  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 184ft / 56.3mTotal length
  • $14,816,000Total costs
  • 15,847Total average daily traffic
  • 1,305Total average daily truck traffic
  • 21,549Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Elkmont
  • No street view available for this location

New bridges in Elkmont, AL - historical statistics
  • New bridges - historical statistics
  • 61940-1949
  • 31950-1959
  • 21970-1979
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Elkmont, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 28.6%Satisfactory
  • 28.6%Fair
  • 14.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Good
  • 57.1%Satisfactory
  • 28.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Good
  • 71.4%Satisfactory
  • 14.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 28.6%Very good
  • 57.1%Good
  • 14.3%Satisfactory
Find on map >>   Show street view

Structure Number: 2411,  Location: SEC5 T1S R4W (Lat: 34.985700,  Lng: -86.968733),  Route carried "on" structure: County highway 73,  Year Built: 1940,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 100 (year 2014),  Average Future Daily Traffic: 150 (year 2034),  Features Intersected: CAVE BR,  Facility Carried by Structure: SPENCE CAVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $232,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $255,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2451,  Location: 6.6 M S AL & TN ST LINE (Lat: 34.910000,  Lng: -86.988333),  Route carried "on" structure: State highway 127,  Year Built: 1940,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 2,970 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,442 (year 2033),  Design Load: H 15,  Features Intersected: SULPHUR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.240,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $442,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $486,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2606,  Location: SEC22 T1S R4W (Lat: 34.936358,  Lng: -86.936528),  Route carried "on" structure: County highway 120,  Year Built: 1941,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 675 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,003 (year 2034),  Design Load: H 15,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: UPPER FT. HAMPTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 45.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $296,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $326,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2845,  Location: SEC23 T1S R5W (Lat: 34.941256,  Lng: -87.028464),  Route carried "on" structure: County highway 53,  Year Built: 1945,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 60 (year 2014),  Average Future Daily Traffic: 200 (year 2034),  Features Intersected: TURKEY CR,  Facility Carried by Structure: TURKEY CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.5m (14.8ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Serious,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: April 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $169,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3495,  Location: 2 MI S AL & TN ST LINE (Lat: 34.966953,  Lng: -87.017353),  Route carried "on" structure: State highway 127,  Year Built: 1949,  Status: Open,  Structure Length: 32.90m (107.94ft),  Average Daily Traffic: 1,850 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,144 (year 2033),  Design Load: H 20,  Features Intersected: ELK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.584,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 21,  Length of Maximum Span: 42.7m (140.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 32.90m (107.94ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $6,993,000,  Roadway Improvement Cost: $699,000,  Total Project Cost: $7,692,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3496,  Location: 1.7 M S AL & TN ST LINE (Lat: 34.971667,  Lng: -87.021667),  Route carried "on" structure: State highway 127,  Year Built: 1949,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 1,850 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,144 (year 2033),  Design Load: H 20,  Features Intersected: ELK RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.131,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.29m (33.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,187,000,  Roadway Improvement Cost: $219,000,  Total Project Cost: $2,406,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4642,  Location: SEC35 T1S R5W (Lat: 34.908289,  Lng: -87.030358),  Route carried "on" structure: County highway 65,  Year Built: 1953,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 920 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,370 (year 2034),  Design Load: H 15,  Features Intersected: SULPHUR CR,  Facility Carried by Structure: EASTER FERRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $631,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $694,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 4889,  Location: SEC18 T1S R4W (Lat: 34.969514,  Lng: -86.964258),  Route carried "on" structure: County highway 49,  Year Built: 1954,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 120 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 220 (year 2031),  Design Load: H 15,  Features Intersected: ROBINSON CR,  Facility Carried by Structure: ROBINSON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 3 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $191,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 489,  Location: SEC17 T1S R4W (Lat: 34.953319,  Lng: -86.974483),  Route carried "on" structure: County highway 49,  Year Built: 1954,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 490 (year 2014),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2034),  Design Load: H 15,  Features Intersected: MILL CR,  Facility Carried by Structure: VETO RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $248,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11689,  Location: SEC27 T1S R4W (Lat: 34.920494,  Lng: -86.935864),  Route carried "on" structure: County highway 100,  Year Built: 1976,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 2,900 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,300 (year 2030),  Design Load: H 20,  Features Intersected: MUDDY CR,  Facility Carried by Structure: SANDLIN RD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $388,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15616,  Location: SEC1 T2S R5W (Lat: 34.893572,  Lng: -87.009386),  Route carried "on" structure: County highway 35,  Year Built: 1991,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 250 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 400 (year 2034),  Features Intersected: WITTY BR,  Facility Carried by Structure: WITTY MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $458,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $504,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18076,  Location: EAST OF HAYS MILL ROAD (Lat: 34.920356,  Lng: -86.931400),  Route carried "on" structure: County highway 100,  Year Built: 1976,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,200 (year 2010),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,750 (year 2030),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: SANDLIN ROAD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $523,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18717,  Location: SEC34 T1S R4W (Lat: 34.905975,  Lng: -86.940572),  Route carried "on" structure: County highway 98,  Year Built: 2003,  Status: Open,  Structure Length: 1.75m (5.74ft),  Average Daily Traffic: 442 (year 2002),  Truck Traffic: 3%,  Average Future Daily Traffic: 660 (year 2028),  Design Load: HS 20,  Features Intersected: MUDDY CREEK,  Facility Carried by Structure: NEW GARDEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $596,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $656,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21471,  Location: Sec.17, T2S, R4W (Lat: 34.973883,  Lng: -86.994192),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 20 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 31 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH INTO MILL CREEK,  Facility Carried by Structure: REDUS HOLLOW RD.
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 5.8m (19.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $278,000 ( Estimate for 2022)