Bridge Statistics for Epping, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 121ft / 37.1mTotal length
  • $40,846,000Total costs
  • 226,919Total average daily traffic
  • 16,359Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Epping
  • No street view available for this location

New bridges in Epping, NH - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11950-1959
  • 11970-1979
  • 101990-1999
  • 32000-2009
Average Bridge Daily Traffic in Epping, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 54.5%Very good
  • 27.3%Good
  • 18.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 27.3%Very good
  • 54.5%Good
  • 9.1%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 63.6%Very good
  • 9.1%Good
  • 9.1%Satisfactory
  • 18.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Excellent
  • 11.1%Very good
  • 44.4%Good
  • 11.1%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 78005100053,  Location: .65 MI. SE RAYMOND TL (Lat: 43.039281,  Lng: -71.130164),  Route carried "on" structure: Alternate State highway 27,  Year Built: 1935,  Status: Open,  Structure Length: 1.38m (4.53ft),  Average Daily Traffic: 4,369 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,466 (year 2042),  Design Load: H 15,  Features Intersected: LAMPREY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.209,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 78005900054,  Location: TOWN RD (Lat: 43.039756,  Lng: -71.121894),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 525 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 777 (year 2042),  Design Load: H 15,  Features Intersected: LAMPREY RIVER,  Facility Carried by Structure: BLAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.103,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 30.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 78006000038,  Location: Junction Beede Rd &NH101 (Lat: 43.026869,  Lng: -71.116917),  Route carried "on" structure: Other road ,  Year Built: 1998,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 455 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 673 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH101,  Facility Carried by Structure: BEEDE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.657,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 74.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.19m (20.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 78009700033,  Location: 1.1 MI WEST JCT NH101/125 (Lat: 43.027194,  Lng: -71.085944),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 455 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 673 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH101,  Facility Carried by Structure: MARTIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.711,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 68.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 78010900035,  Location: 1.1MI E NH101/NH125 JCT (Lat: 43.024500,  Lng: -71.062833),  Route carried "on" structure: State highway 101,  Year Built: 1997,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 19,614 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 29,028 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: PISCASSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.886,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 78010900037,  Location: .4 MI N BRENTWOOD TL (Lat: 43.026289,  Lng: -71.073811),  Route carried "on" structure: State highway 101,  Year Built: 1997,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 22,433 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 33,200 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH125
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 126.494,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 78010900038,  Location: .41 MI N BRENTWOOD TL (Lat: 43.026506,  Lng: -71.073761),  Route carried "on" structure: State highway 101,  Year Built: 1996,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 22,225 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 32,893 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH125
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.804,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 87.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 78010900055,  Location: 0.7 MI. RTE 125 (Lat: 43.039875,  Lng: -71.073233),  Route carried "on" structure: Other road ,  Year Built: 1936,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 3,660 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,416 (year 2042),  Design Load: H 10,  Features Intersected: LAMPREY RIVER,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.164,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 78011200055,  Location: TOWN RD (Lat: 43.038161,  Lng: -71.070856),  Route carried "on" structure: Other road ,  Year Built: 2004,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 1,090 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,613 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: LAMPREY RIVER,  Facility Carried by Structure: MILL STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.045,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 78011300051,  Location: 0.7 MI FROM JCT RTE 101 (Lat: 43.036819,  Lng: -71.068825),  Route carried "on" structure: State highway 125,  Year Built: 1991,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 16,380 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 24,242 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: LAMPREY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.710,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 78014600111,  Location: 0.1 MI. S. JCT. 155 (Lat: 43.079322,  Lng: -71.035422),  Route carried "on" structure: State highway 125,  Year Built: 1977,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 14,575 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,571 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: NORTH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.215,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 78015000069,  Location: 1.25 MI SE JCT NH 125 (Lat: 43.049519,  Lng: -71.032267),  Route carried "on" structure: State highway 87,  Year Built: 2004,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 2,569 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,802 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: LAMPREY RIVER OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.918,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 0.78m (2.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 78015100069,  Location: 1.2 MI. SE JCT NH 125 (Lat: 43.049492,  Lng: -71.032900),  Route carried "on" structure: State highway 87,  Year Built: 2004,  Status: Open,  Structure Length: 4.13m (13.55ft),  Average Daily Traffic: 2,569 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,802 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: LAMPREY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.867,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.5m (126.3ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.13m (13.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 78006000038,  Location: Junction Beede Rd &NH101 (Lat: 43.026869,  Lng: -71.116917),  Route carried "under" structure: State highway 101,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 44,000 (year 2015),  Truck Traffic: 8%,  Features Intersected: NH101,  Facility Carried by Structure: BEEDE ROAD
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 2.736,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 78009700033,  Location: 1.1 MI WEST JCT NH101/125 (Lat: 43.027194,  Lng: -71.085944),  Route carried "under" structure: State highway 101,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 24,000 (year 2015),  Truck Traffic: 7%,  Features Intersected: NH101,  Facility Carried by Structure: MARTIN ROAD
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 5.198,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 78010900037,  Location: .4 MI N BRENTWOOD TL (Lat: 43.026289,  Lng: -71.073811),  Route carried "under" structure: State highway 125,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 21,000 (year 2013),  Truck Traffic: 7%,  Features Intersected: NH125,  Facility Carried by Structure: NH101 EB
Minimum Vertical Clearance: 15.00m (49.21ft),  Kilometerpoint: 0.400,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 78010900038,  Location: .41 MI N BRENTWOOD TL (Lat: 43.026506,  Lng: -71.073761),  Route carried "under" structure: State highway 125,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 2009),  Truck Traffic: 7%,  Features Intersected: NH125,  Facility Carried by Structure: NH101 WB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 1.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)