Bridge Statistics for Foley, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 40Number of bridges
  • 331ft / 101mTotal length
  • $39,933,000Total costs
  • 272,110Total average daily traffic
  • 12,863Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Foley
  • No street view available for this location

New bridges in Foley, AL - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 31970-1979
  • 81980-1989
  • 121990-1999
  • 82000-2009
  • 52010-2019
  • 22020-2022
Average Bridge Daily Traffic in Foley, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.1%Excellent
  • 9.1%Very good
  • 50.0%Good
  • 27.3%Satisfactory
  • 4.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Excellent
  • 27.3%Very good
  • 50.0%Good
  • 13.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.6%Very good
  • 63.6%Good
  • 18.2%Satisfactory
  • 4.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.6%Excellent
  • 38.5%Very good
  • 30.8%Good
  • 15.4%Satisfactory
  • 12.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 23.5%Very good
  • 11.8%Good
  • 52.9%Satisfactory
  • 11.8%Fair
Find on map >>   Show street view

Structure Number: 2021,  Location: 1.5 MI SO JCT ST RT 160 (Lat: 33.990000,  Lng: -86.566667),  Route carried "on" structure: US 231,  Year Built: 1939,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 6,460 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 8,397 (year 2041),  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 418.616,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $466,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $513,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11675,  Location: 0.25 MI S C0 RD 10 (Lat: 30.329889,  Lng: -87.683222),  Route carried "on" structure: State highway 59,  Year Built: 1976,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 18,342 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 27,513 (year 2039),  Design Load: HS 20,  Features Intersected: BOGGY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.091,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $1,507,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $1,658,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11676,  Location: 0.25 MI S CO RD 10 (Lat: 30.329917,  Lng: -87.683000),  Route carried "on" structure: State highway 59,  Year Built: 1976,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 18,342 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 27,513 (year 2039),  Design Load: HS 20,  Features Intersected: BOGGY BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.091,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.11m (16.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $1,507,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $1,658,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11677,  Location: 0.1 MI S CO RD 12 (Lat: 30.353639,  Lng: -87.683167),  Route carried "on" structure: State highway 59,  Year Built: 1974,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 42,233 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 63,349 (year 2039),  Design Load: HS 20,  Features Intersected: KELLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.716,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.0m (75.5ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.24m (7.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,564,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $1,720,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12865,  Location: 2.7 MI N JCT US 98 (Lat: 30.445500,  Lng: -87.683256),  Route carried "on" structure: State highway 59,  Year Built: 1936,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 27,857 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 41,786 (year 2039),  Design Load: H 15,  Features Intersected: MAGNOLIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.900,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.1m (69.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 38.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $926,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13595,  Location: 1.4 MI. W. OF AL. HWY. 59 (Lat: 30.355669,  Lng: -87.707558),  Route carried "on" structure: County highway 12,  Year Built: 1985,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,753 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,368 (year 2038),  Design Load: HS 20,  Features Intersected: BON SECOUR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,005,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,106,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 13649,  Location: 0.8 MI E SR 59 (Lat: 30.406833,  Lng: -87.668694),  Route carried "on" structure: US 98,  Year Built: 1985,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 9,563 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,345 (year 2040),  Design Load: HS 20,  Features Intersected: WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 105.536,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 85.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $379,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $417,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1365,  Location: 1.7 MI E SR 59 (Lat: 30.406836,  Lng: -87.655867),  Route carried "on" structure: US 98,  Year Built: 1985,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 11,559 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,338 (year 2039),  Design Load: HS 20,  Features Intersected: WORM BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.762,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $361,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14233,  Location: 0.6 MI E CO 49 (Lat: 30.406572,  Lng: -87.756425),  Route carried "on" structure: US 98,  Year Built: 1987,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 11,942 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,913 (year 2039),  Design Load: HS 20,  Features Intersected: SCHOOL HOUSE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.063,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $977,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,075,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14234,  Location: 3.2 MI E SR 59 (Lat: 30.406864,  Lng: -87.630447),  Route carried "on" structure: US 98,  Year Built: 1987,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 10,420 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,630 (year 2039),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.215,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.05m (16.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,488,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $1,637,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14259,  Location: 2.6 MI. N. OF CO. RD. 32 (Lat: 30.510931,  Lng: -87.581678),  Route carried "on" structure: County highway 87,  Year Built: 1987,  Status: Open,  Structure Length: 11.43m (37.50ft),  Average Daily Traffic: 1,247 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,684 (year 2039),  Design Load: HS 20,  Features Intersected: BLACKWATER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.30m (40.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,531,000,  Roadway Improvement Cost: $253,000,  Total Project Cost: $2,784,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14586,  Location: 1.1 MI W CO 65 (Lat: 30.406608,  Lng: -87.737486),  Route carried "on" structure: US 98,  Year Built: 1988,  Status: Open,  Structure Length: 10.00m (32.81ft),  Average Daily Traffic: 11,942 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 17,913 (year 2039),  Design Load: HS 20,  Features Intersected: MAGNOLIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.941,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.93m (35.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,147,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $3,462,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15655,  Location: 0.63 MI. W. SR 59 (Lat: 30.392103,  Lng: -87.692092),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 298 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 402 (year 2038),  Design Load: H 15,  Features Intersected: RELIEF,  Facility Carried by Structure: W. MICHIGAN AVENU
