  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 115ft / 35.1mTotal length
  • $31,759,000Total costs
  • 102,377Total average daily traffic
  • 3,964Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Folsom
  • No street view available for this location

New bridges in Folsom, NJ - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 11960-1969
  • 11970-1979
  • 31990-1999
  • 42010-2019
Average Bridge Daily Traffic in Folsom, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 50.0%Good
  • 25.0%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 8.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 41.7%Good
  • 16.7%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.0%Very good
  • 20.0%Good
  • 40.0%Satisfactory
  • 10.0%Fair
Find on map >>   Show street view

Structure Number: 114154,  Location: 0.33 MI S OF 54-322 JCT. (Lat: 39.588119,  Lng: -74.858581),  Route carried "on" structure: State highway 54,  Year Built: 2015,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 11,775 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,130 (year 2041),  Design Load: HL 93,  Features Intersected: CONRAIL/HOSPITALITYBROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.203,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 54.3m (178.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $10,670,000,  Roadway Improvement Cost: $1,067,000,  Total Project Cost: $16,565,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 114155,  Location: 0.91 MILES S OF NJ 73 (Lat: 39.592311,  Lng: -74.854431),  Route carried "on" structure: State highway 54,  Year Built: 2015,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 11,775 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 14,130 (year 2041),  Design Load: HL 93,  Features Intersected: US 322
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.734,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 50.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,900,000,  Roadway Improvement Cost: $360,000,  Total Project Cost: $5,589,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 114157,  Location: 0.20 MI NO.OF US 322 (Lat: 39.594519,  Lng: -74.851619),  Route carried "on" structure: State highway 54,  Year Built: 1941,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 12,615 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,140 (year 2041),  Features Intersected: GREAT EGG HARBOR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.056,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 114159,  Location: 0.6 M S OF AC EXPY. (Lat: 39.607969,  Lng: -74.836311),  Route carried "on" structure: State highway 54,  Year Built: 1941,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 14,530 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,435 (year 2041),  Features Intersected: PENNY POT STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.052,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $548,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $904,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11915,  Location: 0.16 MI WEST OF NJ 54 (Lat: 39.594000,  Lng: -74.857069),  Route carried "on" structure: US 322,  Year Built: 2015,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 12,490 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,240 (year 2041),  Design Load: HL 93,  Features Intersected: Conrail Beesleys Pt Sec
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.345,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 25.4m (83.3ft),  Out-to-Out Width: 30.7m (100.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,840,000,  Roadway Improvement Cost: $484,000,  Total Project Cost: $7,515,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 119151,  Location: 2.3 MI EAST OF NJ 54 (Lat: 39.569811,  Lng: -74.821389),  Route carried "on" structure: US 322,  Year Built: 1961,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 8,852 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,945 (year 2041),  Design Load: HS 20,  Features Intersected: PENNY POT LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.433,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 27.7m (90.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $395,000,  Total Project Cost: $472,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1BV003,  Location: 0.2 MI NORTH US ROUTE 322 (Lat: 39.575769,  Lng: -74.822331),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 1,921 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,305 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: GREAT EGG HARBOR RIVER,  Facility Carried by Structure: EIGHTH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.672,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Underwater Inspection Date: April 2019,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 1BV006,  Location: 0.98 MI N. OF US RT 322 (Lat: 39.583950,  Lng: -74.830300),  Route carried "on" structure: Spur County highway 561S,  Year Built: 1934,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 5,209 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,251 (year 2041),  Design Load: HS 20,  Features Intersected: GREAT EGG HARBOR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.577,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $179,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1BV007,  Location: .16 MI. S.OF RT. 322 (Lat: 39.571739,  Lng: -74.827061),  Route carried "on" structure: City street ,  Year Built: 1937,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 914 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,097 (year 2041),  Design Load: HL 93,  Features Intersected: HOSPITALITY BRANCH,  Facility Carried by Structure: EIGHTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.283,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $535,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1BV011,  Location: 0.2 MI SOUTH OF RT 322 (Lat: 39.600781,  Lng: -74.881831),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 4,850 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,820 (year 2041),  Design Load: HS 20,  Features Intersected: HOSPITALITY BRANCH,  Facility Carried by Structure: CAINS MILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Underwater Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1FB036,  Location: .3 MILES N OF RT.322 (Lat: 39.603711,  Lng: -74.865889),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,401 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,682 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: GREAT EGG HARBOR RIVER,  Facility Carried by Structure: FOURTEENTH STREET
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 809Q03,  Location: 1 MI NORTH OF US RT 322 (Lat: 39.620561,  Lng: -74.892689),  Route carried "on" structure: Other road ,  Year Built: 1997,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 3,555 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,266 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GREAT EGG HARBOR CREEK,  Facility Carried by Structure: PINEY HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 114155,  Location: 0.91 MILES S OF NJ 73 (Lat: 39.592311,  Lng: -74.854431),  Route carried "under" structure: US 322,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 12,490 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 322,  Facility Carried by Structure: NJ 54
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 55.603,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 14.9m (48.9ft)