Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Enola, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 738ft / 225mTotal length
  • $34,934,000Total costs
  • 580,115Total average daily traffic
  • 119,173Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Enola
  • No street view available for this location

New bridges in Enola, PA - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 271970-1979
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Enola, PA
Average Bridge Truck Traffic in Enola, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Very good
  • 45.5%Good
  • 27.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 54.5%Good
  • 27.3%Satisfactory
  • 18.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 36.4%Good
  • 63.6%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Good
  • 25.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 13594,  Location: .5 MI.N. L.R. 21051 (Lat: 40.316306,  Lng: -76.920592),  Route carried "on" structure: US 11,  Year Built: 1972,  Status: Open,  Structure Length: 9.20m (30.18ft),  Average Daily Traffic: 8,493 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,826 (year 2032),  Design Load: HS 20,  Features Intersected: I 81; SR 0081,COLL/DIST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.242,  Lanes on structure: 2,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.20m (33.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $408,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13597,  Location: SUMMERDALE (Lat: 40.316444,  Lng: -76.920961),  Route carried "on" structure: US 11,  Year Built: 1972,  Status: Open,  Structure Length: 9.78m (32.09ft),  Average Daily Traffic: 8,493 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,826 (year 2032),  Design Load: HS 20,  Features Intersected: I-81; SR 0081, COLL/DIST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.229,  Lanes on structure: 10,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.80m (35.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $236,000,  Roadway Improvement Cost: $695,000,  Total Project Cost: $3,187,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13709,  Location: 0.8 MI.W. OF LR 569 (Lat: 40.280850,  Lng: -76.982778),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 37,106 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 48,785 (year 2032),  Design Load: HS 20,  Features Intersected: SEARS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.056,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 1371,  Location: 0.8 MI.W. L.R. 569 (Lat: 40.280908,  Lng: -76.984072),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 38,853 (year 2021),  Truck Traffic: 19%,  Average Future Daily Traffic: 47,705 (year 2032),  Design Load: HS 20,  Features Intersected: SEARS RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.883,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 13713,  Location: 2 MI. S. US 11 & 15 (Lat: 40.305269,  Lng: -76.956139),  Route carried "on" structure: State highway ,  Year Built: 1973,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 932 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,198 (year 2032),  Design Load: HS 20,  Features Intersected: I-81 NB; SR 0081,  Facility Carried by Structure: T-664; TOWER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.40m (27.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13714,  Location: 1.7 MI.S. SR 0011 (Lat: 40.306381,  Lng: -76.956558),  Route carried "on" structure: State highway ,  Year Built: 1973,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 932 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,198 (year 2032),  Design Load: HS 20,  Features Intersected: I-81 SB; SR 0081,  Facility Carried by Structure: T-664; TOWER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.074,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $23,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $311,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 13853,  Location: S OF MT ZION HAMDEN TWP (Lat: 40.276556,  Lng: -76.986831),  Route carried "on" structure: State highway ,  Year Built: 1973,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 4,457 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,525 (year 2032),  Design Load: HS 20,  Features Intersected: I-81 NB; SR 0081,  Facility Carried by Structure: 1013 Good Hope Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.644,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 28.7m (94.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13854,  Location: .5 MI. S. OF L.R. 569 (Lat: 40.277692,  Lng: -76.987050),  Route carried "on" structure: State highway ,  Year Built: 1973,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 4,457 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,525 (year 2032),  Design Load: HS 20,  Features Intersected: I-81 SB; SR 0081,  Facility Carried by Structure: 1013 Good Hope Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.644,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 35.7m (117.