Bridge Statistics for East Greenbush, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 95ft / 28.7mTotal length
  • $22,647,000Total costs
  • 187,466Total average daily traffic
  • 14,954Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for East Greenbush
  • No street view available for this location

New bridges in East Greenbush, NY - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 21960-1969
  • 91970-1979
Average Bridge Daily Traffic in East Greenbush, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 57.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Satisfactory
  • 42.9%Fair
  • 14.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Satisfactory
  • 57.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Satisfactory
  • 25.0%Fair
  • 25.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 100092,  Location: 0.4 MI N JCT RTS 4 & 9 (Lat: 42.603925,  Lng: -73.707131),  Route carried "on" structure: US 4,  Year Built: 1930,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 11,740 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,795 (year 2040),  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 97.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $472,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $749,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 107043,  Location: .2 MI E JCT I90 & SH 151 (Lat: 42.621014,  Lng: -73.688725),  Route carried "on" structure: State highway 151,  Year Built: 1937,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,910 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,600 (year 2040),  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.179,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 72.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $417,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 109263,  Location: JCT OF RTS I90 & 4 (Lat: 42.627394,  Lng: -73.700467),  Route carried "on" structure: US 4,  Year Built: 1968,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 18,630 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,717 (year 2040),  Design Load: HS 20,  Features Intersected: 90I 90I14022024WB, RTE I
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.282,  Lanes on structure: 4,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.4m (122.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 21.4m (70.2ft),  Out-to-Out Width: 22.8m (74.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $4,372,000,  Roadway Improvement Cost: $2,560,000,  Total Project Cost: $6,932,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092641,  Location: JCT RTS I90 & 151 (Lat: 42.620625,  Lng: -73.691628),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 27,810 (year 2006),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: RTE 151
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.331,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,617,000,  Roadway Improvement Cost: $947,000,  Total Project Cost: $2,563,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092642,  Location: JCT RTS I90 & 151 (Lat: 42.620583,  Lng: -73.691992),  Route carried "on" structure: Interstate 90,  Year Built: 1970,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 16,602 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,308 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 151
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.969,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,658,000,  Roadway Improvement Cost: $971,000,  Total Project Cost: $2,629,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092659,  Location: 0.1 MI S JCT RT I90 & 151 (Lat: 42.620067,  Lng: -73.691681),  Route carried "on" structure: Interstate 90,  Year Built: 1971,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 33,203 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 52,616 (year 2040),  Design Load: H 20,  Features Intersected: MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.018,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $917,000,  Roadway Improvement Cost: $537,000,  Total Project Cost: $1,454,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109266,  Location: 1.5 MI S JCT RT I90 & 151 (Lat: 42.600700,  Lng: -73.681864),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 883 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,092 (year 2040),  Design Load: HS 20,  Features Intersected: 90I 90I 1402 2045 WB, RT,  Facility Carried by Structure: ELLIOT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.333,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.58m (21.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,929,000,  Roadway Improvement Cost: $1,130,000,  Total Project Cost: $3,059,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092671,  Location: 1.9 MI N EXIT 10 OF I90 (Lat: 42.588464,  Lng: -73.676611),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 27,810 (year 2006),  Truck Traffic: 9%,  Design Load: HS 20,  Features Intersected: UNFINISHED ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.702,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,425,000,  Roadway Improvement Cost: $835,000,  Total Project Cost: $2,260,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1092672,  Location: 1.9 MI N EXIT 10 OF I90 (Lat: 42.588428,  Lng: -73.676972),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 16,602 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 26,308 (year 2040),  Design Load: HS 20,  Features Intersected: UNFINISHED ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.718,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,385,000,  Roadway Improvement Cost: $811,000,  Total Project Cost: $2,196,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 220157,  Location: 1 MI NW OF EAST GREENBUSH (Lat: 42.606567,  Lng: -73.710269),  Route carried "on" structure: Other road ,  Year Built: 1938,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 196 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 274 (year 2036),  Design Load: HS 20,  Features Intersected: MILL CREEK,  Facility Carried by Structure: OLD TROY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $245,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $388,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 109263,  Location: JCT OF RTS I90 & 4 (Lat: 42.627394,  Lng: -73.700467),  Route carried "under" structure: Interstate 90,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 11,300 (year 1972),  Features Intersected: 90I 90I14022024WB, RTE I,  Facility Carried by Structure: RTE 4
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 3.540,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.4m (122.7ft)

Find on map >>   Show street view

Structure Number: 1092641,  Location: JCT RTS I90 & 151 (Lat: 42.620625,  Lng: -73.691628),  Route carried "under" structure: State highway 151,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 3,990 (year 1997),  Features Intersected: RTE 151,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 4.505,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 1092642,  Location: JCT RTS I90 & 151 (Lat: 42.620583,  Lng: -73.691992),  Route carried "under" structure: State highway 151,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 3,990 (year 1997),  Features Intersected: RTE 151,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 4.505,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 109266,  Location: 1.5 MI S JCT RT I90 & 151 (Lat: 42.600700,  Lng: -73.681864),  Route carried "under" structure: Interstate 90,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 11,800 (year 1973),  Features Intersected: 90I 90I 1402 2045 WB, RT,  Facility Carried by Structure: ELLIOT ROAD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 18.761,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)