Bridge Statistics for Enterprise, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 184ft / 55.9mTotal length
  • $33,845,000Total costs
  • 111,391Total average daily traffic
  • 6,247Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Enterprise
  • No street view available for this location

New bridges in Enterprise, AL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 41920-1929
  • 21940-1949
  • 21950-1959
  • 61960-1969
  • 41970-1979
  • 31980-1989
  • 31990-1999
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Enterprise, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 21960-1969
  • 11970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Enterprise, AL
Average Bridge Truck Traffic in Enterprise, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 55.6%Good
  • 33.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 33.3%Very good
  • 22.2%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 11.1%Very good
  • 44.4%Good
  • 33.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.8%Very good
  • 48.1%Good
  • 33.3%Satisfactory
  • 3.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Good
  • 38.9%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 3344,  Location: 6.9 MI. E. SR 87 (Lat: 31.315950,  Lng: -85.918183),  Route carried "on" structure: State highway 134,  Year Built: 1948,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 7,150 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 10,296 (year 2033),  Design Load: H 15,  Features Intersected: DOUBLE BRIDGES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $841,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $925,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3345,  Location: 0.699 MI INSIDE CR. (Lat: 31.322117,  Lng: -85.878517),  Route carried "on" structure: State highway 134,  Year Built: 1948,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,380 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,867 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.348,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $726,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $799,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3827,  Location: 2 MILES SOUTH OF KEYTON (Lat: 31.257344,  Lng: -85.835658),  Route carried "on" structure: County highway 712,  Year Built: 1950,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 577 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 685 (year 2040),  Design Load: H 15,  Features Intersected: WILSONS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $297,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 5183,  Location: 2 MILE S.W.OF ENTERPRISE (Lat: 31.307150,  Lng: -85.884033),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 1,155 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,610 (year 2039),  Design Load: H 15,  Features Intersected: BLANKET CREEK,  Facility Carried by Structure: CO. RT. 606
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $253,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 643,  Location: 1.25 MILES NW ROCK CITY (Lat: 33.991194,  Lng: -87.726028),  Route carried "on" structure: County highway 40,  Year Built: 1900,  Year Reconstructed: 1959,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 500 (year 2001),  Truck Traffic: 35%,  Average Future Daily Traffic: 981 (year 2035),  Design Load: HS 15,  Features Intersected: Little New River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 39.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.69m (8.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $435,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $479,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8811,  Location: 1 MI E OF NEW HOME CH (Lat: 31.294928,  Lng: -85.934364),  Route carried "on" structure: County highway 620,  Year Built: 1965,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 176 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2040),  Design Load: H 15,  Features Intersected: NEW HOME BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $330,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $363,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9143,  Location: 5.7MILE S OF ENTERPRISE (Lat: 31.231444,  Lng: -85.842847),  Route carried "on" structure: County highway 723,  Year Built: 1966,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 294 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 350 (year 2040),  Design Load: H 10,  Features Intersected: WILKERSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.73m (8.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $658,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9418,  Location: 4.27 MILE N.E.OF ENTERPRI (Lat: 31.345250,  Lng: -85.814614),  Route carried "on" structure: County highway 702,  Year Built: 1967,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 929 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,245 (year 2040),  Design Load: H 15,  Features Intersected: HARRAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $764,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $840,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9488,  Location: 2 MI. NORTH U.S. 84 (Lat: 31.354425,  Lng: -85.833231),  Route carried "on" structure: State highway 27,  Year Built: 1928,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,240 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,605 (year 2033),  Design Load: H 15,  Features Intersected: STRIPLING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.872,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $757,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9489,  Location: 2 MI. NORTH U.S. 84 (Lat: 31.354381,  Lng: -85.833053),  Route carried "on" structure: State highway 27,  Year Built: 1929,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,240 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,605 (year 2033),  Design Load: H 15,  Features Intersected: STRIPLING CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.848,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $588,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $647,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9937,  Location: 4.08 MI S OF KEYTON (Lat: 31.237508,  Lng: -85.822003),  Route carried "on" structure: County highway 719,  Year Built: 1969,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 55 (year 2020),  Average Future Daily Traffic: 95 (year 2040),  Design Load: H 10,  Features Intersected: WILSON MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10314,  Location: 2 MILES NW OF BATTENS XRD (Lat: 31.283203,  Lng: -85.915964),  Route carried "on" structure: County highway 610,  Year Built: 1968,  Status: Posted for load,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 375 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 495 (year 2040),  Design Load: H 15,  Features Intersected: DOUBLE BRIDGES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,295,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,425,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11146,  Location: 3.95 MI S OF KEYTON (Lat: 31.228036,  Lng: -85.842117),  Route carried "on" structure: County highway 728,  Year Built: 1974,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 95 (year 2020),  Average Future Daily Traffic: 135 (year 2040),  Design Load: H 10,  Features Intersected: SARDIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $476,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11147,  Location: 2.9 MI SE OF CLINTONVILLE (Lat: 31.388025,  Lng: -85.849983),  Route carried "on" structure: County highway 157,  Year Built: 1974,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 165 (year 2040),  Design Load: H 10,  Features Intersected: