Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Eufaula, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 39Number of bridges
  • 787ft / 240mTotal length
  • $82,497,000Total costs
  • 191,421Total average daily traffic
  • 22,755Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eufaula
  • No street view available for this location

New bridges in Eufaula, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 21940-1949
  • 151960-1969
  • 51970-1979
  • 21980-1989
  • 61990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Eufaula, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Eufaula, AL
Average Bridge Truck Traffic in Eufaula, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.0%Very good
  • 12.0%Good
  • 8.0%Satisfactory
  • 52.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.0%Excellent
  • 24.0%Very good
  • 24.0%Good
  • 48.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.0%Excellent
  • 24.0%Very good
  • 36.0%Good
  • 16.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.1%Very good
  • 57.1%Good
  • 14.3%Satisfactory
  • 11.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 38.5%Good
  • 46.2%Satisfactory
  • 15.4%Fair
Find on map >>   Show street view

Structure Number: 2529,  Location: 2 MI.S.JCT.SR 95 (Lat: 31.772044,  Lng: -85.184697),  Route carried "on" structure: US 431,  Year Built: 1941,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 4,495 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,820 (year 2033),  Design Load: H 15,  Features Intersected: WHITE OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.965,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $1,812,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,993,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 314,  Location: 4.7 MI S COTTONTON (Lat: 32.080889,  Lng: -85.081444),  Route carried "on" structure: State highway 165,  Year Built: 1947,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,080 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,538 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.001,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $422,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 747,  Location: 5.7 MI N OF US 431 (Lat: 32.004000,  Lng: -85.160722),  Route carried "on" structure: County highway 97,  Year Built: 1961,  Status: Posted for load,  Structure Length: 12.35m (40.52ft),  Average Daily Traffic: 370 (year 2017),  Truck Traffic: 17%,  Average Future Daily Traffic: 370 (year 2037),  Design Load: H 15,  Features Intersected: SOUTH FORK COWIKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 13.20m (43.31ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $2,081,000,  Roadway Improvement Cost: $208,000,  Total Project Cost: $2,289,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7471,  Location: 7.6 MI N OF US 431 (Lat: 32.031722,  Lng: -85.165528),  Route carried "on" structure: County highway 97,  Year Built: 1961,  Status: Posted for load,  Structure Length: 9.06m (29.72ft),  Average Daily Traffic: 315 (year 2017),  Truck Traffic: 17%,  Average Future Daily Traffic: 315 (year 2037),  Design Load: H 15,  Features Intersected: MIDDLE FORK COWIKEECREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 10.03m (32.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,582,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $1,740,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7472,  Location: 8.6 MI NORTH OF US 431 (Lat: 32.046389,  Lng: -85.168389),  Route carried "on" structure: County highway 97,  Year Built: 1961,  Status: Posted for load,  Structure Length: 9.06m (29.72ft),  Average Daily Traffic: 219 (year 2017),  Truck Traffic: 17%,  Average Future Daily Traffic: 219 (year 2037),  Design Load: H 15,  Features Intersected: NORTH FORK COWIKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 10.03m (32.91ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,582,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $1,740,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7602,  Location: CITY OF EUFAULA (Lat: 31.865267,  Lng: -85.161883),  Route carried "on" structure: US 431,  Year Built: 1962,  Status: Open,  Structure Length: 12.59m (41.31ft),  Average Daily Traffic: 11,645 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,078 (year 2033),  Design Load: HS 20,  Features Intersected: BARBOUR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 104.088,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 39.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.42m (44.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $2,945,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $3,240,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7603,  Location: CITY OF EUFAULA (Lat: 31.865183,  Lng: -85.161733),  Route carried "on" structure: US 431,  Year Built: 1962,  Status: Open,  Structure Length: 12.59m (41.31ft),  Average Daily Traffic: 11,645 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,078 (year 2033),  Design Load: HS 20,  Features Intersected: BARBOUR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 104.088,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 39.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.42m (44.03ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $2,945,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $3,240,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7604,  Location: 0.3 MI.S.JCT.82 (Lat: 31.906717,  Lng: -85.149394),  Route carried "on" structure: US 431,  Year Built: 1962,  Status: Open,  Structure Length: 10.09m (33.10ft),  Average Daily Traffic: 10,020 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,973 (year 2033),  Design Load: HS 20,  Features Intersected: CHEWALLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.02m (36.15ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $2,417,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $2,659,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7605,  Location: 0.3 MI.S.JCT.US 82 (Lat: 31.906683,  Lng: -85.149258),  Route carried "on" structure: US 431,  Year Built: 1962,  Status: Open,  Structure Length: 10.09m (33.10ft),  Average Daily Traffic: 10,020 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,973 (year 2033),  Design Load: HS 20,  Features Intersected: CHEWALLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 42.