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.60m (24.93ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $53,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $711,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13855,  Location: .2 MI.N. I-81 (Lat: 40.280528,  Lng: -76.986911),  Route carried "on" structure: State highway ,  Year Built: 1973,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,457 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 5,525 (year 2032),  Design Load: HS 20,  Features Intersected: SEARS RUN,  Facility Carried by Structure: SR 1013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.326,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 14037,  Location: 1.6 W W.FRVW/CONODGUINET (Lat: 40.277183,  Lng: -76.949756),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 678 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 904 (year 2041),  Design Load: H 20,  Features Intersected: CONODOGUINET CREEK,  Facility Carried by Structure: BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.90m (35.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14039,  Location: .2W WEST FAIRVW/TR.CONODG (Lat: 40.276339,  Lng: -76.931208),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 2,219 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,500 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: POSSUM HOLLOW CREEK,  Facility Carried by Structure: CREEKSIDE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $249,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 14214,  Location: HARRISBURG (WADE BR) (Lat: 40.316167,  Lng: -76.917853),  Route carried "on" structure: Interstate 81,  Year Built: 1973,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 158.13m (518.80ft),  Average Daily Traffic: 66,415 (year 2022),  Truck Traffic: 25%,  Average Future Daily Traffic: 83,950 (year 2040),  Design Load: HS 20,  Features Intersected: SR 3009;SUSQ RIV; NSRCRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 64.0m (210.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 34,  Number Of Approach Spans: 10,  Length of Maximum Span: 41.5m (136.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 31.1m (102.0ft),  Out-to-Out Width: 35.4m (116.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 160.50m (526.57ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Underwater Inspection Date: July 2019,  Bridge Improvement Cost: $250,000,  Total Project Cost: $30,068,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 4221,  Location: .2W FRVW/TR.CONDGNT CREEK (Lat: 40.278947,  Lng: -76.933175),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 420 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: TRIB.CONODOGUINET CREEK,  Facility Carried by Structure: MAGARO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 45015,  Location: I-81 SB Ramp to US11 NB (Lat: 40.316597,  Lng: -76.917250),  Route carried "on" structure: Ramp State highway ,  Year Built: 1972,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 2,413 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,023 (year 2032),  Design Load: HS 20,  Features Intersected: Norfolk Southern RR Prop,  Facility Carried by Structure: Ramp C
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 45016,  Location: US 11NB to I-81 NB Ramp B (Lat: 40.315806,  Lng: -76.918056),  Route carried "on" structure: Ramp State highway ,  Year Built: 1972,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 6,428 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,881 (year 2032),  Design Load: HS 20,  Features Intersected: Norfolk Southern RR Prop,  Facility Carried by Structure: Ramp B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13594,  Location: .5 MI.N. L.R. 21051 (Lat: 40.316306,  Lng: -76.920592),  Route carried "under" structure: Interstate 81,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 34,771 (year 2022),  Truck Traffic: 25%,  Features Intersected: I 81; SR 0081,COLL/DIST,  Facility Carried by Structure: US 11 NB; SR 0011
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 62.301,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 13594,  Location: .5 MI.N. L.R. 21051 (Lat: 40.316306,  Lng: -76.920592),  Route carried "under" structure: Interstate 81,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 31,644 (year 2022),  Truck Traffic: 24%,  Features Intersected: I 81; SR 0081,COLL/DIST,  Facility Carried by Structure: US 11 NB; SR 0011
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 62.209,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 13594,  Location: .5 MI.N. L.R. 21051 (Lat: 40.316306,  Lng: -76.920592),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 5,201 (year 2022),  Truck Traffic: 7%,  Features Intersected: I 81; SR 0081,COLL/DIST,  Facility Carried by Structure: US 11 NB; SR 0011
