Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Elmira, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 482ft / 147mTotal length
  • $97,925,000Total costs
  • 197,749Total average daily traffic
  • 9,809Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Elmira
  • No street view available for this location

New bridges in Elmira, NY - historical statistics
  • New bridges - historical statistics
  • 131930-1939
  • 51970-1979
  • 11980-1989
  • 71990-1999
  • 52000-2009
  • 22010-2019
Reconstructed bridges in Elmira, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in Elmira, NY
Average Bridge Truck Traffic in Elmira, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 75.0%Good
  • 18.8%Satisfactory
  • 6.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 31.3%Very good
  • 37.5%Good
  • 31.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 56.3%Good
  • 25.0%Satisfactory
  • 6.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Very good
  • 54.5%Good
  • 18.2%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 1010769,  Location: .3 MI W JCT SR 17 & SR352 (Lat: 42.095708,  Lng: -76.787925),  Route carried "on" structure: State highway 352,  Year Built: 2002,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 9,026 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,068 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NEWTOWN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.857,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.9m (52.2ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 15.9m (52.2ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.36m (17.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,291,000,  Roadway Improvement Cost: $1,342,000,  Total Project Cost: $3,633,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1010779,  Location: JCT SR 17 & SR 352 (Lat: 42.095978,  Lng: -76.786553),  Route carried "on" structure: State highway 352,  Year Built: 2002,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 9,026 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,068 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 86I 14 62013000, RTE I8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.970,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.15m (16.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,020,000,  Roadway Improvement Cost: $1,183,000,  Total Project Cost: $3,202,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101079,  Location: .4 mi NW JCT I86/Rte 352 (Lat: 42.100808,  Lng: -76.790958),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 1,128 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,395 (year 2040),  Design Load: HL 93,  Features Intersected: 86I 14 62013004, RTE 86,  Facility Carried by Structure: EAST AVENUE
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,601,000,  Roadway Improvement Cost: $937,000,  Total Project Cost: $2,538,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1012809,  Location: .5 MI SE JCT SR17& SR352 (Lat: 42.090472,  Lng: -76.782481),  Route carried "on" structure: City street 86,  Year Built: 2002,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 8,672 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,712 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 86I 17 62051130, RTE 86I
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.850,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,234,000,  Roadway Improvement Cost: $1,308,000,  Total Project Cost: $3,541,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1071189,  Location: ELMIRA PENNAVE-NASHAVE (Lat: 42.086103,  Lng: -76.803183),  Route carried "on" structure: State highway 14,  Year Built: 1979,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 24.32m (79.79ft),  Average Daily Traffic: 9,639 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 9,684 (year 2040),  Design Load: HS 20,  Features Intersected: CHEMUNG RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.697,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 19.8m (65.0ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.32m (79.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $11,723,000,  Roadway Improvement Cost: $6,865,000,  Total Project Cost: $18,587,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107749,  Location: ELMIRA N-S ART /S MAIN ST (Lat: 42.073431,  Lng: -76.800492),  Route carried "on" structure: ServiceState highway 14,  Year Built: 1999,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 9,678 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,723 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SOUTH MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.201,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.9m (94.8ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 23.5m (77.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,258,000,  Roadway Improvement Cost: $1,322,000,  Total Project Cost: $3,580,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221554,  Location: IN CITY OF ELMIRA (Lat: 42.087053,  Lng: -76.806831),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 22.71m (74.51ft),  Average Daily Traffic: 6,966 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,462 (year 2040),  Design Load: HS 20,  Features Intersected: CHEMUNG RIVER,  Facility Carried by Structure: MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 57.9m (190.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.70m (74.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $9,490,000,  Roadway Improvement Cost: $5,557,000,  Total Project Cost: $15,047,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 221556,  Location: IN CITY OF ELMIRA (Lat: 42.099253,  Lng: -76.794847),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 1,128 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,395 (year 2040),  Design Load: HS 20,  Features Intersected: NEWTOWN CREEK,  Facility Carried by Structure: EAST AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $924,000,  Roadway Improvement Cost: $541,000,  Total Project Cost: $1,465,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 221557,  Location: IN CITY OF ELMIRA (Lat: 42.104697,  Lng: -76.798250),  Route carried "on" structure: Business City street ,  Year Built: 1992,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 736 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 1,030 (year 2038),  Design Load: HS 20,  Features Intersected: NEWTOWN CREEK,  Facility Carried by Structure: LINDEN PLACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.2m (82.7ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $890,000,  Roadway Improvement Cost: $521,000,  Total Project Cost: $1,411,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221567,  Location: IN CITY OF ELMIRA (Lat: 42.099742,  Lng: -76.811406),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 6,214 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,548 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN,  Facility Carried by Structure: WASHINGTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.51m (18.