Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Eastview, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 105ft / 32.4mTotal length
  • $3,913,000Total costs
  • 50,025Total average daily traffic
  • 5,098Total average daily truck traffic
  • 81,852Total future (year 2040) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eastview
  • No street view available for this location

New bridges in Eastview, TN - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 21950-1959
  • 11970-1979
  • 21980-1989
  • 41990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Eastview, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 42.9%Good
  • 28.6%Satisfactory
  • 28.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 57.1%Good
  • 14.3%Satisfactory
  • 28.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.8%Good
  • 61.5%Satisfactory
  • 7.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 51018380001,  Location: 9 M. SE. HOHENWALD. (Lat: 35.438867,  Lng: -87.475017),  Route carried "on" structure: County highway 1838,  Year Built: 1958,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 492 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 787 (year 2041),  Design Load: H 20,  Features Intersected: CHIEF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $166,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 51018420005,  Location: 4.5 M. NE. HOHENWALD. (Lat: 35.607300,  Lng: -87.477017),  Route carried "on" structure: County highway 1842,  Year Built: 1958,  Status: Posted for load,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 434 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 694 (year 2042),  Features Intersected: INDIAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.582,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 27.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $525,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $788,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55016550001,  Location: 2 MI E OF EASTVIEW (Lat: 35.067667,  Lng: -88.520250),  Route carried "on" structure: County highway 1655,  Year Built: 2016,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 307 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 464 (year 2040),  Design Load: HL 93,  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.429,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 550A2560001,  Location: 2 MI N OF SR57 (Lat: 35.090056,  Lng: -88.507417),  Route carried "on" structure: County highway 256,  Year Built: 1975,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 112 (year 2041),  Design Load: H 15,  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.953,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $305,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 550A3220001,  Location: 0.1 MI W OF EASTVIEW (Lat: 35.084472,  Lng: -88.559306),  Route carried "on" structure: County highway 322,  Year Built: 1984,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 90 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 144 (year 2040),  Design Load: HS 20,  Features Intersected: ROLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.664,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 550A3290001,  Location: 5 MI E OF EASTVIEW (Lat: 35.095306,  Lng: -88.499083),  Route carried "on" structure: County highway 329,  Year Built: 1984,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.220,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 55SR0050003,  Location: .5 MI.SOUTH OF EASTVIEW (Lat: 35.056250,  Lng: -88.537278),  Route carried "on" structure: US 45,  Year Built: 1928,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 9,366 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,360 (year 2040),  Design Load: HS 20,  Features Intersected: BRUSHY CREEK,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.985,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 24.3m (79.7ft),  Out-to-Out Width: 43.0m (141.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 55SR0050005,  Location: IN EASTVIEW CITY LIMITS (Lat: 35.092861,  Lng: -88.552250),  Route carried "on" structure: US 45,  Year Built: 1997,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 10,710 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,648 (year 2040),  Design Load: HS 20,  Features Intersected: ROLAND CREEK,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.51m (11.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,313,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,970,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55SR0050007,  Location: IN EASTVIEW CITY LIMITS (Lat: 35.132528,  Lng: -88.568417),  Route carried "on" structure: US 45,  Year Built: 1997,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 10,710 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,648 (year 2040),  Design Load: HS 20,  Features Intersected: OXFORD CREEK,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.933,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 25.6m (84.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55SR0050041,  Location: 1 MI N OF MISSISSIPPI (Lat: 35.123528,  Lng: -88.564722),  Route carried "on" structure: US 45,  Year Built: 2001,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 10,710 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,648 (year 2040),  Design Load: HS 20,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.854,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.77m (2.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $425,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 55SR0570017,  Location: .5 MI.WEST OF EASTVIEW (Lat: 35.073861,  Lng: -88.566750),  Route carried "on" structure: State highway 57,  Year Built: 1999,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 2,252 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,568 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.549,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.5m (18.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55SR0570019,  Location: .2 MI.WEST OF EASTVIEW (Lat: 35.074611,  Lng: -88.561389),  Route carried "on" structure: State highway 57,  Year Built: 1998,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 2,252 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,568 (year 2040),  Design Load: HS 20,  Features Intersected: ROLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.032,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.7m (74.5ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 55SR0570021,  Location: 1.5 MILE EAST OF EASTVIEW (Lat: 35.077167,  Lng: -88.513944),  Route carried "on" structure: State highway 57,  Year Built: 1948,  Status: Posted for load,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 2,612 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,179 (year 2041),  Design Load: H 20,  Features Intersected: MUDDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.442,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $259,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Eastview, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.