Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Douglassville, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 131ft / 40.4mTotal length
  • $3,453,000Total costs
  • 122,663Total average daily traffic
  • 10,168Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Douglassville
  • No street view available for this location

New bridges in Douglassville, PA - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21940-1949
  • 11950-1959
  • 71960-1969
  • 11970-1979
  • 12010-2019
Reconstructed bridges in Douglassville, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Douglassville, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 25.0%Fair
  • 12.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Satisfactory
  • 57.1%Fair
  • 14.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 487,  Location: US422EB-OLD 422EB JUNCT. (Lat: 40.254553,  Lng: -75.721214),  Route carried "on" structure: US 422,  Year Built: 1941,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 300 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 23,222 (year 2032),  Design Load: HS 20,  Features Intersected: LEAFS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.642,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 4871,  Location: US 422WB-OLD 422 JUNCT. (Lat: 40.255331,  Lng: -75.721292),  Route carried "on" structure: US 422,  Year Built: 1967,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 16,567 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,126 (year 2032),  Design Load: HS 20,  Features Intersected: LEAF'S RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.515,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 13 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020
Find on map >>   Show street view

Structure Number: 4872,  Location: DOUGLASSVILLE (Lat: 40.254358,  Lng: -75.720072),  Route carried "on" structure: US 422,  Year Built: 1967,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 16,551 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 24,208 (year 2032),  Design Load: HS 20,  Features Intersected: SR 2022 EB(LR 146 PAR.)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.515,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $13,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $179,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 4873,  Location: 1 MI.W.OF MONTGOMERY LINE (Lat: 40.253089,  Lng: -75.719406),  Route carried "on" structure: US 422,  Year Built: 1967,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 32,428 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 47,430 (year 2032),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN RR
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 50.348,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 34 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 22.0m (72.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $390,000,  Total Project Cost: $1,790,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4874,  Location: W.OF MONTGOMERY CO LINE (Lat: 40.250472,  Lng: -75.717867),  Route carried "on" structure: US 422,  Year Built: 1967,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 32,428 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 47,430 (year 2032),  Design Load: HS 20,  Features Intersected: OLD PHILADEPHIA PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.854,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.1m (79.1ft),  Skew: 34 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 24.1m (79.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $334,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4918,  Location: 1.3M.W OF CHESTER CO LINE (Lat: 40.248122,  Lng: -75.721122),  Route carried "on" structure: State highway 724,  Year Built: 1949,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 7,757 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,674 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB SCHUYLKILL RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.985,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Underwater Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 5122,  Location: TOWNSHIPLINE&TOLLGATE RDS (Lat: 40.263211,  Lng: -75.715997),  Route carried "on" structure: State highway ,  Year Built: 1914,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 393 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 858 (year 2032),  Design Load: HS 20,  Features Intersected: LEAF CREEK,  Facility Carried by Structure: SR 2057(LR 06204)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $70,000,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5132,  Location: DOUGLASSVILLE BRIDGE (Lat: 40.249194,  Lng: -75.725614),  Route carried "on" structure: Spur State highway ,  Year Built: 1951,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 18.71m (61.38ft),  Average Daily Traffic: 4,266 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,111 (year 2032),  Design Load: HL 93,  Features Intersected: SCHUYLKILL RIVER,  Facility Carried by Structure: SR 2077(147 SP)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 19.40m (63.65ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2019,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $1,080,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5316,  Location: LEAF CREEK BRIDGE (Lat: 40.249667,  Lng: -75.724864),  Route carried "on" structure: Other road 110,  Year Built: 1971,  Status: Posted for load,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,149 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,161 (year 2024),  Design Load: HS 20,  Features Intersected: LEAF CREEK,  Facility Carried by Structure: OLD PHILY PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 547,  Location: NEAR CHESTER COUNTY (Lat: 40.239450,  Lng: -75.713672),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 500 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2019),  Design Load: HS 20,  Features Intersected: NORRIS CREEK,  Facility Carried by Structure: UNIONVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 48312,  Location: DOUGLASSVILLE (Lat: 40.254292,  Lng: -75.724175),  Route carried "on" structure: Spur State highway ,  Year Built: 2013,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 4,266 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,111 (year 2032),  Design Load: HL 93,  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: SR2077 (LR147SP)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 3.9m (12.8ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4872,  Location: DOUGLASSVILLE (Lat: 40.254358,  Lng: -75.720072),  Route carried "under" structure: State highway ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 5,958 (year 2022),  Truck Traffic: 8%,  Features Intersected: SR 2022 EB(LR 146 PAR.),  Facility Carried by Structure: SR 422WB(LR 1041)
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 4874,  Location: W.OF MONTGOMERY CO LINE (Lat: 40.250472,  Lng: -75.717867),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 1994),  Features Intersected: OLD PHILADEPHIA PIKE,  Facility Carried by Structure: US 422(LR 1041)
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 15.5m (50.9ft)

Discuss Douglassville, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.