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,817,000,  Roadway Improvement Cost: $1,064,000,  Total Project Cost: $2,881,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221575,  Location: IN THE CITY OF ELMIRA (Lat: 42.090367,  Lng: -76.784350),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 12.13m (39.80ft),  Average Daily Traffic: 8,672 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,712 (year 2040),  Design Load: HS 20,  Features Intersected: NEWTOWN CREEK, EX-D.L.&,  Facility Carried by Structure: WATER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.673,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.13m (39.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $4,831,000,  Roadway Improvement Cost: $2,829,000,  Total Project Cost: $7,660,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221581,  Location: IN CITY OF ELMIRA (Lat: 42.088139,  Lng: -76.797956),  Route carried "on" structure: City street ,  Year Built: 1938,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 16.92m (55.51ft),  Average Daily Traffic: 14,723 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,885 (year 2040),  Design Load: HS 20,  Features Intersected: CHEMUNG RIVER,  Facility Carried by Structure: MADISON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.91m (55.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $7,324,000,  Roadway Improvement Cost: $4,289,000,  Total Project Cost: $11,612,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 225451,  Location: IN CITY OF ELMIRA (Lat: 42.083872,  Lng: -76.815633),  Route carried "on" structure: City street ,  Year Built: 1974,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 29.84m (97.90ft),  Average Daily Traffic: 10,280 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,488 (year 2040),  Design Load: HS 20,  Features Intersected: CHEMUNG RIVER,  Facility Carried by Structure: WALNUT STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 29.83m (97.87ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $12,500,000,  Roadway Improvement Cost: $7,320,000,  Total Project Cost: $19,820,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 225452,  Location: IN CITY OF ELMIRA (Lat: 42.112531,  Lng: -76.801367),  Route carried "on" structure: City street ,  Year Built: 1974,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 283 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 396 (year 2038),  Design Load: HS 20,  Features Intersected: NEWTOWN CREEK,  Facility Carried by Structure: INDUSTRIAL PK.BLV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.6m (57.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,166,000,  Roadway Improvement Cost: $683,000,  Total Project Cost: $1,848,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 333177,  Location: 2.5 MI E OF ELMIRA (Lat: 42.096639,  Lng: -76.757036),  Route carried "on" structure: Other road ,  Year Built: 1933,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 316 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 442 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: GOLDSMITH CREEK,  Facility Carried by Structure: DRAHT HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $605,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333178,  Location: 2.7 MI E OF ELMIRA (Lat: 42.103644,  Lng: -76.755708),  Route carried "on" structure: Other road ,  Year Built: 1976,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 114 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 160 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: GOLDSMITH CREEK,  Facility Carried by Structure: MONKEY RUN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.574,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $312,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $495,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1010779,  Location: JCT SR 17 & SR 352 (Lat: 42.095978,  Lng: -76.786553),  Route carried "under" structure: Interstate 86,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 1969),  Features Intersected: 86I 14 62013000, RTE I8,  Facility Carried by Structure: RTE 352
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 4.216,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 101079,  Location: .4 mi NW JCT I86/Rte 352 (Lat: 42.100808,  Lng: -76.790958),  Route carried "under" structure: Interstate 86,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 27,500 (year 2018),  Truck Traffic: 14%,  Features Intersected: 86I 14 62013004, RTE 86,  Facility Carried by Structure: EAST AVENUE
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 19.710,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 1012809,  Location: .5 MI SE JCT SR17& SR352 (Lat: 42.090472,  Lng: -76.782481),  Route carried "under" structure: Interstate 86,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 21,600 (year 1998),  Features Intersected: 86I 17 62051130, RTE 86I
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 32.470,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 107749,  Location: ELMIRA N-S ART /S MAIN ST (Lat: 42.073431,  Lng: -76.800492),  Route carried "under" structure: ServiceCity street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 5,250 (year 2019),  Truck Traffic: 5%,  Features Intersected: SOUTH MAIN STREET,  Facility Carried by Structure: RTE 14
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.354,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.9m (94.8ft)

