Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ethel, Mississippi (MS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 279ft / 84.8mTotal length
  • $7,759,000Total costs
  • 22,945Total average daily traffic
  • 3,050Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ethel
  • No street view available for this location

New bridges in Ethel, MS - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 41950-1959
  • 21960-1969
  • 21970-1979
  • 31980-1989
  • 21990-1999
  • 42000-2009
  • 62010-2019
Average Bridge Daily Traffic in Ethel, MS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Very good
  • 31.3%Good
  • 18.8%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 50.0%Very good
  • 18.8%Good
  • 18.8%Satisfactory
  • 12.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 43.8%Very good
  • 25.0%Good
  • 18.8%Satisfactory
  • 6.3%Fair
  • 6.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 9.1%Excellent
  • 40.9%Very good
  • 27.3%Good
  • 9.1%Satisfactory
  • 9.1%Fair
  • 4.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 62.5%Very good
  • 12.5%Good
  • 12.5%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 31000120041046,  Location: 4.3 MI E SR 35 SOUTH (Lat: 33.096675,  Lng: -89.514861),  Route carried "on" structure: State highway 12,  Year Built: 2013,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: HS 20,  Features Intersected: JAYBIRD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.028,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 31000120041074,  Location: 6.9 MI E SR 35 SOUTH (Lat: 33.120003,  Lng: -89.478225),  Route carried "on" structure: State highway 12,  Year Built: 2013,  Status: Open,  Structure Length: 3.71m (12.17ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,000 (year 2040),  Design Load: HS 20,  Features Intersected: LEFLORE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.322,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000120041102,  Location: 9.8 MI E SR 35 SOUTH (Lat: 33.147850,  Lng: -89.448108),  Route carried "on" structure: State highway 12,  Year Built: 2013,  Status: Open,  Structure Length: 7.36m (24.15ft),  Average Daily Traffic: 1,700 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,700 (year 2040),  Design Load: HS 20,  Features Intersected: COLE CREEK TRIBUTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.533,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 31000120041105,  Location: 10.1 MI E SR 35 SOUTH (Lat: 33.152322,  Lng: -89.444250),  Route carried "on" structure: State highway 12,  Year Built: 2013,  Status: Open,  Structure Length: 6.75m (22.15ft),  Average Daily Traffic: 1,700 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,700 (year 2040),  Design Load: HS 20,  Features Intersected: COLE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.145,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 36000120041074,  Location: 0.5 MI E SR 12 (Lat: 33.116292,  Lng: -89.475183),  Route carried "on" structure: State highway 739,  Year Built: 1986,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 1,100 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,100 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.874,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 5570107P,  Location: 4.0 MILES NORTH OF MS ROU (Lat: 33.149611,  Lng: -89.478722),  Route carried "on" structure: Federal lands road 1,  Year Built: 1964,  Status: Posted for load-capacity,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 1,140 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,254 (year 2032),  Design Load: H 15,  Features Intersected: COUNTY ROAD,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 273.080,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570110P,  Location: 5.1 MILES NORTH OF MS ROU (Lat: 33.161556,  Lng: -89.467833),  Route carried "on" structure: Federal lands road 1,  Year Built: 1942,  Status: Posted for load-capacity,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 1,140 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,254 (year 2032),  Design Load: H 15,  Features Intersected: BLACK CREEK,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 274.840,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: December 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570111P,  Location: 5.8 MILES NORTH OF MS ROU (Lat: 33.097306,  Lng: -89.513361),  Route carried "on" structure: Federal lands road 1,  Year Built: 1950,  Status: Posted for load-capacity,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,430 (year 2012),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,573 (year 2032),  Design Load: H 15,  Features Intersected: MS ROUTE 12,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 266.652,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $54,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5570204P,  Location: 0.1 MILES SOUTH OF MS ROU (Lat: 33.095611,  Lng: -89.514333),  Route carried "on" structure: Federal lands road 1,  Year Built: 1950,  Status: Posted for load-capacity,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 1,430 (year 2012),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,573 (year 2032),  Features Intersected: JAYBIRD CREEK,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 266.266,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.4m (17.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $525,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 5570349P,  Location: 3.1 MILES NORTH OF MS ROU (Lat: 33.137444,  Lng: -89.486750),  Route carried "on" structure: Federal lands road 1,  Year Built: 1950,  Status: Posted for load-capacity,  Structure Length: 1.11m (3.64ft),  Average Daily Traffic: 1,140 (year 2012),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,254 (year 2032),  Features Intersected: STREAM,  Facility Carried by Structure: NATCHEZ TRACE PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 271.650,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2018,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $38,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: SA0400000000079,  Location: SEC 2 T14N R 8E B (Lat: 33.097222,  Lng: -89.456667),  Route carried "on" structure: County highway 412,  Year Built: 2008,  Status: Open,  Structure Length: 4.00m (13.12ft),  Average Daily Traffic: 275 (year 2007),  Truck Traffic: 8%,  Average Future Daily Traffic: 345 (year 2030),  Design Load: HS 20,  Features Intersected: BCH YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 5053
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.046,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $595,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $695,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA040000000008,  Location: SEC 2 T14N R 8E B (Lat: 33.098572,  Lng: -89.457092),  Route carried "on" structure: County highway 412,  Year Built: 2008,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 275 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 345 (year 2035),  Design Load: HS 20,  Features Intersected: YOCKANOOKANY BCH RELIEF,  Facility Carried by Structure: CO. ROAD 5053
