Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Eastport, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 266ft / 81.2mTotal length
  • $80,506,000Total costs
  • 256,600Total average daily traffic
  • 9,166Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eastport
  • No street view available for this location

New bridges in Eastport, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 21960-1969
  • 201970-1979
Average Bridge Daily Traffic in Eastport, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 46.2%Good
  • 53.8%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.8%Good
  • 53.8%Satisfactory
  • 7.7%Fair
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.1%Good
  • 69.2%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: 1019401,  Location: EXIT 61 OF S.H.27 (Lat: 40.834369,  Lng: -72.746728),  Route carried "on" structure: State highway 27,  Year Built: 1963,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 16,767 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 19,944 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 51, NB, COUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.611,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,929,000,  Roadway Improvement Cost: $2,886,000,  Total Project Cost: $7,815,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105632,  Location: 14.1 MI E SH 112 & SH 27 (Lat: 40.833386,  Lng: -72.747642),  Route carried "on" structure: Ramp State highway ,  Year Built: 1970,  Status: Open,  Structure Length: 11.16m (36.61ft),  Average Daily Traffic: 6,926 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,238 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 51, NB, COUN,  Facility Carried by Structure: 27COL-DST RD EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.15m (36.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,865,000,  Roadway Improvement Cost: $3,435,000,  Total Project Cost: $9,300,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056331,  Location: 14.4 MI E RTS 112+27 (Lat: 40.836144,  Lng: -72.741647),  Route carried "on" structure: State highway 27,  Year Built: 1970,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 11,184 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,303 (year 2040),  Design Load: HS 20,  Features Intersected: County Road 55 , SB, COU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.158,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,465,000,  Roadway Improvement Cost: $2,029,000,  Total Project Cost: $5,493,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056332,  Location: 14.4 MI E RTS 112+27 (Lat: 40.835878,  Lng: -72.741644),  Route carried "on" structure: State highway 27,  Year Built: 1970,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 11,184 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,303 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.158,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,465,000,  Roadway Improvement Cost: $2,029,000,  Total Project Cost: $5,493,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056341,  Location: EXIT 62 - SUNRISE HWY (Lat: 40.844097,  Lng: -72.723939),  Route carried "on" structure: State highway 27,  Year Built: 1970,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 17,866 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,251 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 111, COUNTY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.896,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,282,000,  Roadway Improvement Cost: $3,093,000,  Total Project Cost: $8,375,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1056342,  Location: EXIT 62 - SUNRISE HWY (Lat: 40.843814,  Lng: -72.723767),  Route carried "on" structure: State highway 27,  Year Built: 1970,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 17,866 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,251 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 111, COUNTY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.896,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $5,282,000,  Roadway Improvement Cost: $3,093,000,  Total Project Cost: $8,375,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105635,  Location: 17 MI E RTS 112+27 (Lat: 40.852622,  Lng: -72.696828),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 2,140 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 2,599 (year 2040),  Design Load: HS 20,  Features Intersected: 27 27 07051408, RTE 27,  Facility Carried by Structure: SPEONK-RIVERHD RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.719,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.6m (103.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,129,000,  Roadway Improvement Cost: $2,418,000,  Total Project Cost: $6,547,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 105652,  Location: EXIT 61 OF SH 27 (Lat: 40.834967,  Lng: -72.746178),  Route carried "on" structure: Ramp State highway ,  Year Built: 1970,  Status: Open,  Structure Length: 10.27m (33.69ft),  Average Daily Traffic: 3,958 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,708 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 51, NB, COUN,  Facility Carried by Structure: 27 SERVICE RD WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.27m (33.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $5,458,000,  Roadway Improvement Cost: $3,196,000,  Total Project Cost: $8,654,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 226114,  Location: .5 MILE EAST OF EASTPORT (Lat: 40.824100,  Lng: -72.724492),  Route carried "on" structure: Other road ,  Year Built: 1907,  Year Reconstructed: 1990,  Status: Posted for load,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 289 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 405 (year 2037),  Design Load: Pedestrian,  Features Intersected: LONG ISLAND-MK BR,  Facility Carried by Structure: RIVER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 5.