Find on map >>   Show street view

Structure Number: 721562,  Location: IN CITY OF ELMIRA (Lat: 42.075208,  Lng: -76.797986),  Route carried "under" structure: City street ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2021),  Features Intersected: EAST MILLER ST,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 7.3m (24.0ft)

Find on map >>   Show street view

Structure Number: 721563,  Location: IN CITY OF ELMIRA (Lat: 42.076733,  Lng: -76.798831),  Route carried "under" structure: City street ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 657 (year 2020),  Truck Traffic: 1%,  Features Intersected: SOUTH AVENUE,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 12.4m (40.7ft)

Find on map >>   Show street view

Structure Number: 721565,  Location: IN CITY OF ELMIRA (Lat: 42.083964,  Lng: -76.802869),  Route carried "under" structure: Other road ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 3,099 (year 2019),  Truck Traffic: 1%,  Features Intersected: HUDSON ST,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 3.89m (12.76ft),  Kilometerpoint: 0.000,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 7.3m (24.0ft)

Find on map >>   Show street view

Structure Number: 721568,  Location: IN CITY OF ELMIRA (Lat: 42.109800,  Lng: -76.816683),  Route carried "under" structure: State highway ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2021),  Features Intersected: WOODLAWN AVENUE,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.692,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 10.0m (32.8ft)

Find on map >>   Show street view

Structure Number: 72157,  Location: IN CITY OF ELMIRA (Lat: 42.091994,  Lng: -76.807297),  Route carried "under" structure: City street ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2021),  Features Intersected: WEST CHURCH STREET, WEST,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 3.96m (12.99ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 721571,  Location: IN CITY OF ELMIRA (Lat: 42.100972,  Lng: -76.807250),  Route carried "under" structure: City street ,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 5,262 (year 2017),  Truck Traffic: 4%,  Features Intersected: WASHINGTON AVENUE, WASHI,  Facility Carried by Structure: LACKAWANNA TRAIL
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.274,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 9.7m (31.8ft)

Find on map >>   Show street view

Structure Number: 721572,  Location: IN CITY OF ELMIRA (Lat: 42.099628,  Lng: -76.804442),  Route carried "under" structure: City street ,  Year Built: 1933,  Structure Length: 0. m,  Average Daily Traffic: 543 (year 2019),  Truck Traffic: 3%,  Features Intersected: LAKE STREET,  Facility Carried by Structure: LACKAWANNA TRAIL
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 1.126,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 9.7m (31.8ft)

Find on map >>   Show street view

Structure Number: 721573,  Location: IN CITY OF ELMIRA (Lat: 42.099328,  Lng: -76.803500),  Route carried "under" structure: County highway 960Q,  Year Built: 1933,  Structure Length: 0. m,  Average Daily Traffic: 3,945 (year 2019),  Truck Traffic: 3%,  Features Intersected: RTE 960Q,  Facility Carried by Structure: LACKAWANNA TRAIL
Minimum Vertical Clearance: 4.06m (13.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 10.3m (33.8ft)

Find on map >>   Show street view

Structure Number: 721574,  Location: IN CITY OF ELMIRA (Lat: 42.097808,  Lng: -76.796022),  Route carried "under" structure: City street ,  Year Built: 1932,  Structure Length: 0. m,  Average Daily Traffic: 3,062 (year 2020),  Truck Traffic: 7%,  Features Intersected: SULLIVAN STREET,  Facility Carried by Structure: Lackawanna Trail
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 10.6m (34.8ft)

Find on map >>   Show street view

Structure Number: 72158,  Location: IN CITY OF ELMIRA (Lat: 42.081769,  Lng: -76.801650),  Route carried "under" structure: City street ,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 5,160 (year 2019),  Truck Traffic: 5%,  Features Intersected: PENNSYLVANIA AVE,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 1.625,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 18.8m (61.7ft)

Find on map >>   Show street view

Structure Number: 77001,  Location: IN ELMIRA (Lat: 42.096422,  Lng: -76.809683),  Route carried "under" structure: City street ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 1,950 (year 2020),  Truck Traffic: 10%,  Features Intersected: SIDEWALK, FIFTH STREET,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 3.91m (12.83ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 10.3m (33.8ft)

Find on map >>   Show street view

Structure Number: 771523,  Location: IN THE CITY OF ELMIRA (Lat: 42.079083,  Lng: -76.800133),  Route carried "under" structure: State highway ,  Year Built: 1997,  Structure Length: 0. m,  Features Intersected: ELMIRA ARTERIAL (SB), RT,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 10.941,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 771523,  Location: IN THE CITY OF ELMIRA (Lat: 42.079083,  Lng: -76.800133),  Route carried "under" structure: State highway 14,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 1990),  Features Intersected: ELMIRA ARTERIAL (SB), RT,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 10.941,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 27.1m (88.9ft)

Discuss Elmira, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.