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.207,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $448,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $558,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA0400000000082,  Location: SEC 11 T14N R 8E (Lat: 33.092236,  Lng: -89.452286),  Route carried "on" structure: County highway 291,  Year Built: 1994,  Status: Posted for load,  Structure Length: 2.70m (8.86ft),  Average Daily Traffic: 50 (year 2021),  Average Future Daily Traffic: 75 (year 2041),  Design Load: H 15,  Features Intersected: BCH YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 5210
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.506,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 19.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $104,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $138,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: SA0400000000083,  Location: SEC 11 T14N R 8E B (Lat: 33.082653,  Lng: -89.441892),  Route carried "on" structure: County highway 412,  Year Built: 1966,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 230 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 345 (year 2035),  Design Load: HS 15,  Features Intersected: BCH YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 5053
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.632,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA0400000000084,  Location: SEC 12 T14N R 8E (Lat: 33.084722,  Lng: -89.427500),  Route carried "on" structure: County highway 292,  Year Built: 2005,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 60 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 90 (year 2035),  Design Load: HS 20,  Features Intersected: BCH YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 5217
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.804,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.3m (20.7ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA0400000000085,  Location: SEC 12 T14N R 8E (Lat: 33.087500,  Lng: -89.427500),  Route carried "on" structure: County highway 292,  Year Built: 2005,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 60 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 90 (year 2035),  Design Load: HS 20,  Features Intersected: BCH YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 5217
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.804,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA0400000000115,  Location: SEC 8 T15N R 8E (Lat: 33.166667,  Lng: -89.491667),  Route carried "on" structure: County highway 212,  Year Built: 1998,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 50 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: BCH YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 2235
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.804,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 31.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: SA0400000000117,  Location: SEC 15 T15N R 8E B (Lat: 33.162164,  Lng: -89.472181),  Route carried "on" structure: County highway 408,  Year Built: 1974,  Status: Posted for load,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 100 (year 2013),  Average Future Daily Traffic: 150 (year 2033),  Design Load: H 15,  Features Intersected: BCH YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 2247
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $160,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA0400000000119,  Location: SEC 34 T15N R 8E B (Lat: 33.110833,  Lng: -89.461944),  Route carried "on" structure: County highway 412,  Year Built: 1980,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 275 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 345 (year 2030),  Design Load: HS 15,  Features Intersected: YOCKANOOKANY RIVER,  Facility Carried by Structure: CO. ROAD 5053
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.816,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Poor,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $800,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA040000000012,  Location: SEC 34 T15N R 8E B (Lat: 33.112125,  Lng: -89.463311),  Route carried "on" structure: County highway 412,  Year Built: 1956,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 230 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 345 (year 2030),  Design Load: H 15,  Features Intersected: RELIEF FOR YOCKANOOKANY,  Facility Carried by Structure: CO. ROAD 5053
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.977,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.69m (28.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $998,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,098,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA0400000000122,  Location: SEC 35 T15N R 8E B (Lat: 33.123178,  Lng: -89.452922),  Route carried "on" structure: County highway 685,  Year Built: 1987,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 390 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 585 (year 2035),  Design Load: HS 20,  Features Intersected: YOCKANOOKANY CANAL,  Facility Carried by Structure: HANNAH ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $421,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $521,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA0400000000173,  Location: SEC 10 T14N R 8E (Lat: 33.092917,  Lng: -89.457333),  Route carried "on" structure: County highway 173,  Year Built: 1970,  Status: Closed,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 50 (year 2013),  Average Future Daily Traffic: 60 (year 2035),  Design Load: H 15,  Features Intersected: YOCKANOOKANY BCH RELIEF,  Facility Carried by Structure: CO. RD. 5120
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.036,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $189,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA040000000A121,  Location: SEC 35 T15N R 8E B (Lat: 33.122742,  Lng: -89.455881),  Route carried "on" structure: County highway 685,  Year Built: 2017,  Status: Open,  Structure Length: 8.63m (28.31ft),  Average Daily Traffic: 390 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 585 (year 2033),  Design Load: HL 93,  Features Intersected: OLD RIVER RUN,  Facility Carried by Structure: HANNAH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.804,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.85m (32.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,133,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,233,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: SA040000000A171,  Location: SEC 17 T15N R 8E (Lat: 33.153333,  Lng: -89.503056),  Route carried "on" structure: County highway 198,  Year Built: 2014,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 30 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 45 (year 2036),  Design Load: HS 20,  Features Intersected: BCH OF LEFLORE CREEK,  Facility Carried by Structure: CO. RD. 2230
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 184.200,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $350,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 31000120041048,  Location: 4.4 MI E SR 35 SOUTH (Lat: 33.097361,  Lng: -89.513311),  Route carried "under" structure: State highway 12,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 3,700 (year 2017),  Truck Traffic: 20%,  Features Intersected: SR 12,  Facility Carried by Structure: NATCHEZ TRACE
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 34.192,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 13.1m (43.0ft)

Discuss Ethel, Mississippi (MS) on our hugely popular Mississippi forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.