Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Elberta, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 138ft / 42.1mTotal length
  • $14,311,000Total costs
  • 50,122Total average daily traffic
  • 1,413Total average daily truck traffic
  • 72,970Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Elberta
  • No street view available for this location

New bridges in Elberta, AL - historical statistics
  • New bridges - historical statistics
  • 51980-1989
  • 51990-1999
  • 12000-2009
  • 32010-2019
Average Bridge Daily Traffic in Elberta, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 63.6%Good
  • 36.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 81.8%Good
  • 18.2%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Very good
  • 72.7%Good
  • 18.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Excellent
  • 28.6%Very good
  • 28.6%Good
  • 28.6%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Excellent
  • 33.3%Very good
Find on map >>   Show street view

Structure Number: 13045,  Location: 1.8 MI. N. OF CO. RD. 32 (Lat: 30.500539,  Lng: -87.581678),  Route carried "on" structure: County highway 87,  Year Built: 1983,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,224 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,653 (year 2038),  Design Load: HS 20,  Features Intersected: NEGRO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Underwater Inspection Date: December 2018,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13357,  Location: 1.9 MI. N. OF CO. RD. 32 (Lat: 30.501728,  Lng: -87.581678),  Route carried "on" structure: County highway 87,  Year Built: 1984,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,246 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,682 (year 2038),  Design Load: HS 20,  Features Intersected: NEGRO CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14587,  Location: 3.5 MI E SR 59 (Lat: 30.406881,  Lng: -87.626383),  Route carried "on" structure: US 98,  Year Built: 1988,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 12,774 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,161 (year 2039),  Design Load: HS 20,  Features Intersected: OAK POND BRANCH WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.600,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $974,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,071,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14588,  Location: 3.6 MI E SR 59 (Lat: 30.406875,  Lng: -87.625003),  Route carried "on" structure: US 98,  Year Built: 1988,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 12,774 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,161 (year 2039),  Design Load: HS 20,  Features Intersected: OAK POND BRANCH EAST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.736,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.38m (11.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $974,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,071,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14589,  Location: 0.4 MI E CO 83 (Lat: 30.414317,  Lng: -87.591792),  Route carried "on" structure: US 98,  Year Built: 1988,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 10,420 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,630 (year 2039),  Design Load: HS 20,  Features Intersected: MIFLIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.153,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.61m (15.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,328,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,461,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16027,  Location: 2.8 MI. W. OF CO. RD. 87 (Lat: 30.363906,  Lng: -87.602453),  Route carried "on" structure: County highway 20,  Year Built: 1995,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 2,237 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,020 (year 2039),  Design Load: HS 20,  Features Intersected: MIFLIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $1,911,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $2,102,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16346,  Location: 0.5 MI. W. OF CO. RD. 95 (Lat: 30.472903,  Lng: -87.555050),  Route carried "on" structure: County highway 32,  Year Built: 1996,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 467 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 631 (year 2038),  Design Load: HS 20,  Features Intersected: THREE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Underwater Inspection Date: December 2018,  Bridge Improvement Cost: $896,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $986,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16348,  Location: 1.4 MI. S. OF U. S. 98 (Lat: 30.392583,  Lng: -87.598297),  Route carried "on" structure: County highway 83,  Year Built: 1997,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 1,419 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,869 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $706,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17033,  Location: 1.2 MI. W. OF CO. RD. 95 (Lat: 30.363028,  Lng: -87.567778),  Route carried "on" structure: County highway 20,  Year Built: 1997,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 1,290 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,742 (year 2039),  Design Load: HS 20,  Features Intersected: HAMMOCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,543,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17121,  Location: 2.6 MI. N. OF U. S. 98 (Lat: 30.451658,  Lng: -87.547764),  Route carried "on" structure: County highway 95,  Year Built: 1999,  Status: Open,  Structure Length: 2.43m (7.97ft),  Average Daily Traffic: 552 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 746 (year 2039),  Design Load: HS 20,  Features Intersected: THREE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.3m (79.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $723,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $795,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18509,  Location: 1.5 MI. S. OF U.S. 98 (Lat: 30.394942,  Lng: -87.510022),  Route carried "on" structure: County highway 97,  Year Built: 2003,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,070 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,445 (year 2041),  Design Load: HS 20,  Features Intersected: SOLDIERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $896,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $986,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20703,  Location: 1.4 M. S. OF US 98 (Lat: 30.392100,  Lng: -87.598294),  Route carried "on" structure: City street ,  Year Built: 2012,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 1,419 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,869 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH,  Facility Carried by Structure: CO. RD. 83
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $524,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $576,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2107,  Location: .08 MI E. of CO RD 87 (Lat: 30.443694,  Lng: -87.568047),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.41m (4.63ft),  Average Daily Traffic: 70 (year 2017),  Average Future Daily Traffic: 95 (year 2037),  Features Intersected: Three Mile Creek,  Facility Carried by Structure: Woerner Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.0m (6.6ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $782,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $860,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2113,  Location: _1.28m S of CR 32 (Lat: 30.454256,  Lng: -87.581403),  Route carried "on" structure: County highway 87,  Year Built: 2016,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,160 (year 2016),  Average Future Daily Traffic: 4,266 (year 2036),  Design Load: HS 20,  Features Intersected: Trib. to Three Mile CR.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $327,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $360,000 ( Estimate for 2022)
Discuss Elberta, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.