Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Durham, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 177ft / 53.8mTotal length
  • $23,392,000Total costs
  • 16,510Total average daily traffic
  • 1,210Total average daily truck traffic
  • 19,492Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Durham
  • No street view available for this location

New bridges in Durham, NY - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 41960-1969
  • 41970-1979
  • 31980-1989
  • 51990-1999
  • 72000-2009
Reconstructed bridges in Durham, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 02000-2009
  • 32010-2019
Average Bridge Daily Traffic in Durham, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 13.0%Excellent
  • 34.8%Very good
  • 8.7%Good
  • 30.4%Satisfactory
  • 8.7%Fair
  • 4.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 20.8%Very good
  • 29.2%Good
  • 8.3%Satisfactory
  • 20.8%Fair
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.3%Excellent
  • 29.2%Very good
  • 25.0%Good
  • 8.3%Satisfactory
  • 25.0%Fair
  • 4.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 8.3%Good
  • 41.7%Satisfactory
  • 37.5%Fair
  • 4.2%Poor
Find on map >>   Show street view

Structure Number: 1031,  Location: 3.2 MI SE JCT SH81 &SH145 (Lat: 42.411592,  Lng: -74.153953),  Route carried "on" structure: State highway 81,  Year Built: 1993,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 2,074 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,163 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SQUIRMER VLLY CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.850,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,008,000,  Roadway Improvement Cost: $590,000,  Total Project Cost: $1,598,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103101,  Location: 4.3 MI SE JCT RTS 81 & 14 (Lat: 42.406153,  Lng: -74.135753),  Route carried "on" structure: State highway 81,  Year Built: 1990,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 2,074 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,163 (year 2040),  Design Load: HS 20,  Features Intersected: TEN MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.733,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Very good,  Channel: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $914,000,  Roadway Improvement Cost: $535,000,  Total Project Cost: $1,449,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103815,  Location: 3.4 MI NE JCT SH23/SH145 (Lat: 42.353853,  Lng: -74.070881),  Route carried "on" structure: State highway 145,  Year Built: 2003,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 3,481 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,712 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BOWERY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.112,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,205,000,  Roadway Improvement Cost: $705,000,  Total Project Cost: $1,910,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103816,  Location: 1.2 MI W JCT RTS 145 &67A (Lat: 42.376672,  Lng: -74.104903),  Route carried "on" structure: State highway 145,  Year Built: 1998,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 2,936 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,131 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: THORP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.006,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,138,000,  Roadway Improvement Cost: $666,000,  Total Project Cost: $1,804,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 236779,  Location: 2 MI N OF SH23-OFF HERVEY (Lat: 42.354783,  Lng: -74.130550),  Route carried "on" structure: Other road ,  Year Built: 1940,  Year Reconstructed: 2003,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 12 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 17 (year 2038),  Features Intersected: THORP CREEK,  Facility Carried by Structure: STIEHL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.4m (14.4ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 4.4m (14.4ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $144,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $228,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320081,  Location: 2 MILES SE OF DURHAM (Lat: 42.378881,  Lng: -74.152450),  Route carried "on" structure: Other road ,  Year Built: 1962,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 188 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 263 (year 2040),  Features Intersected: CORNWALLVILLE CRK,  Facility Carried by Structure: STONE BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $310,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 320082,  Location: 1.5.MI SW FREEHOLD (Lat: 42.351497,  Lng: -74.072428),  Route carried "on" structure: Other road ,  Year Built: 2003,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 192 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 269 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: BOWERY CREEK,  Facility Carried by Structure: SUNSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $560,000,  Roadway Improvement Cost: $328,000,  Total Project Cost: $887,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320083,  Location: 2 MI SW FREEHOLD (Lat: 42.343769,  Lng: -74.076500),  Route carried "on" structure: Other road ,  Year Built: 1974,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 192 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 269 (year 2039),  Features Intersected: BOWERY CREEK,  Facility Carried by Structure: SUNSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Fair,  Operating Rating: 66.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $723,000,  Roadway Improvement Cost: $423,000,  Total Project Cost: $1,146,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 320084,  Location: 1 MI E OAK HILL (Lat: 42.413989,  Lng: -74.129800),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 60 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 84 (year 2039),  Design Load: HS 20,  Features Intersected: TEN MILE CREEK,  Facility Carried by Structure: SAYBROOK VALLEY RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.175,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $629,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320085,  Location: 1 MILE NE OF DURHAM-SR145 (Lat: 42.405864,  Lng: -74.156036),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 31 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 43 (year 2039),  Design Load: HS 20,  Features Intersected: DURHAM CREEK,  Facility Carried by Structure: POULTNEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $345,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $547,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 320086,  Location: 1 MI NE HMLT DURHAM (Lat: 42.401483,  Lng: -74.166833),  Route carried "on" structure: Other road ,  Year Built: 2009,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 10 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 14 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: DURHAM CREEK,  Facility Carried by Structure: Hamm Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 5.3m (17.4ft),  Out-to-Out Width: 6.3m (20.7ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Excellent,  Channel: Fair,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $262,000,  Total Project Cost: $711,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320087,  Location: 3 MILES SE OF DURHAM (Lat: 42.370056,  Lng: -74.146528),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 93 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 130 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CORNWALLVILLE CRK,  Facility Carried by Structure: ROCKWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Excellent,  Channel: Satisfactory,  Inventory Rating: 88.