Bridge Statistics for Ellicottville, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 62ft / 19.3mTotal length
  • $17,871,000Total costs
  • 29,906Total average daily traffic
  • 4,340Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ellicottville
  • No street view available for this location

New bridges in Ellicottville, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11930-1939
  • 51950-1959
  • 21970-1979
  • 21980-1989
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Ellicottville, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.2%Very good
  • 45.5%Good
  • 9.1%Satisfactory
  • 27.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 9.1%Very good
  • 45.5%Good
  • 9.1%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 9.1%Excellent
  • 18.2%Very good
  • 45.5%Good
  • 18.2%Satisfactory
  • 9.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 21.4%Good
  • 50.0%Satisfactory
  • 14.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 33.3%Good
  • 33.3%Poor
Find on map >>   Show street view

Structure Number: 104153,  Location: 3.9 MI N JCT US219 & SH98 (Lat: 42.263892,  Lng: -78.663253),  Route carried "on" structure: US 219,  Year Built: 1950,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 5,149 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,197 (year 2040),  Design Load: H 20,  Features Intersected: BR GREAT VLLY CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.699,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $461,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $731,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 104154,  Location: 4.4 MI N JCT RTS 219 + 98 (Lat: 42.269825,  Lng: -78.668733),  Route carried "on" structure: US 219,  Year Built: 1950,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,149 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,197 (year 2040),  Design Load: H 20,  Features Intersected: PLUM CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.503,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $627,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104155,  Location: 5.7 M N JCT RTS 219 + 98 (Lat: 42.284003,  Lng: -78.660917),  Route carried "on" structure: US 219,  Year Built: 1936,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 6,880 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,945 (year 2040),  Features Intersected: CROWLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.595,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 70.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 18.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $635,000,  Roadway Improvement Cost: $372,000,  Total Project Cost: $1,008,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 104156,  Location: 1.3 MI NE ELLICOTTVILLE (Lat: 42.288247,  Lng: -78.661167),  Route carried "on" structure: US 219,  Year Built: 1953,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4,671 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,715 (year 2040),  Design Load: HS 20,  Features Intersected: CROWLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.190,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $403,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $639,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 104277,  Location: 1.7 MI SW JCT SH242&SH240 (Lat: 42.303917,  Lng: -78.629531),  Route carried "on" structure: State highway 242,  Year Built: 1957,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,827 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,845 (year 2040),  Design Load: HS 20,  Features Intersected: GREAT VALLEY CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.515,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,376,000,  Roadway Improvement Cost: $806,000,  Total Project Cost: $2,181,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 104278,  Location: 1.1 MI SW JCT RTS 242+240 (Lat: 42.311064,  Lng: -78.622419),  Route carried "on" structure: State highway 242,  Year Built: 1955,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,827 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,845 (year 2040),  Features Intersected: GREAT VALLEY CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.497,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,457,000,  Roadway Improvement Cost: $853,000,  Total Project Cost: $2,311,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 106103,  Location: 2.1 MI SW JCT RTS 242+240 (Lat: 42.300186,  Lng: -78.634453),  Route carried "on" structure: State highway 242,  Year Built: 1973,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,827 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,845 (year 2040),  Design Load: HS 20,  Features Intersected: IRISH HILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.920,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Channel: Poor,  Culverts: Very good,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $560,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 226799,  Location: 2.2 MI NE JCT US219&SH242 (Lat: 42.307094,  Lng: -78.625658),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 343 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 480 (year 2037),  Design Load: HS 20,  Features Intersected: BRYANT HILL CREEK,  Facility Carried by Structure: BRYANT HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $161,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $255,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332119,  Location: IN VILLAGE ELLICOTTVILLE (Lat: 42.275744,  Lng: -78.668489),  Route carried "on" structure: Other road ,  Year Built: 1988,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 1,208 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,691 (year 2037),  Features Intersected: GREAT VALLEY CRK,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 62.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $715,000,  Roadway Improvement Cost: $419,000,  Total Project Cost: $1,134,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332122,  Location: AT ELLICOTTVILLE (Lat: 42.274781,  Lng: -78.669622),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 438 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 613 (year 2037),  Design Load: HS 20,  Features Intersected: GREAT VALLEY CRK,  Facility Carried by Structure: MARTHA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,324,000,  Roadway Improvement Cost: $1,361,000,  Total Project Cost: $3,685,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 332123,  Location: 1.6 MI EAST OF ELLICOTTV (Lat: 42.290228,  Lng: -78.639378),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 30 (year 2017),  Average Future Daily Traffic: 42 (year 2037),  Design Load: HS 20,  Features Intersected: GREAT VALLEY CRK,  Facility Carried by Structure: QUACKENBUSH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $549,000,  Roadway Improvement Cost: $322,000,  Total Project Cost: $871,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332124,  Location: 2.2 MI E OF MAPLES (Lat: 42.327711,  Lng: -78.694242),  Route carried "on" structure: Other road ,  Year Built: 1970,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 201 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 281 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: LINDBERG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $537,000,  Roadway Improvement Cost: $314,000,  Total Project Cost: $851,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332125,  Location: 2.1 MI E OF MAPLES (Lat: 42.328456,  Lng: -78.696731),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 205 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 287 (year 2040),  Design Load: HS 20,  Features Intersected: MANSFIELD CREEK,  Facility Carried by Structure: HINMAN HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.972,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $179,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332128,  Location: AT ELLICOTTVILLE (Lat: 42.273306,  Lng: -78.669825),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 151 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 211 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: GREAT VALLEY CRK,  Facility Carried by Structure: MONROE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 82.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,790,000,  Roadway Improvement Cost: $1,048,000,  Total Project Cost: $2,839,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 721201,  Location: AT ELLICOTTVILLE,SUGTN RD (Lat: 42.273325,  Lng: -78.665594),  Route carried "under" structure: County highway ,  Year Built: 1903,  Structure Length: 0. m,  Features Intersected: CR71-SUGARTON RD,  Facility Carried by Structure: BUFFALO & PITBURG
Minimum Vertical Clearance: 3.55m (11.65ft),  Kilometerpoint: 0.451,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.0m (32.8ft)