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 9.502,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $366,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15819,  Location: 0.5 MI N US 98 (Lat: 30.413119,  Lng: -87.683764),  Route carried "on" structure: State highway 59,  Year Built: 1993,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 29,936 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 44,904 (year 2039),  Design Load: HS 20,  Features Intersected: WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.316,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $881,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15824,  Location: 0.2 MI N US 98 (Lat: 30.409389,  Lng: -87.676272),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 1,420 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,917 (year 2038),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: NORTH POPLAR ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.520,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 66.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $862,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16028,  Location: 0.3 MI. N. OF CO. RD. 20 (Lat: 30.373372,  Lng: -87.632553),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 239 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 323 (year 2039),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: SWIFT CHURCH RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Underwater Inspection Date: December 2018,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16192,  Location: 0.9 MI. W. OF AL. HWY. 59 (Lat: 30.436028,  Lng: -87.698725),  Route carried "on" structure: County highway 24,  Year Built: 1995,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 1,716 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,316 (year 2039),  Design Load: HS 20,  Features Intersected: MAGNOLIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $661,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $727,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16193,  Location: 0.5 MI. E. OF CO. RD. 55 (Lat: 30.435981,  Lng: -87.732831),  Route carried "on" structure: County highway 24,  Year Built: 1995,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 1,042 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,407 (year 2039),  Design Load: HS 20,  Features Intersected: W PRONG OF MAGNOLIA RI.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $923,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,015,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16195,  Location: 3.9 MI. E. OF AL. HWY. 59 (Lat: 30.370358,  Lng: -87.618492),  Route carried "on" structure: County highway 20,  Year Built: 1996,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 2,447 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,303 (year 2038),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Underwater Inspection Date: December 2018,  Bridge Improvement Cost: $1,446,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $1,591,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16347,  Location: 1.2 MI. N. OF U. S. 98 (Lat: 30.424781,  Lng: -87.717144),  Route carried "on" structure: County highway 65,  Year Built: 1996,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 3,322 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,458 (year 2038),  Design Load: H 15,  Features Intersected: MAGNOLIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $896,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $986,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1635,  Location: 3.6 MI. E. OF AL. HWY. 59 (Lat: 30.370331,  Lng: -87.623319),  Route carried "on" structure: County highway 20,  Year Built: 1996,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 2,386 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,221 (year 2038),  Design Load: HS 20,  Features Intersected: WOLF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2020,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,543,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16714,  Location: 1.2 MI. W. OF CO. RD. 87 (Lat: 30.472869,  Lng: -87.616594),  Route carried "on" structure: County highway 32,  Year Built: 1997,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 1,128 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,522 (year 2038),  Design Load: HS 20,  Features Intersected: MAURICE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.85m (9.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $708,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17278,  Location: 0.5 MI. N. OF CO. RD. 24 (Lat: 30.442836,  Lng: -87.691719),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 71 (year 2018),  Average Future Daily Traffic: 96 (year 2038),  Design Load: HS 20,  Features Intersected: CREEK ( NO NAME ),  Facility Carried by Structure: SHOOTS LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $245,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 17668,  Location: 3.4 MI. E. OF AL. HWY. 59 (Lat: 30.355772,  Lng: -87.627353),  Route carried "on" structure: County highway 12,  Year Built: 1999,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 54 (year 2019),  Average Future Daily Traffic: 72 (year 2039),  Design Load: H 15,  Features Intersected: OWENS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.2m (7.2ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $464,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $510,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1787,  Location: 0.9 MI.W. OF STATE HWY 59 (Lat: 30.355642,  Lng: -87.698889),  Route carried "on" structure: County highway 12,  Year Built: 2001,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,820 (year 2019),  Average Future Daily Traffic: 2,458 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $553,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19521,  Location: 0.47 miles East of Hwy 59 (Lat: 30.341061,  Lng: -87.675086),  Route carried "on" structure: County highway 100,  Year Built: 2017,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 217 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 286 (year 2039),  Design Load: HS 20,  Features Intersected: Boggy Branch,  Facility Carried by Structure: Keller Road