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $321,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $509,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320089,  Location: 1 MI E HAMLET OF E DURHAM (Lat: 42.372044,  Lng: -74.109214),  Route carried "on" structure: Other road ,  Year Built: 1981,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 143 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 200 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: THORPE CREEK,  Facility Carried by Structure: GOLDEN HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $401,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32009,  Location: .5 MILE NE OF EAST DURHAM (Lat: 42.373289,  Lng: -74.094989),  Route carried "on" structure: Other road ,  Year Built: 1967,  Status: Posted for load,  Structure Length: 2.62m (8.60ft),  Truck Traffic: 6%,  Design Load: HS 20,  Features Intersected: Thorpe Creek,  Facility Carried by Structure: Stonebridge Road E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.089,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.0m,  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 7.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $555,000,  Roadway Improvement Cost: $325,000,  Total Project Cost: $880,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 320092,  Location: 4 MI SE DURHAM (Lat: 42.360906,  Lng: -74.127861),  Route carried "on" structure: Other road ,  Year Built: 1974,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 81 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 113 (year 2036),  Design Load: HL 93,  Features Intersected: THORP CREEK,  Facility Carried by Structure: HERVEY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.89m (2.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $366,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330307,  Location: 0.5 MI.SE.EAST DURHAM (Lat: 42.368483,  Lng: -74.083103),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 1,166 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,632 (year 2036),  Features Intersected: CORNWALLVILLE CRK,  Facility Carried by Structure: County Road 67A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $753,000,  Roadway Improvement Cost: $441,000,  Total Project Cost: $1,194,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330308,  Location: 1 MI NE HMLT OF E DURHAM (Lat: 42.373481,  Lng: -74.079550),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 1,166 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,632 (year 2036),  Design Load: HS 20,  Features Intersected: CATSKILL CREEK,  Facility Carried by Structure: COUNTY ROAD 67A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.2m (164.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.86m (25.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,466,000,  Roadway Improvement Cost: $859,000,  Total Project Cost: $2,325,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330309,  Location: 1 MI N HAMLET OF E DURHAM (Lat: 42.385989,  Lng: -74.090311),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 187 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 262 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: UNKNOWN BROOK,  Facility Carried by Structure: WRIGHT ST CR 67
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.678,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.79m (5.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $753,000,  Roadway Improvement Cost: $441,000,  Total Project Cost: $1,194,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33031,  Location: 2 MI E HAMLET OF DURHAM (Lat: 42.402083,  Lng: -74.133381),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 1,249 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,749 (year 2037),  Features Intersected: CATSKILL CREEK,  Facility Carried by Structure: DEANS MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.158,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.6m (93.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $958,000,  Roadway Improvement Cost: $561,000,  Total Project Cost: $1,518,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 330311,  Location: 2 MI SE OF EAST DURHAM (Lat: 42.340622,  Lng: -74.078372),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 245 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 343 (year 2037),  Features Intersected: BOWERY CREEK,  Facility Carried by Structure: SUNSIDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.146,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $364,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330312,  Location: IN HAMLET OF OAK HILL (Lat: 42.405942,  Lng: -74.151675),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 460 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 644 (year 2037),  Design Load: HS 20,  Features Intersected: CATSKILL CREEK,  Facility Carried by Structure: COUNTY ROAD 22
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.365,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,069,000,  Roadway Improvement Cost: $626,000,  Total Project Cost: $1,695,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330313,  Location: 0.5 MI.E.DURHAM (Lat: 42.399464,  Lng: -74.171136),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 262 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 367 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: DURHAM CREEK,  Facility Carried by Structure: OAK HILL-DURHAM RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Inventory Rating: 87.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $486,000,  Roadway Improvement Cost: $285,000,  Total Project Cost: $771,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330314,  Location: 1.5 MI S OF DURHAM (Lat: 42.366147,  Lng: -74.153794),  Route carried "on" structure: County highway ,  Year Built: 1961,  Year Reconstructed: 1995,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 104 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 146 (year 2036),  Features Intersected: CORNWALLVILLE CREEK,  Facility Carried by Structure: CORNWALLVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.063,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 11.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $573,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330315,  Location: 5 MI.SE.HMLT.DURHAM (Lat: 42.361147,  Lng: -74.121353),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 104 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 146 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: THORP CREEK,  Facility Carried by Structure: CORNWALLVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.199,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.0m (49.2ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $141,000,  Total Project Cost: $383,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Durham, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.