, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 499ft / 152mTotal length
  • $67,109,000Total costs
  • 126,434Total average daily traffic
  • 24,421Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Dora
  • No street view available for this location

New bridges in Dora, AL - historical statistics
  • New bridges - historical statistics
  • 31940-1949
  • 31950-1959
  • 11970-1979
  • 11990-1999
  • 82000-2009
  • 12020-2022
Average Bridge Daily Traffic in Dora, AL
Average Bridge Truck Traffic in Dora, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 38.5%Good
  • 23.1%Satisfactory
  • 23.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Very good
  • 53.8%Good
  • 15.4%Satisfactory
  • 23.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Very good
  • 46.2%Good
  • 30.8%Satisfactory
  • 7.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Very good
  • 25.0%Good
  • 16.7%Satisfactory
  • 25.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 2227,  Location: 1 MILE S DORA (Lat: 33.716667,  Lng: -87.083333),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 1,000 (year 1991),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,400 (year 2032),  Features Intersected: BURNT CANE CREEK,  Facility Carried by Structure: SHARON BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $342,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $376,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2228,  Location: 2 MILES S DORA (Lat: 33.716667,  Lng: -87.083333),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 1,000 (year 1991),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,400 (year 2032),  Features Intersected: BURNT CANE CREEK,  Facility Carried by Structure: SHARON BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $493,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2229,  Location: 1 MILE S DORA (Lat: 33.716667,  Lng: -87.083333),  Route carried "on" structure: County highway ,  Year Built: 1940,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 200 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 350 (year 2032),  Features Intersected: BURNT CANE CREEK,  Facility Carried by Structure: BURNWELL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $294,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4013,  Location: @ Horse Creek Golf Course (Lat: 33.751356,  Lng: -87.059011),  Route carried "on" structure: State highway 5,  Year Built: 1951,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 11,250 (year 2013),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,085 (year 2041),  Design Load: HS 20,  Features Intersected: Horse Creek Trail
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 252.519,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 24 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,763,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $3,039,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11045,  Location: US 78 @ WALKER CO. LN. (Lat: 33.739600,  Lng: -87.030900),  Route carried "on" structure: State highway 5,  Year Built: 1952,  Year Reconstructed: 1974,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 14,660 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 18,354 (year 2040),  Design Load: H 15,  Features Intersected: MORGAN BRANCH
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 248.854,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,812,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,993,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11812,  Location: WEST BRYAN ROAD (Lat: 33.730861,  Lng: -87.075083),  Route carried "on" structure: Alternate City street 29,  Year Built: 1977,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2041),  Features Intersected: BURNT CANE CREEK,  Facility Carried by Structure: SELLERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.249,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $219,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16219,  Location: JCT. REID RD. (Lat: 33.728944,  Lng: -87.065917),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2041),  Design Load: H 15,  Features Intersected: BURNT CANE CREEK,  Facility Carried by Structure: SELLERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.750,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $348,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17421,  Location: 1MI W OF CR-81 (Lat: 33.685406,  Lng: -87.103778),  Route carried "on" structure: Interstate 22,  Year Built: 2004,  Status: Open,  Structure Length: 16.46m (54.00ft),  Average Daily Traffic: 9,140 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 12,383 (year 2041),  Design Load: HS 20,  Features Intersected: Burnt Caine Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 124.483,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 17.20m (56.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $6,840,000,  Roadway Improvement Cost: $684,000,  Total Project Cost: $7,524,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17422,  Location: 1MI West of CR- 81 (Lat: 33.685769,  Lng: -87.103633),  Route carried "on" structure: Interstate 22,  Year Built: 2004,  Status: Open,  Structure Length: 16.46m (54.00ft),  Average Daily Traffic: 9,140 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 12,383 (year 2041),  Design Load: HS 20,  Features Intersected: Burnt Caine Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 124.483,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 17.20m (56.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $6,840,000,  Roadway Improvement Cost: $684,000,  Total Project Cost: $7,524,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17787,  Location: River Rd @ I-22 MM 76.2 (Lat: 33.692594,  Lng: -87.122828),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 500 (year 2005),  Average Future Daily Traffic: 750 (year 2041),  Design Load: HS 20,  Features Intersected: I-22,  Facility Carried by Structure: River Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,351,000,  Roadway Improvement Cost: $235,000,  Total Project Cost: $2,586,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17788,  Location: Barney Beach (Lat: 33.709261,  Lng: -87.147222),  Route carried "on" structure: Interstate 22,  Year Built: 2003,  Status: Open,  Structure Length: 37.80m (124.02ft),  Average Daily Traffic: 9,140 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 12,383 (year 2041),  Design Load: HS 20,  Features Intersected: Mulberry Fork Warrior
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.735,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: Toll bridge is a segment,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Navigation Control: Yes ( Vertical Clearance: 21.9m (71.9ft), Horizontal Clearance: 76.2m (250.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 83.8m (274.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 37.80m (124.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $15,031,000,  Roadway Improvement Cost: $1,503,000,  Total Project Cost: $16,534,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17789,  Location: Barney Beach (Lat: 33.709133,  Lng: -87.145017),  Route carried "on" structure: Interstate 22,  Year Built: 2005,  Status: Open,  Structure Length: 37.80m (124.02ft),  Average Daily Traffic: 9,140 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 12,383 (year 2041),  Design Load: HS 20,  Features Intersected: Mulberry Fork Warrior
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.735,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: Toll bridge is a segment,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Navigation Control: Yes ( Vertical Clearance: 21.9m (71.9ft), Horizontal Clearance: 70.1m (230.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 5,  Length of Maximum Span: 83.8m (274.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 37.80m (124.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $15,031,000,  Roadway Improvement Cost: $1,503,000,  Total Project Cost: $16,534,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1827,  Location: I-22 over CR-81 (Lat: 33.679117,  Lng: -87.084011),  Route carried "on" structure: Interstate 22,  Year Built: 2004,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 25,062 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 30,000 (year 2040),  Design Load: HS 20,  Features Intersected: Dora Flat Creek Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 126.494,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.31m (33.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $4,102,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $4,512,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18274,  Location: I-22 over CR-81 (Lat: 33.679419,  Lng: -87.083967),  Route carried "on" structure: Interstate 22,  Year Built: 2004,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 25,062 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 30,000 (year 2040),  Design Load: HS 20,  Features Intersected: CR-81
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 126.494,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.3m (119.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.31m (33.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $4,102,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $4,512,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20884,  Location: .04MI S OF HORSECREEK BLV (Lat: 33.736864,  Lng: -87.098136),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 500 (year 2014),  Average Future Daily Traffic: 500 (year 2041),  Design Load: HS 20,  Features Intersected: HORSECREEK,  Facility Carried by Structure: UNION CAMP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.54m (5.05ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $214,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $235,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21626,  Location: .1 mlies from Horse Creek (Lat: 0.000278,  Lng: -0.000278),  Route carried "on" structure: City street ,  Year Built: 2021,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 500 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2041),  Design Load: HS 20,  Features Intersected: Horse Creek,  Facility Carried by Structure: Commerce Ave
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.33m (7.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17787,  Location: River Rd @ I-22 MM 76.2 (Lat: 33.692594,  Lng: -87.122828),  Route carried "under" structure: Interstate 22,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 9,140 (year 2013),  Truck Traffic: 22%,  Features Intersected: I-22,  Facility Carried by Structure: River Road
Minimum Vertical Clearance: 7.99m (26.21ft),  Kilometerpoint: 122.632,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.7m (140.1ft)

Discuss Dora, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.