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $376,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $414,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19541,  Location: 0.3 MI. E. OF AL. HWY. 59 (Lat: 30.355683,  Lng: -87.677497),  Route carried "on" structure: County highway 12,  Year Built: 2005,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,906 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,512 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH OF BON SECOUR RI.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 56.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.81m (5.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $438,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $482,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19971,  Location: 1.2 MI. N. OF US 98 (Lat: 30.425500,  Lng: -87.648500),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 4,308 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,674 (year 2039),  Design Load: HS 20,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: BEACH EXPRESS SO.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,141,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,255,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19972,  Location: 1.2 MI. N. OF US 98 (Lat: 30.425500,  Lng: -87.648300),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 4,308 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,674 (year 2039),  Design Load: HS 20,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: BEACH EXPRESS NO.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,141,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,255,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19973,  Location: 1.8 M. SO. OF U.S. 98 (Lat: 30.381389,  Lng: -87.651667),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 4,308 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,674 (year 2039),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: BEACH EXPRESS SO.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19974,  Location: 1.8 M. SO. OF U.S. 98 (Lat: 30.381111,  Lng: -87.651667),  Route carried "on" structure: City street ,  Year Built: 2000,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 4,308 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,674 (year 2039),  Design Load: HS 20,  Features Intersected: WOLF CREEK,  Facility Carried by Structure: BEACH EXPRESS NO.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20199,  Location: 155' S. OF W. SECTION AV (Lat: 30.400000,  Lng: -87.683333),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 0.83m (2.72ft),  Average Daily Traffic: 210 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 284 (year 2038),  Design Load: HS 20,  Features Intersected: BRANCH OF WOLF CREEK,  Facility Carried by Structure: N. ALSTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $579,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2021,  Location: 0.3 MI. S. OF CR 24 (Lat: 30.431300,  Lng: -87.704200),  Route carried "on" structure: City street ,  Year Built: 2010,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 106 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 139 (year 2039),  Design Load: HS 20,  Features Intersected: MAGNOLIA RIVER,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $815,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 20267,  Location: 0.1 MI.SO. OF CO. RD.24 (Lat: 30.435556,  Lng: -87.691667),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 209 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 275 (year 2039),  Design Load: H 20,  Features Intersected: DRAINAGE,  Facility Carried by Structure: NORTH CEDAR STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.35m (4.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $429,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20268,  Location: 0.5 MI. EAST OF HWY.59 (Lat: 30.370289,  Lng: -87.674814),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 2,414 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,181 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE,  Facility Carried by Structure: MIFLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 19.8m (65.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $868,000,  Roadway Improvement Cost: $87,000,  Total Project Cost: $955,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21107,  Location: 1.17 M. W. of Hwy. 59_ (Lat: 30.392039,  Lng: -87.702994),  Route carried "on" structure: County highway 26,  Year Built: 2016,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 1,025 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,383 (year 2041),  Design Load: HS 20,  Features Intersected: Trib. to Bon Secour Ri._
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 86.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $290,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21212,  Location: _500' S. of US 98 (Lat: 30.405178,  Lng: -87.666369),  Route carried "on" structure: City street ,  Year Built: 2015,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 51 (year 2019),  Average Future Daily Traffic: 68 (year 2039),  Design Load: HS 20,  Features Intersected: _Trib. to Wolf Creek,  Facility Carried by Structure: _S. Pecan St.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $495,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21563,  Location: 0.2 MI. N. of Co. Rd. 12 (Lat: 30.358181,  Lng: -87.717142),  Route carried "on" structure: County highway 65,  Year Built: 2021,  Status: Open,  Structure Length: 2.03m (6.66ft),  Average Daily Traffic: 1,726 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,273 (year 2041),  Design Load: HL 93,  Features Intersected: Turkey Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.79m (9.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $650,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $715,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21564,  Location: 0.8 Mi. SE of C.R. 26 (Lat: 30.388450,  Lng: -87.653203),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 3.06m (10.04ft),  Average Daily Traffic: 115 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 158 (year 2038),  Design Load: HL 93,  Features Intersected: Wolf Creek,  Facility Carried by Structure: Doc McDuffie Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.8m (35.4ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 10.3m (33.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.91m (12.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $911,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,002,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21287,  Location: 450' North of US 98 (Lat: 30.407617,  Lng: -87.683783),  Route carried "under" structure: State highway 59,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 29,360 (year 2015),  Truck Traffic: 7%,  Features Intersected: SR 59,  Facility Carried by Structure: Pedestrian Bridge
Minimum Vertical Clearance: 6.14m (20.14ft),  Kilometerpoint: 17.708,  Lanes under structure: 5,  Length of Maximum Span: 33.5m (109.9ft)

Discuss Foley, Alabama (AL) on our hugely popular Alabama forum.