Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Edgewood, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 92ft / 28.1mTotal length
  • $2,494,000Total costs
  • 500,944Total average daily traffic
  • 21,338Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Edgewood
  • No street view available for this location

Average Bridge Daily Traffic in Edgewood, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Good
  • 71.4%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Good
  • 57.1%Satisfactory
Find on map >>   Show street view

Structure Number: 1171,  Location: PARKWAY EAST-BRADDOCK AVE (Lat: 40.428333,  Lng: -79.966667),  Route carried "on" structure: Interstate 376,  Year Built: 1951,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 90,610 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 56,372 (year 2032),  Design Load: HS 20,  Features Intersected: BRADDOCK AVE,  Facility Carried by Structure: PARKWAY EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.959,  Lanes on structure: 4,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $42,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $572,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1173,  Location: 3/4 MI. WEST OF SR 2051 (Lat: 40.429728,  Lng: -79.884881),  Route carried "on" structure: State highway ,  Year Built: 1951,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 386 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 527 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: PARKWAY EAST,  Facility Carried by Structure: LAUREL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $406,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1176,  Location: EDGEWOOD AVE.O/PARKWAY (Lat: 40.429872,  Lng: -79.884389),  Route carried "on" structure: State highway ,  Year Built: 1951,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 6,195 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,497 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: 376 EB WB,  Facility Carried by Structure: EDGEWOOD AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1177,  Location: CHESTNUT O/PARKWAY EAST (Lat: 40.428333,  Lng: -79.883333),  Route carried "on" structure: State highway ,  Year Built: 1950,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 203 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 394 (year 2032),  Design Load: HS 20,  Features Intersected: LR 763,906+78,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $211,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1581,  Location: BRINTON RD.OVER 376 EB WB (Lat: 40.429700,  Lng: -79.875294),  Route carried "on" structure: State highway ,  Year Built: 1950,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 5.49m (18.01ft),  Average Daily Traffic: 5,739 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,884 (year 2032),  Design Load: HS 20,  Features Intersected: SR 0376 EB WB,  Facility Carried by Structure: BRINTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.388,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 50.0m (164.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $1,108,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 2762,  Location: RP.B OVER BRADDOCK AVE. (Lat: 40.428333,  Lng: -79.966667),  Route carried "on" structure: Ramp State highway ,  Year Built: 1952,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 2,441 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,140 (year 2032),  Design Load: HS 20,  Features Intersected: BRADDOCK AVE.,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $197,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 2766,  Location: RAMP E OVER BRADDOCK AVE (Lat: 40.428333,  Lng: -79.966667),  Route carried "on" structure: Ramp State highway ,  Year Built: 1952,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 4,930 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,778 (year 2032),  Design Load: HS 20,  Features Intersected: BRADDOCK AVENUE,  Facility Carried by Structure: RAMP E 8010 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1171,  Location: PARKWAY EAST-BRADDOCK AVE (Lat: 40.428333,  Lng: -79.966667),  Route carried "under" structure: City street ,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2005),  Truck Traffic: 4%,  Features Intersected: BRADDOCK AVE,  Facility Carried by Structure: PARKWAY EAST
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 1173,  Location: 3/4 MI. WEST OF SR 2051 (Lat: 40.429728,  Lng: -79.884881),  Route carried "under" structure: Interstate 376,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 47,343 (year 2022),  Truck Traffic: 4%,  Features Intersected: PARKWAY EAST,  Facility Carried by Structure: LAUREL ST
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 43.959,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 1173,  Location: 3/4 MI. WEST OF SR 2051 (Lat: 40.429728,  Lng: -79.884881),  Route carried "under" structure: Interstate 376,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 43,267 (year 2022),  Truck Traffic: 5%,  Features Intersected: PARKWAY EAST,  Facility Carried by Structure: LAUREL ST
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 43.901,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 1176,  Location: EDGEWOOD AVE.O/PARKWAY (Lat: 40.429872,  Lng: -79.884389),  Route carried "under" structure: Interstate 376,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 43,267 (year 2022),  Truck Traffic: 5%,  Features Intersected: 376 EB WB,  Facility Carried by Structure: EDGEWOOD AVENUE
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 43.901,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 1176,  Location: EDGEWOOD AVE.O/PARKWAY (Lat: 40.429872,  Lng: -79.884389),  Route carried "under" structure: Interstate 376,  Year Built: 1951,  Structure Length: 0. m,  Average Daily Traffic: 47,343 (year 2022),  Truck Traffic: 4%,  Features Intersected: 376 EB WB,  Facility Carried by Structure: EDGEWOOD AVENUE
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 44.764,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 1177,  Location: CHESTNUT O/PARKWAY EAST (Lat: 40.428333,  Lng: -79.883333),  Route carried "under" structure: Interstate 376,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 43,267 (year 2022),  Truck Traffic: 5%,  Features Intersected: LR 763,906+78,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 44.757,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 1177,  Location: CHESTNUT O/PARKWAY EAST (Lat: 40.428333,  Lng: -79.883333),  Route carried "under" structure: Interstate 376,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 47,343 (year 2022),  Truck Traffic: 4%,  Features Intersected: LR 763,906+78,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 44.764,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 1581,  Location: BRINTON RD.OVER 376 EB WB (Lat: 40.429700,  Lng: -79.875294),  Route carried "under" structure: Interstate 376,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 47,343 (year 2022),  Truck Traffic: 4%,  Features Intersected: SR 0376 EB WB,  Facility Carried by Structure: BRINTON ROAD
Minimum Vertical Clearance: 11.40m (37.40ft),  Kilometerpoint: 45.569,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 1581,  Location: BRINTON RD.OVER 376 EB WB (Lat: 40.429700,  Lng: -79.875294),  Route carried "under" structure: Interstate 376,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 43,267 (year 2022),  Truck Traffic: 5%,  Features Intersected: SR 0376 EB WB,  Facility Carried by Structure: BRINTON ROAD
Minimum Vertical Clearance: 9.94m (32.61ft),  Kilometerpoint: 45.496,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 2762,  Location: RP.B OVER BRADDOCK AVE. (Lat: 40.428333,  Lng: -79.966667),  Route carried "under" structure: City street ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 1997),  Truck Traffic: 1%,  Features Intersected: BRADDOCK AVE.,  Facility Carried by Structure: RAMP B
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 2766,  Location: RAMP E OVER BRADDOCK AVE (Lat: 40.428333,  Lng: -79.966667),  Route carried "under" structure: City street ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 1997),  Truck Traffic: 1%,  Features Intersected: BRADDOCK AVENUE,  Facility Carried by Structure: RAMP E 8010 EB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Edgewood, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.