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.02m (36.15ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $2,417,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $2,659,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7606,  Location: 0.1 MI. SOUTH JCT. US 82 (Lat: 31.909283,  Lng: -85.149133),  Route carried "on" structure: US 431,  Year Built: 1962,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 10,020 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,973 (year 2033),  Design Load: HS 20,  Features Intersected: C.OF.G.RR (ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.600,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,236,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,360,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7607,  Location: 0.1 MI. SOUTH JCT. US 82 (Lat: 31.909217,  Lng: -85.149133),  Route carried "on" structure: US 431,  Year Built: 1962,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 10,020 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 12,973 (year 2033),  Design Load: HS 20,  Features Intersected: C.G.RR (ABANDONED)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.600,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,236,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,360,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7641,  Location: EUFAULA-GA ST LINE (Lat: 31.891550,  Lng: -85.135200),  Route carried "on" structure: US 82,  Year Built: 1962,  Status: Open,  Structure Length: 34.50m (113.19ft),  Average Daily Traffic: 13,980 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,101 (year 2033),  Design Load: HS 20,  Features Intersected: CHATTAHOOCHEE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 385.946,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Navigation Control: Yes ( Vertical Clearance: 10.7m (35.1ft), Horizontal Clearance: 53.3m (174.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 5,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 34.50m (113.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $15,615,000,  Roadway Improvement Cost: $1,562,000,  Total Project Cost: $17,177,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 823,  Location: 0.4 MI. N. JCT. SR 131 (Lat: 31.830167,  Lng: -85.164183),  Route carried "on" structure: US 431,  Year Built: 1964,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 8,935 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,568 (year 2033),  Design Load: HS 20,  Features Intersected: CHENEYHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 100.046,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.20m (33.46ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $2,237,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $2,461,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8231,  Location: 0.4 MI. N. JCT. SR 131 (Lat: 31.830200,  Lng: -85.164000),  Route carried "on" structure: US 431,  Year Built: 1964,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 8,935 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 11,568 (year 2033),  Design Load: HS 20,  Features Intersected: CHENEYHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 100.046,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 4,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.20m (33.46ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $2,237,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $2,461,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8512,  Location: 0.4 MI. N. JCT. US 82 (Lat: 31.934200,  Lng: -85.137428),  Route carried "on" structure: US 431,  Year Built: 1937,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 17,500 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 22,658 (year 2033),  Design Load: H 15,  Features Intersected: TWO MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 112.673,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 88.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,635,000,  Roadway Improvement Cost: $164,000,  Total Project Cost: $1,799,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 8513,  Location: 1.2 MI. N. JCT. U.S.82 (Lat: 31.942533,  Lng: -85.129233),  Route carried "on" structure: US 431,  Year Built: 1937,  Year Reconstructed: 1965,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 17,500 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 22,658 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 113.864,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 81.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $940,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,034,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9096,  Location: .2 MI W OF US 431 (Lat: 31.807389,  Lng: -85.168167),  Route carried "on" structure: County highway 34,  Year Built: 1967,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 260 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 386 (year 2038),  Design Load: HS 15,  Features Intersected: BLACKS BRANCH,  Facility Carried by Structure: LEROY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 83.