Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Estill Springs, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 249ft / 76.3mTotal length
  • $12,178,000Total costs
  • 49,121Total average daily traffic
  • 3,735Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Estill Springs
  • No street view available for this location

New bridges in Estill Springs, TN - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 21950-1959
  • 41960-1969
  • 41970-1979
  • 11980-1989
  • 31990-1999
Average Bridge Daily Traffic in Estill Springs, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Very good
  • 50.0%Good
  • 25.0%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 50.0%Good
  • 37.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 50.0%Good
  • 37.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.8%Very good
  • 52.9%Good
  • 23.5%Satisfactory
  • 11.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Good
  • 22.2%Satisfactory
  • 11.1%Fair
Find on map >>   Show street view

Structure Number: 26021100001,  Location: WEST OF SR130 (Lat: 35.274333,  Lng: -86.205233),  Route carried "on" structure: County highway 2110,  Year Built: 1972,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 958 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,533 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 26026180001,  Location: EAST OF SR16 (Lat: 35.307233,  Lng: -86.122467),  Route carried "on" structure: County highway 1,  Year Built: 1979,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 890 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,424 (year 2041),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.721,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 260A0230001,  Location: EAST OF SR16 (Lat: 35.275617,  Lng: -86.109483),  Route carried "on" structure: County highway 23,  Year Built: 1972,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 880 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,408 (year 2041),  Design Load: H 15,  Features Intersected: ELK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.054,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.96m (26.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $658,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 260A1230001,  Location: EAST OF SR130 (Lat: 35.287567,  Lng: -86.187767),  Route carried "on" structure: County highway 123,  Year Built: 1994,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 810 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,296 (year 2039),  Design Load: HS 20,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 260A1250001,  Location: EAST OF SR130 (Lat: 35.274550,  Lng: -86.172683),  Route carried "on" structure: County highway 125,  Year Built: 1985,  Status: Open,  Structure Length: 4.51m (14.80ft),  Average Daily Traffic: 810 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,296 (year 2041),  Design Load: HS 20,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.721,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.51m (14.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $139,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $209,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 260A2010001,  Location: EAST OF SR16 (Lat: 35.267733,  Lng: -86.135833),  Route carried "on" structure: City street 1088,  Year Built: 1970,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,725 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,760 (year 2041),  Design Load: HS 20,  Features Intersected: TAYLOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.890,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 260A2260001,  Location: WEST OF SR16 (Lat: 35.290533,  Lng: -86.163067),  Route carried "on" structure: County highway 226,  Year Built: 1996,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 490 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 784 (year 2039),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.485,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 260A2640001,  Location: EAST OF SR16 (Lat: 35.262933,  Lng: -86.102417),  Route carried "on" structure: County highway 264,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 230 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 368 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.722,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 4.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 3.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $131,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $197,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 260A9510001,  Location: WEST OF SR130 (Lat: 35.275900,  Lng: -86.206367),  Route carried "on" structure: County highway 951,  Year Built: 1991,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 1,190 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,904 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.537,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 26F00110001,  Location: WEST OF SR16 (Lat: 35.253650,  Lng: -86.141867),  Route carried "on" structure: County highway 1088,  Year Built: 1967,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 1,725 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,760 (year 2042),  Design Load: H 20,  Features Intersected: ROCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.911,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.98m (22.90ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $485,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $728,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26S44060001,  Location: 1.5 MI.N.E. OF ESTILL SPR (Lat: 35.285833,  Lng: -86.106450),  Route carried "on" structure: State highway 279,  Year Built: 1962,  Status: Open,  Structure Length: 10.79m (35.40ft),  Average Daily Traffic: 940 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,504 (year 2041),  Design Load: H 15,  Features Intersected: ELK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.299,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.79m (35.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $511,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26S44200001,  Location: WEST OF SR16 (Lat: 35.276600,  Lng: -86.137550),  Route carried "on" structure: City street 893,  Year Built: 1955,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 3,000 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,800 (year 2041),  Design Load: HS 20,  Features Intersected: DRY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.315,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 26S44200003,  Location: WEST OF SR16 (Lat: 35.304250,  Lng: -86.194683),  Route carried "on" structure: County highway 893,  Year Built: 1960,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 690 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,104 (year 2041),  Design Load: HS 20,  Features Intersected: POORHOUSE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.520,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021
Find on map >>   Show street view

Structure Number: 26SR0160003,  Location: 1 MI.NE.OF ESTILL SPRINGS (Lat: 35.276417,  Lng: -86.133433),  Route carried "on" structure: Alternate US 41,  Year Built: 1940,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 10,252 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 16,403 (year 2041),  Design Load: HS 20,  Features Intersected: TAYLOR CREEK,  Facility Carried by Structure: FAP 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.350,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.6m (64.3ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $345,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $518,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 26SR0160005,  Location: 1 MI.SE.OF ESTILL SPRINGS (Lat: 35.259000,  Lng: -86.121817),  Route carried "on" structure: Alternate US 41,  Year Built: 1966,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 16.64m (54.59ft),  Average Daily Traffic: 12,190 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,504 (year 2041),  Design Load: HS 20,  Features Intersected: ELK RIVER,  Facility Carried by Structure: FAP 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.603,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.64m (54.59ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $5,783,000,  Roadway Improvement Cost: $579,000,  Total Project Cost: $8,675,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 26SR0160007,  Location: 2 MI.SE.OF ESTILL SPRINGS (Lat: 35.242767,  Lng: -86.116483),  Route carried "on" structure: Alternate US 41,  Year Built: 1941,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 12,190 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,504 (year 2041),  Design Load: HS 20,  Features Intersected: HESSEY BRANCH,  Facility Carried by Structure: FAP 16
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.486,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.4m (83.3ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $429,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $644,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: AFTNANZY03101,  Location: 0.3 MILES NORTH OF MORRIS (Lat: 35.297556,  Lng: -86.096667),  Route carried "on" structure: Federal lands road ,  Year Built: 1935,  Status: Open,  Structure Length: 16.15m (52.99ft),  Average Daily Traffic: 1 (year 2020),  Average Future Daily Traffic: 1 (year 2040),  Features Intersected: WOODS RESERVOIR,  Facility Carried by Structure: ARNOLD CENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Air Force,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $38,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 260A2180001,  Location: 1 MI FROM SPRING CR RD (Lat: 35.278383,  Lng: -86.133917),  Route carried "under" structure: City street 218,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 2%,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: CSX RR 349404N
Minimum Vertical Clearance: 4.25m (13.94ft),  Kilometerpoint: 3.249,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Discuss Estill Springs, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.