Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for East Farmingdale, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 69ft / 20.6mTotal length
  • $52,497,000Total costs
  • 1,448,216Total average daily traffic
  • 13,038Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for East Farmingdale
  • No street view available for this location

New bridges in East Farmingdale, NY - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 41940-1949
  • 71950-1959
  • 41960-1969
Average Bridge Daily Traffic in East Farmingdale, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 37.5%Good
  • 37.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 37.5%Good
  • 37.5%Satisfactory
Find on map >>   Show street view

Structure Number: 1036929,  Location: JCT RTS 109+SSP (Lat: 40.718067,  Lng: -73.407917),  Route carried "on" structure: State highway 109,  Year Built: 1940,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 37,252 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 42,981 (year 2040),  Features Intersected: RTE 908M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.2m (63.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,911,000,  Roadway Improvement Cost: $2,876,000,  Total Project Cost: $7,786,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1036939,  Location: JCT RTS 109+110 (Lat: 40.722714,  Lng: -73.424861),  Route carried "on" structure: State highway 110,  Year Built: 1956,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 36,426 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 42,028 (year 2040),  Design Load: H 20,  Features Intersected: 109 109 0701 1054, E/B,
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.953,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.54m (18.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $5,818,000,  Roadway Improvement Cost: $3,407,000,  Total Project Cost: $9,225,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1036959,  Location: .1 MI S JCT RTS 109+110 (Lat: 40.721561,  Lng: -73.425458),  Route carried "on" structure: State highway 110,  Year Built: 1956,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 36,426 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 42,028 (year 2040),  Design Load: HS 20,  Features Intersected: LIRR-CENTRAL BRCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.841,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.0m (75.5ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,987,000,  Roadway Improvement Cost: $2,335,000,  Total Project Cost: $6,321,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105775,  Location: .1 MI N JCT SH 109 & SSP (Lat: 40.719361,  Lng: -73.406658),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 7,970 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,681 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: NEW HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,150,000,  Roadway Improvement Cost: $1,259,000,  Total Project Cost: $3,408,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105776,  Location: .7 MI E JCT SH 109 & SSP (Lat: 40.721394,  Lng: -73.394553),  Route carried "on" structure: County highway ,  Year Built: 1960,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 23,923 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 29,061 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: WELLWOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 6,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 86.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,572,000,  Roadway Improvement Cost: $2,677,000,  Total Project Cost: $7,249,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1057929,  Location: JCT RTS 109+SSP (Lat: 40.718197,  Lng: -73.408156),  Route carried "on" structure: State highway 109,  Year Built: 1961,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 32,755 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 37,792 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.269,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 22 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $5,480,000,  Roadway Improvement Cost: $3,209,000,  Total Project Cost: $8,689,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 105975,  Location: .1 MI N JCT SH 109 & SSP (Lat: 40.719128,  Lng: -73.406542),  Route carried "on" structure: City street ,  Year Built: 1941,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 7,970 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,681 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: NEW HIGHWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,150,000,  Roadway Improvement Cost: $1,259,000,  Total Project Cost: $3,408,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 105976,  Location: .7 MI E JCT SH 109 & SSP (Lat: 40.721228,  Lng: -73.394478),  Route carried "on" structure: County highway ,  Year Built: 1934,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 23,923 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,061 (year 2040),  Design Load: H 20,  Features Intersected: RTE 908M,  Facility Carried by Structure: WELLWOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 6,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 25.2m (82.7ft)

Condition: Superstructure: Good,  Substructure: Very good,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,043,000,  Roadway Improvement Cost: $2,368,000,  Total Project Cost: $6,411,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1036929,  Location: JCT RTS 109+SSP (Lat: 40.718067,  Lng: -73.407917),  Route carried "under" structure: State highway 908M,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 147,331 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: RTE 109
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 2.494,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 1036939,  Location: JCT RTS 109+110 (Lat: 40.722714,  Lng: -73.424861),  Route carried "under" structure: State highway 109,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 33,109 (year 1985),  Features Intersected: 109 109 0701 1054, E/B,,  Facility Carried by Structure: RTE 110
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 8.785,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.0m (55.8ft)

Find on map >>   Show street view

Structure Number: 105775,  Location: .1 MI N JCT SH 109 & SSP (Lat: 40.719361,  Lng: -73.406658),  Route carried "under" structure: State highway 908M,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 147,331 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: NEW HIGHWAY
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 2.623,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 105776,  Location: .7 MI E JCT SH 109 & SSP (Lat: 40.721394,  Lng: -73.394553),  Route carried "under" structure: State highway 908M,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 136,975 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: WELLWOOD AVENUE
Minimum Vertical Clearance: 4.09m (13.42ft),  Kilometerpoint: 3.701,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 1057929,  Location: JCT RTS 109+SSP (Lat: 40.718197,  Lng: -73.408156),  Route carried "under" structure: State highway 908M,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 147,331 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: RTE 109
Minimum Vertical Clearance: 4.17m (13.68ft),  Kilometerpoint: 2.494,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 22.5m (73.8ft)

Find on map >>   Show street view

Structure Number: 105975,  Location: .1 MI N JCT SH 109 & SSP (Lat: 40.719128,  Lng: -73.406542),  Route carried "under" structure: State highway 908M,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 147,331 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: NEW HIGHWAY
Minimum Vertical Clearance: 3.99m (13.09ft),  Kilometerpoint: 2.623,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 105976,  Location: .7 MI E JCT SH 109 & SSP (Lat: 40.721228,  Lng: -73.394478),  Route carried "under" structure: State highway 908M,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 136,975 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: WELLWOOD AVENUE
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 3.701,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 703697,  Location: 1.2 MI N JCT RTS 109+110 (Lat: 40.739992,  Lng: -73.423161),  Route carried "under" structure: State highway 110,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 58,384 (year 2002),  Features Intersected: RTE 110,  Facility Carried by Structure: LONG ISLAND
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 7.997,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 705631,  Location: .9 MI E JCT RTS 110+109 (Lat: 40.717261,  Lng: -73.408592),  Route carried "under" structure: Other road 908M,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 143,402 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: LIRR BABYLON
Minimum Vertical Clearance: 4.14m (13.58ft),  Kilometerpoint: 2.381,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>   Show street view

Structure Number: 705731,  Location: .9 MI E JCT RTS 110+109 (Lat: 40.717333,  Lng: -73.408883),  Route carried "under" structure: Other road 908M,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 143,402 (year 2002),  Features Intersected: RTE 908M,  Facility Carried by Structure: LIRR-BABYLON
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 2.381,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.7m (67.9ft)

Discuss East Farmingdale, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.