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $420,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $462,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9548,  Location: .7 MI W OF US 431 (Lat: 31.900489,  Lng: -85.158200),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 832 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,188 (year 2038),  Design Load: HS 15,  Features Intersected: CHEWALLA CREEK,  Facility Carried by Structure: SPRUCE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.42m (4.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $467,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $514,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11135,  Location: 1.3 MI. WEST JC 431 (Lat: 31.996750,  Lng: -85.129517),  Route carried "on" structure: State lands road ,  Year Built: 1974,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 80 (year 2013),  Average Future Daily Traffic: 115 (year 2033),  Features Intersected: BRANCH,  Facility Carried by Structure: STATE PARK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.041,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $410,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $451,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 11282,  Location: 1.4 MI. N. US 431 (Lat: 32.007633,  Lng: -85.093667),  Route carried "on" structure: State highway 165,  Year Built: 1975,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 2,080 (year 2013),  Truck Traffic: 19%,  Average Future Daily Traffic: 3,031 (year 2033),  Design Load: HS 20,  Features Intersected: WYLAUNEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.258,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,061,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,167,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11895,  Location: .3 MI.E.BARBOUR 89 (Lat: 31.960586,  Lng: -85.208053),  Route carried "on" structure: US 82,  Year Built: 1929,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,870 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 2,421 (year 2033),  Design Load: H 15,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 374.601,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 49.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $705,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $776,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1197,  Location: 2.7 MI.E.BARBOUR 89 (Lat: 31.939233,  Lng: -85.175117),  Route carried "on" structure: US 82,  Year Built: 1978,  Status: Open,  Structure Length: 1.14m (3.74ft),  Average Daily Traffic: 2,070 (year 2013),  Truck Traffic: 22%,  Average Future Daily Traffic: 2,680 (year 2033),  Design Load: HS 20,  Features Intersected: CRAZY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 378.492,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $924,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12138,  Location: 0.4 MI. S. JCT. SR 165 (Lat: 31.990294,  Lng: -85.114722),  Route carried "on" structure: State lands road 431,  Year Built: 1979,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 140 (year 2013),  Truck Traffic: 1%,  Average Future Daily Traffic: 220 (year 2033),  Design Load: HS 20,  Features Intersected: US 431,  Facility Carried by Structure: LAKEPOINT PARK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 119.449,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Park, Forest, or Reservation Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.32m (30.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,556,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $2,812,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13097,  Location: POWELL RD. (Lat: 31.554400,  Lng: -86.212811),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 40 (year 1993),  Average Future Daily Traffic: 44 (year 2034),  Design Load: H 10,  Features Intersected: BRYANT MILL CREEK,  Facility Carried by Structure: POWELL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14573,  Location: 2.4 MI SOUTH OF AL HWY 30 (Lat: 31.840578,  Lng: -85.219961),  Route carried "on" structure: County highway 32,  Year Built: 1988,  Status: Open,  Structure Length: 2.06m (6.76ft),  Average Daily Traffic: 270 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 300 (year 2037),  Design Load: HS 20,  Features Intersected: CHANEYHATCHEE CREEK,  Facility Carried by Structure: COTTONHILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $783,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $861,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14982,  Location: 6 MI S W COTTONTON (Lat: 32.071969,  Lng: -85.116800),  Route carried "on" structure: County highway 44,  Year Built: 1934,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 38 (year 1980),  Average Future Daily Traffic: 64 (year 2030),  Features Intersected: BARBOUR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,003,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15299,  Location: 1.8 MILES S OF AL 30 (Lat: 31.838656,  Lng: -85.197125),  Route carried "on" structure: County highway 36,  Year Built: 1962,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 250 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 250 (year 2037),  Design Load: H 15,  Features Intersected: CHENEYHATCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.76m (28.74ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,381,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $1,519,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15476,  Location: 6.3 MI N. OF US 431 (Lat: 32.061617,  Lng: -85.088617),  Route carried "on" structure: State highway 165,  Year Built: 1991,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 1,780 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,594 (year 2033),  Design Load: HS 20,  Features Intersected: LITTLE BARBOUR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.649,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.76m (9.