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.01m (9.88ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $1,380,000,  Roadway Improvement Cost: $808,000,  Total Project Cost: $2,187,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 3364411,  Location: 1 MI N OF EASTPORT (Lat: 40.848358,  Lng: -72.740136),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 12,265 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,588 (year 2040),  Design Load: HS 20,  Features Intersected: TOPPINGS PATH ROW,  Facility Carried by Structure: PORT JEFFERSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.657,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,440,000,  Roadway Improvement Cost: $1,429,000,  Total Project Cost: $3,868,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3364412,  Location: 1 MI N OF EASTPORT (Lat: 40.848581,  Lng: -72.740122),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 12,265 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,588 (year 2040),  Design Load: HS 20,  Features Intersected: TOPPINGS PATH ROW,  Facility Carried by Structure: PORT JEFFERSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.657,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,385,000,  Roadway Improvement Cost: $1,397,000,  Total Project Cost: $3,781,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 3364421,  Location: 1 MI N OF EASTPORT (Lat: 40.846667,  Lng: -72.735356),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 12,265 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,588 (year 2040),  Design Load: HS 20,  Features Intersected: EAST MORICHES RD (EB Dir,  Facility Carried by Structure: PORT JEFFERSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,348,000,  Roadway Improvement Cost: $1,961,000,  Total Project Cost: $5,309,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 3364422,  Location: 1 MI N OF EASTPORT (Lat: 40.846839,  Lng: -72.735208),  Route carried "on" structure: County highway ,  Year Built: 1974,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 12,265 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 14,588 (year 2040),  Design Load: HS 20,  Features Intersected: EAST MORICHES RD, EAST M,  Facility Carried by Structure: Port Jefferson Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.82m (22.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,348,000,  Roadway Improvement Cost: $1,961,000,  Total Project Cost: $5,309,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1019401,  Location: EXIT 61 OF S.H.27 (Lat: 40.834369,  Lng: -72.746728),  Route carried "under" structure: Alternate County highway ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2021),  Features Intersected: COUNTY ROAD 51, NB, COUN,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 105632,  Location: 14.1 MI E SH 112 & SH 27 (Lat: 40.833386,  Lng: -72.747642),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,412 (year 2004),  Features Intersected: COUNTY ROAD 51, NB, COUN,  Facility Carried by Structure: 27COL-DST RD EB
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 1056331,  Location: 14.4 MI E RTS 112+27 (Lat: 40.836144,  Lng: -72.741647),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 12,433 (year 2003),  Features Intersected: County Road 55 , SB, COU,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 1056332,  Location: 14.4 MI E RTS 112+27 (Lat: 40.835878,  Lng: -72.741644),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 12,433 (year 2003),  Features Intersected: COUNTY ROAD 55,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 1056341,  Location: EXIT 62 - SUNRISE HWY (Lat: 40.844097,  Lng: -72.723939),  Route carried "under" structure: Alternate County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 16,301 (year 2005),  Features Intersected: COUNTY ROAD 111, COUNTY,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 1056342,  Location: EXIT 62 - SUNRISE HWY (Lat: 40.843814,  Lng: -72.723767),  Route carried "under" structure: Alternate County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 16,301 (year 2005),  Features Intersected: COUNTY ROAD 111, COUNTY,  Facility Carried by Structure: RTE 27
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 105635,  Location: 17 MI E RTS 112+27 (Lat: 40.852622,  Lng: -72.696828),  Route carried "under" structure: State highway 27,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 15,200 (year 1969),  Features Intersected: 27 27 07051408, RTE 27,  Facility Carried by Structure: SPEONK-RIVERHD RD
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 65.647,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.6m (103.7ft)

Find on map >>   Show street view

Structure Number: 105652,  Location: EXIT 61 OF SH 27 (Lat: 40.834967,  Lng: -72.746178),  Route carried "under" structure: County highway ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,412 (year 2004),  Features Intersected: COUNTY ROAD 51, NB, COUN,  Facility Carried by Structure: 27 SERVICE RD WB
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.3m (102.7ft)

Find on map >>   Show street view

Structure Number: 3364421,  Location: 1 MI N OF EASTPORT (Lat: 40.846667,  Lng: -72.735356),  Route carried "under" structure: County highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 10,434 (year 2004),  Features Intersected: EAST MORICHES RD (EB Dir,  Facility Carried by Structure: PORT JEFFERSON RD
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.5m (73.8ft)

Find on map >>   Show street view

Structure Number: 3364422,  Location: 1 MI N OF EASTPORT (Lat: 40.846839,  Lng: -72.735208),  Route carried "under" structure: County highway ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 10,434 (year 2004),  Features Intersected: EAST MORICHES RD, EAST M,  Facility Carried by Structure: Port Jefferson Rd.
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.5m (73.8ft)

Discuss Eastport, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.