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 13594,  Location: .5 MI.N. L.R. 21051 (Lat: 40.316306,  Lng: -76.920592),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,433 (year 2022),  Truck Traffic: 7%,  Features Intersected: I 81; SR 0081,COLL/DIST,  Facility Carried by Structure: US 11 NB; SR 0011
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 13597,  Location: SUMMERDALE (Lat: 40.316444,  Lng: -76.920961),  Route carried "under" structure: Interstate 81,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 31,644 (year 2022),  Truck Traffic: 24%,  Features Intersected: I-81; SR 0081, COLL/DIST,  Facility Carried by Structure: US 11 SB; SR 0011
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 62.209,  Lanes on structure: 10,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 13597,  Location: SUMMERDALE (Lat: 40.316444,  Lng: -76.920961),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 5,201 (year 2022),  Truck Traffic: 7%,  Features Intersected: I-81; SR 0081, COLL/DIST,  Facility Carried by Structure: US 11 SB; SR 0011
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 13597,  Location: SUMMERDALE (Lat: 40.316444,  Lng: -76.920961),  Route carried "under" structure: Interstate 81,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 34,771 (year 2022),  Truck Traffic: 25%,  Features Intersected: I-81; SR 0081, COLL/DIST,  Facility Carried by Structure: US 11 SB; SR 0011
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 62.301,  Lanes on structure: 10,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 13597,  Location: SUMMERDALE (Lat: 40.316444,  Lng: -76.920961),  Route carried "under" structure: Ramp State highway ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,433 (year 2022),  Truck Traffic: 7%,  Features Intersected: I-81; SR 0081, COLL/DIST,  Facility Carried by Structure: US 11 SB; SR 0011
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 13713,  Location: 2 MI. S. US 11 & 15 (Lat: 40.305269,  Lng: -76.956139),  Route carried "under" structure: Interstate 81,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 39,904 (year 2021),  Truck Traffic: 23%,  Features Intersected: I-81 NB; SR 0081,  Facility Carried by Structure: T-664; TOWER RD
Minimum Vertical Clearance: 8.00m (26.25ft),  Kilometerpoint: 59.092,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 13714,  Location: 1.7 MI.S. SR 0011 (Lat: 40.306381,  Lng: -76.956558),  Route carried "under" structure: Interstate 81,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 40,381 (year 2021),  Truck Traffic: 23%,  Features Intersected: I-81 SB; SR 0081,  Facility Carried by Structure: T-664; TOWER RD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 58.992,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 1381,  Location: MT.ZION (Lat: 40.289103,  Lng: -76.982333),  Route carried "under" structure: Interstate 81,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 39,904 (year 2021),  Truck Traffic: 23%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: 944 Wertzville Rd
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 55.867,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 1381,  Location: MT.ZION (Lat: 40.289103,  Lng: -76.982333),  Route carried "under" structure: Interstate 81,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 40,381 (year 2021),  Truck Traffic: 23%,  Features Intersected: I-81; SR 0081,  Facility Carried by Structure: 944 Wertzville Rd
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 55.712,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 13853,  Location: S OF MT ZION HAMDEN TWP (Lat: 40.276556,  Lng: -76.986831),  Route carried "under" structure: Interstate 81,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 37,106 (year 2021),  Truck Traffic: 20%,  Features Intersected: I-81 NB; SR 0081,  Facility Carried by Structure: 1013 Good Hope Rd
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 54.264,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.7m (94.2ft)

Find on map >>   Show street view

Structure Number: 13854,  Location: .5 MI. S. OF L.R. 569 (Lat: 40.277692,  Lng: -76.987050),  Route carried "under" structure: Interstate 81,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 38,853 (year 2021),  Truck Traffic: 19%,  Features Intersected: I-81 SB; SR 0081,  Facility Carried by Structure: 1013 Good Hope Rd
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 54.883,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 14214,  Location: HARRISBURG (WADE BR) (Lat: 40.316167,  Lng: -76.917853),  Route carried "under" structure: State highway ,  Year Built: 1973,  Structure Length: 0. m,  Average Daily Traffic: 6,855 (year 2020),  Truck Traffic: 6%,  Features Intersected: SR 3009;SUSQ RIV; NSRCRR,  Facility Carried by Structure: I-81; SR 0081
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 7.791,  Lanes on structure: 6,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 41.5m (136.2ft)

Discuss Enola, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.