Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Farmington, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 174ft / 53.1mTotal length
  • $27,928,000Total costs
  • 132,453Total average daily traffic
  • 3,675Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Farmington
  • No street view available for this location

New bridges in Farmington, NY - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 31980-1989
  • 31990-1999
  • 92000-2009
  • 12010-2019
Reconstructed bridges in Farmington, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Farmington, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Excellent
  • 30.8%Very good
  • 30.8%Good
  • 30.8%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Excellent
  • 46.2%Very good
  • 23.1%Good
  • 23.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Excellent
  • 30.8%Very good
  • 53.8%Good
  • 7.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 28.6%Good
  • 42.9%Fair
Find on map >>   Show street view

Structure Number: 1046051,  Location: 1 0 MI N JCT RTS 332& 96 (Lat: 42.986778,  Lng: -77.363403),  Route carried "on" structure: State highway 332,  Year Built: 2000,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 8,552 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,592 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: PLASTER MILL ROAD, Finge
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.143,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.6m (152.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,589,000,  Roadway Improvement Cost: $930,000,  Total Project Cost: $2,519,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1046052,  Location: 1 MI N JCT SH 332 & SH 96 (Lat: 42.986842,  Lng: -77.363189),  Route carried "on" structure: State highway 332,  Year Built: 2001,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 8,552 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,592 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: PLASTER MILL ROAD, Finge
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.143,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.6m (152.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,604,000,  Roadway Improvement Cost: $939,000,  Total Project Cost: $2,543,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 227049,  Location: 50 ft S of JCT 41 & Wood (Lat: 42.964381,  Lng: -77.327975),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 1,533 (year 2020),  Average Future Daily Traffic: 2,146 (year 2040),  Features Intersected: East Branch of Beaver Cr,  Facility Carried by Structure: Wood Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $295,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $468,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331807,  Location: 3 MI NE OF VICTOR (Lat: 43.011947,  Lng: -77.367983),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Posted for load-capacity,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 1,914 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,933 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GANARGUA CREEK,  Facility Carried by Structure: BROWNSVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $982,000,  Roadway Improvement Cost: $575,000,  Total Project Cost: $1,558,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331823,  Location: 1 MI W OF FARMINGTON (Lat: 43.032425,  Lng: -77.355417),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 2,079 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,911 (year 2036),  Design Load: HL 93,  Features Intersected: GANARGUA CREEK,  Facility Carried by Structure: ALLEN PADGHAM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.864,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.63m (15.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,344,000,  Roadway Improvement Cost: $787,000,  Total Project Cost: $2,130,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 331876,  Location: 0.5 MI W OF MERTENSIA (Lat: 42.961481,  Lng: -77.368756),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 4,092 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,063 (year 2040),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: BOUGHTON HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.509,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $1,043,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33508,  Location: CITY OF NORWICH (Lat: 42.522381,  Lng: -75.513408),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 5,387 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,665 (year 2039),  Design Load: HS 20,  Features Intersected: CHENANGO RIVER,  Facility Carried by Structure: COUNTY ROAD 32A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,482,000,  Roadway Improvement Cost: $868,000,  Total Project Cost: $2,350,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33527,  Location: AT BURNWOOD (Lat: 41.947581,  Lng: -75.060483),  Route carried "on" structure: Other road ,  Year Built: 1956,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 57 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 80 (year 2039),  Design Load: HS 20,  Features Intersected: TROUT BROOK,  Facility Carried by Structure: BURNWOOD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $583,000,  Roadway Improvement Cost: $341,000,  Total Project Cost: $924,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 337022,  Location: .4 MILE WEST OF SH 332 (Lat: 42.962950,  Lng: -77.356067),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,092 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,063 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: BEAVER CREEK,  Facility Carried by Structure: COUNTY ROAD 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.571,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $537,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 551063,  Location: EXIT 44 90IX (Lat: 42.995753,  Lng: -77.367592),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1995,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 11,403 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,858 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: EXIT 44 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 22 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.33m (20.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,774,000,  Roadway Improvement Cost: $1,624,000,  Total Project Cost: $4,398,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 551093,  Location: 1.1 MI E OF EXIT 44 90I (Lat: 42.994222,  Lng: -77.344994),  Route carried "on" structure: Other road ,  Year Built: 2005,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 2,912 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,077 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: HOOK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.204,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 94.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.06m (19.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,047,000,  Roadway Improvement Cost: $1,198,000,  Total Project Cost: $3,245,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 551094,  Location: 2.1 MI E OF EXIT 44 90I (Lat: 42.991119,  Lng: -77.326264),  Route carried "on" structure: County highway ,  Year Built: 2006,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 2,271 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,809 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.852,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 94.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.06m (19.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,225,000,  Roadway Improvement Cost: $1,303,000,  Total Project Cost: $3,528,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 551095,  Location: 2.3 MI W OF EXIT 43 90I (Lat: 42.980994,  Lng: -77.276978),  Route carried "on" structure: County highway ,  Year Built: 1952,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 3,113 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,358 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 28 BLACKSMITH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.640,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.28m (23.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,693,000,  Roadway Improvement Cost: $992,000,  Total Project Cost: $2,685,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1046051,  Location: 1 0 MI N JCT RTS 332& 96 (Lat: 42.986778,  Lng: -77.363403),  Route carried "under" structure: County highway ,  Year Built: 2000,  Structure Length: 0. m,  Features Intersected: PLASTER MILL ROAD, Finge,  Facility Carried by Structure: RTE 332
Minimum Vertical Clearance: 6.32m (20.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 1046052,  Location: 1 MI N JCT SH 332 & SH 96 (Lat: 42.986842,  Lng: -77.363189),  Route carried "under" structure: Other road ,  Year Built: 2001,  Structure Length: 0. m,  Features Intersected: PLASTER MILL ROAD, Finge,  Facility Carried by Structure: RTE 332
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 551063,  Location: EXIT 44 90IX (Lat: 42.995753,  Lng: -77.367592),  Route carried "under" structure: Interstate 90,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 22,670 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: EXIT 44 RAMP
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 558.532,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 551093,  Location: 1.1 MI E OF EXIT 44 90I (Lat: 42.994222,  Lng: -77.344994),  Route carried "under" structure: Interstate 90,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 18,494 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: HOOK RD
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 556.682,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Prestressed concrete,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 551094,  Location: 2.1 MI E OF EXIT 44 90I (Lat: 42.991119,  Lng: -77.326264),  Route carried "under" structure: Interstate 90,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 17,666 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 8
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 555.121,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 551095,  Location: 2.3 MI W OF EXIT 43 90I (Lat: 42.980994,  Lng: -77.276978),  Route carried "under" structure: Interstate 90,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 17,666 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: CR 28 BLACKSMITH
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 550.954,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Discuss Farmington, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.