Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Emerald Mountain, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 138ft / 42.2mTotal length
  • $10,356,000Total costs
  • 17,637Total average daily traffic
  • 1,748Total average daily truck traffic
  • 30,269Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Emerald Mountain
  • No street view available for this location

New bridges in Emerald Mountain, AL - historical statistics
  • New bridges - historical statistics
  • 31960-1969
  • 41970-1979
  • 21980-1989
  • 11990-1999
Average Bridge Daily Traffic in Emerald Mountain, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 40.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 70.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 60.0%Good
  • 30.0%Satisfactory
  • 10.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Very good
  • 80.0%Good
  • 10.0%Satisfactory
Find on map >>   Show street view

Structure Number: 3561,  Location: SEC 23 T17N R19E (Lat: 32.444700,  Lng: -86.127603),  Route carried "on" structure: County highway ,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 20 (year 1998),  Average Future Daily Traffic: 25 (year 2031),  Design Load: H 15,  Features Intersected: BRENSON BRANCH,  Facility Carried by Structure: Brenson Creek Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $402,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $442,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 6922,  Location: SEC 11 T20N R17E (Lat: 32.466000,  Lng: -86.023200),  Route carried "on" structure: County highway 4,  Year Built: 1960,  Status: Posted for load,  Structure Length: 2.31m (7.58ft),  Average Daily Traffic: 1,103 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,000 (year 2032),  Design Load: H 15,  Features Intersected: GOODWATER CREEK,  Facility Carried by Structure: Rifle Range Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $539,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $593,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 933,  Location: 3.1 MI NW OF US 80 (Lat: 32.403097,  Lng: -86.114606),  Route carried "on" structure: County highway 12,  Year Built: 1967,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 1,200 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,500 (year 2040),  Design Load: HS 20,  Features Intersected: JENKINS CREEK,  Facility Carried by Structure: WARES FERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 46.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.98m (26.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,478,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $1,626,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 10273,  Location: SEC 17 T17N R20E (Lat: 32.448492,  Lng: -86.079417),  Route carried "on" structure: County highway 4,  Year Built: 1970,  Status: Posted for load,  Structure Length: 6.58m (21.59ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 350 (year 2031),  Design Load: H 15,  Features Intersected: CHUBBAHATCHEE CREEK,  Facility Carried by Structure: Rifle Range Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,306,000,  Roadway Improvement Cost: $131,000,  Total Project Cost: $1,437,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10274,  Location: SEC 17 T17N R20E (Lat: 32.449308,  Lng: -86.078617),  Route carried "on" structure: County highway 4,  Year Built: 1970,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 350 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 400 (year 2031),  Design Load: H 15,  Features Intersected: CHUBBAHATCHEE CREEK,  Facility Carried by Structure: Rifle Range Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.37m (14.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $749,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $824,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11186,  Location: SEC 23 717N R19E (Lat: 32.438489,  Lng: -86.122114),  Route carried "on" structure: County highway 4,  Year Built: 1974,  Status: Open,  Structure Length: 4.06m (13.32ft),  Average Daily Traffic: 4,160 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,500 (year 2031),  Design Load: H 15,  Features Intersected: BRENSEN BRANCH,  Facility Carried by Structure: Rifle Range Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $929,000,  Roadway Improvement Cost: $93,000,  Total Project Cost: $1,022,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11945,  Location: SEC 24 T17N R19E (Lat: 32.439911,  Lng: -86.119397),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 3,710 (year 2008),  Truck Traffic: 12%,  Average Future Daily Traffic: 5,000 (year 2032),  Design Load: H 15,  Features Intersected: BRENSON BRANCH,  Facility Carried by Structure: Peace Church Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $468,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $515,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 12537,  Location: SEC.24,T17N,R19E (Lat: 32.438000,  Lng: -86.114544),  Route carried "on" structure: County highway 4,  Year Built: 1981,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 4,160 (year 2004),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,000 (year 2031),  Design Load: H 15,  Features Intersected: BRENSEN CREEK SPUR,  Facility Carried by Structure: Rifle Range Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $452,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $497,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1321,  Location: 2.6 MILE NORTH U S 80 (Lat: 32.399644,  Lng: -86.036292),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 280 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2040),  Design Load: H 10,  Features Intersected: CREEK,  Facility Carried by Structure: ALEXANDER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $554,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $609,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16767,  Location: EMERALD MT TOLL ROAD (Lat: 32.433000,  Lng: -86.124900),  Route carried "on" structure: Alternate Other road 74,  Year Built: 1994,  Status: Open,  Structure Length: 11.46m (37.60ft),  Average Daily Traffic: 2,354 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 2,994 (year 2040),  Design Load: HS 20,  Features Intersected: TALLAPOOSA RIVER,  Facility Carried by Structure: EMERALD MT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Toll: Toll bridge,  Owner: Private,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.33m (40.45ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $2,537,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $2,791,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Discuss Emerald Mountain, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.