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,469,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,616,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15523,  Location: 2 MI. S.JCT. SR.95 (Lat: 31.771861,  Lng: -85.184533),  Route carried "on" structure: US 431,  Year Built: 1992,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 4,495 (year 2013),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,820 (year 2033),  Design Load: HS 20,  Features Intersected: WHITE OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.965,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.73m (31.92ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $2,802,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $3,082,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16906,  Location: 0.9 MI S JCT SR 165 (Lat: 31.981969,  Lng: -85.114511),  Route carried "on" structure: US 431,  Year Built: 1997,  Status: Open,  Structure Length: 16.86m (55.31ft),  Average Daily Traffic: 6,175 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,995 (year 2033),  Design Load: HS 20,  Features Intersected: COWIKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 118.560,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.58m (57.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $5,063,000,  Roadway Improvement Cost: $506,000,  Total Project Cost: $5,569,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16911,  Location: 0.9MI S JCT SR 165 (Lat: 31.982336,  Lng: -85.114303),  Route carried "on" structure: US 431,  Year Built: 1998,  Status: Open,  Structure Length: 12.62m (41.40ft),  Average Daily Traffic: 6,175 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 7,995 (year 2033),  Design Load: HS 20,  Features Intersected: COWIKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 118.602,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.45m (44.13ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $3,874,000,  Roadway Improvement Cost: $387,000,  Total Project Cost: $4,261,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16912,  Location: 2.7MI N OF JCT US 82 (Lat: 31.955606,  Lng: -85.121131),  Route carried "on" structure: US 431,  Year Built: 1997,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 12,360 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 16,003 (year 2033),  Design Load: HS 20,  Features Intersected: TONY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.261,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,748,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $1,923,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17392,  Location: 0.9 MI WEST OF 431JCT 165 (Lat: 32.001103,  Lng: -85.127803),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 210 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 295 (year 2038),  Design Load: HS 15,  Features Intersected: DILLARS CREEK,  Facility Carried by Structure: ROCKY MOUNT CH RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $787,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $866,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 17991,  Location: BARBOUR CO. LINE (Lat: 31.771667,  Lng: -85.153333),  Route carried "on" structure: State highway 95,  Year Built: 2007,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 2,260 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,129 (year 2033),  Design Load: HS 20,  Features Intersected: WHITE OAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.425,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $3,004,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $3,304,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18349,  Location: 5 MI EAST OF COUNTY RD 79 (Lat: 31.933689,  Lng: -85.268428),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 70 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 75 (year 2038),  Design Load: HS 20,  Features Intersected: DOWDY CREEK,  Facility Carried by Structure: OLD BATESVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1835,  Location: 5.8 MILES NW OF CO 93 (Lat: 31.929017,  Lng: -85.278125),  Route carried "on" structure: County highway 1211,  Year Built: 2004,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 50 (year 2006),  Average Future Daily Traffic: 70 (year 2036),  Design Load: HS 20,  Features Intersected: COPPER CREEK,  Facility Carried by Structure: OLD BATESVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18351,  Location: 1.25 MI N FOX RIDGE RD (Lat: 31.937917,  Lng: -85.178242),  Route carried "on" structure: County highway 1204,  Year Built: 2003,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 150 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 180 (year 2037),  Design Load: HS 20,  Features Intersected: CHEWALLA CREEK,  Facility Carried by Structure: FROST MARLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20789,  Location: 1.8 MI S SR-30 (Lat: 31.857350,  Lng: -85.271778),  Route carried "on" structure: County highway 1262,  Year Built: 2016,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 17 (year 2016),  Truck Traffic: 19%,  Average Future Daily Traffic: 25 (year 2036),  Design Load: HS 20,  Features Intersected: Howell Creek,  Facility Carried by Structure: Old Sardis Ch Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 12138,  Location: 0.4 MI. S. JCT. SR 165 (Lat: 31.990294,  Lng: -85.114722),  Route carried "under" structure: US 431,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 12,050 (year 2013),  Truck Traffic: 16%,  Features Intersected: US 431,  Facility Carried by Structure: LAKEPOINT PARK RD
Minimum Vertical Clearance: 6.80m (22.31ft),  Kilometerpoint: 119.449,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Discuss Eufaula, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.