MATTHEWS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $665,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $732,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11265,  Location: 3.8 MILES WEST OF ENPRISE (Lat: 31.326128,  Lng: -85.915656),  Route carried "on" structure: County highway 537,  Year Built: 1974,  Status: Open,  Structure Length: 4.05m (13.29ft),  Average Daily Traffic: 55 (year 2020),  Average Future Daily Traffic: 90 (year 2040),  Design Load: H 15,  Features Intersected: DOUBLE BRIDGES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.01m (16.44ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: May 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $894,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $983,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11593,  Location: ENTERPRISE (Lat: 31.307200,  Lng: -85.858750),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,630 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,060 (year 2039),  Design Load: H 15,  Features Intersected: STREAM,  Facility Carried by Structure: DOSTER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.539,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $518,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $570,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12892,  Location: 0.1 MI.E. SR 27 (Lat: 31.302697,  Lng: -85.808886),  Route carried "on" structure: US 84,  Year Built: 1960,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 27,350 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 36,692 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 290.499,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,200,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,320,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14283,  Location: 0.3 MI. W.SR-167SOUTH (Lat: 31.293717,  Lng: -85.836783),  Route carried "on" structure: State highway 192,  Year Built: 1987,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 6,330 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,878 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.470,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,506,000,  Roadway Improvement Cost: $251,000,  Total Project Cost: $2,757,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14284,  Location: 0.5 MI. W. US-84 (Lat: 31.331233,  Lng: -85.874000),  Route carried "on" structure: State highway 192,  Year Built: 1987,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 6,020 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,492 (year 2033),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.917,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $4,991,000,  Roadway Improvement Cost: $499,000,  Total Project Cost: $5,490,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14877,  Location: 0.5 MI.N.COFFEE 156 (Lat: 31.385203,  Lng: -85.809769),  Route carried "on" structure: State highway 27,  Year Built: 1989,  Status: Open,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 2,620 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 3,803 (year 2033),  Design Load: HS 20,  Features Intersected: BOWLES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.098,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.93m (35.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,147,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $3,462,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15131,  Location: ENTERPRISE (Lat: 31.331400,  Lng: -85.829633),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 1,210 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,720 (year 2039),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: DIXIE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.620,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.9m (29.2ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15806,  Location: 1.5 MI.E.SR 167 (Lat: 31.301617,  Lng: -85.805217),  Route carried "on" structure: US 84,  Year Built: 1995,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 17,100 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 22,941 (year 2033),  Design Load: HS 20,  Features Intersected: COWPEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 295.492,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.4m (14.4ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,556,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $2,812,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15925,  Location: 1.18 MI.W.OF SR.27 (Lat: 31.298314,  Lng: -85.884019),  Route carried "on" structure: State highway 192,  Year Built: 1994,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 3,840 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,779 (year 2033),  Design Load: HS 20,  Features Intersected: BLANKET CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.052,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,787,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $1,966,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18963,  Location: ENTERPRISE .26 FROM AL192 (Lat: 31.310417,  Lng: -85.884250),  Route carried "on" structure: Business City street ,  Year Built: 2002,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 180 (year 2019),  Average Future Daily Traffic: 260 (year 2039),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: TARTAN WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.6m (31.5ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $896,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $986,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19494,  Location: 4.64 MI SE NEW BROCKTON (Lat: 31.345236,  Lng: -85.895878),  Route carried "on" structure: County highway 520,  Year Built: 2004,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 150 (year 2040),  Design Load: HS 20,  Features Intersected: LONGBRANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20494,  Location: 2 MI. E. OF SR 122 (Lat: 31.360361,  Lng: -85.887861),  Route carried "on" structure: US 84,  Year Built: 2012,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 4,870 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 7,980 (year 2031),  Design Load: HS 20,  Features Intersected: LONG BRANCH CREEK,  Facility Carried by Structure: SR-12 MP 576.593
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 283.920,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.57m (5.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $2,568,000,  Roadway Improvement Cost: $257,000,  Total Project Cost: $2,825,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20801,  Location: ENTERPRISE (Lat: 31.344533,  Lng: -85.852683),  Route carried "on" structure: City street ,  Year Built: 2013,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,160 (year 2019),  Average Future Daily Traffic: 1,620 (year 2039),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: NORTHSIDE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 72.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $476,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 643,  Location: JCT. SR 88 (Lat: 31.311244,  Lng: -85.851497),  Route carried "under" structure: State highway 27,  Year Built: 1929,  Structure Length: 0. m,  Average Daily Traffic: 9,440 (year 2013),  Truck Traffic: 6%,  Features Intersected: S. R. 27,  Facility Carried by Structure: WIREGRASS C RR
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 44.020,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 688,  Location: CITY OF ENTERPRISE (Lat: 31.320467,  Lng: -85.859917),  Route carried "under" structure: State highway 134,  Year Built: 1929,  Structure Length: 0. m,  Average Daily Traffic: 4,220 (year 2013),  Truck Traffic: 4%,  Features Intersected: S. R. 134,  Facility Carried by Structure: WIREGRASS C RR
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 41.310,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.9m (39.0ft)