Bridge Statistics for Fort Hall, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 167ft / 51.0mTotal length
  • $6,540,000Total costs
  • 186,435Total average daily traffic
  • 28,843Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Hall
  • No street view available for this location

New bridges in Fort Hall, ID - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 61950-1959
  • 71960-1969
  • 51970-1979
  • 11980-1989
  • 11990-1999
  • 12010-2019
Average Bridge Daily Traffic in Fort Hall, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 55.0%Good
  • 25.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 55.0%Good
  • 10.0%Satisfactory
  • 5.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Very good
  • 35.0%Good
  • 50.0%Satisfactory
  • 5.0%Fair
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.1%Very good
  • 38.5%Good
  • 30.8%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: P403,  Location: 10 KM WEST OF FORT HALL (Lat: 43.043194,  Lng: -112.554528),  Route carried "on" structure: Federal lands road 68,  Year Built: 1974,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 60 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 180 (year 2041),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.900,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: P406,  Location: 16KM W.FT HALL IN BOTTOMS (Lat: 43.002639,  Lng: -112.600722),  Route carried "on" structure: Federal lands road 68,  Year Built: 1975,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 60 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 140 (year 2041),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.700,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: P407,  Location: 7KM W.JCT HWY 191 & RT 60 (Lat: 43.095389,  Lng: -112.505028),  Route carried "on" structure: Federal lands road 60,  Year Built: 1975,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 150 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 330 (year 2041),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.900,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: P408,  Location: 8 KM NW OF FORT HALL (Lat: 43.066750,  Lng: -112.523944),  Route carried "on" structure: Federal lands road 64,  Year Built: 1983,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 35 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 80 (year 2041),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.400,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 3.5m (11.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: P411,  Location: 13 KM SW OF BLACKFOOT (Lat: 43.143856,  Lng: -112.435472),  Route carried "on" structure: Federal lands road 59,  Year Built: 1990,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 110 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 230 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BLACKFOOT RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.600,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: P421,  Location: 4 KM EAST OF FORT HALL (Lat: 43.022056,  Lng: -112.389556),  Route carried "on" structure: Federal lands road 24,  Year Built: 1969,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 820 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 360 (year 2041),  Design Load: HS 20,  Features Intersected: MAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.000,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.2 metric tons,  Method Used To Determine Operating Rating: No rating analysis performed,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: No rating analysis performed,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: P432,  Location: 14 KM S JCT I-15 & RT 161 (Lat: 42.769222,  Lng: -112.622694),  Route carried "on" structure: Federal lands road 182,  Year Built: 1972,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 30 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 70 (year 2041),  Features Intersected: BANNOCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.300,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Total Project Cost: $37,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: P437,  Location: .4K N&.8 K W.OF 161 & I15 (Lat: 42.886472,  Lng: -112.642972),  Route carried "on" structure: ServiceFederal lands road 187,  Year Built: 1971,  Status: Open,  Structure Length: 2.54m (8.33ft),  Average Daily Traffic: 55 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 120 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: BANNOCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.800,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.8m (81.4ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 11305,  Location: 6.9 N. POCATELLO (Lat: 42.971100,  Lng: -112.425053),  Route carried "on" structure: Interstate 15,  Year Built: 1959,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 19,500 (year 2039),  Design Load: HS 20,  Features Intersected: PRIVATE RD.;MACHINE PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.675,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.7m (41.7ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1131,  Location: 6.9 N. POCATELLO (Lat: 42.971250,  Lng: -112.425375),  Route carried "on" structure: Interstate 15,  Year Built: 1959,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 19,500 (year 2039),  Design Load: HS 20,  Features Intersected: PRIVATE RD.;MACHINE PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.674,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11315,  Location: 8.2 N. POCATELLO (Lat: 42.989733,  Lng: -112.416328),  Route carried "on" structure: Interstate 15,  Year Built: 1959,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 19,500 (year 2039),  Design Load: HS 20,  Features Intersected: PRIVATE RD.;MACHINE PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 124.880,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1132,  Location: 8.2 N. POCATELLO (Lat: 42.989889,  Lng: -112.416661),  Route carried "on" structure: Interstate 15,  Year Built: 1959,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 19,500 (year 2039),  Design Load: HS 20,  Features Intersected: PRIVATE RD.;MACHINE PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 124.882,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11335,  Location: 9.8 N. POCATELLO (Lat: 43.012233,  Lng: -112.407942),  Route carried "on" structure: Interstate 15,  Year Built: 1960,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 13,000 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 19,500 (year 2039),  Design Load: HS 20,  Features Intersected: FORT HALL MAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 127.503,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,012,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,518,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 17505,  Location: 3.2 N. CHUBBUCK (Lat: 42.965944,  Lng: -112.464722),  Route carried "on" structure: US 91,  Year Built: 1925,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 5,200 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,800 (year 2039),  Design Load: H 15,  Features Intersected: TYHEE WASTEWAY CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.713,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 17515,  Location: 0.5 S. FORT HALL (Lat: 43.022083,  Lng: -112.438667),  Route carried "on" structure: US 91,  Year Built: 1925,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,700 (year 2039),  Design Load: H 15,  Features Intersected: ROSS FORK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 141.352,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1752,  Location: 5.7 N. FORT HALL (Lat: 43.110361,  Lng: -112.415806),  Route carried "on" structure: US 91,  Year Built: 1923,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,700 (year 2039),  Design Load: HS 20,  Features Intersected: GIBSON LATERAL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 151.337,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $435,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2216,  Location: 10.5 N. POCATELLO (Lat: 43.022167,  Lng: -112.408500),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 3,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,500 (year 2039),  Design Load: HS 20,  Features Intersected: I 15 NB-SB;FORT HALL IC,  Facility Carried by Structure: ROSS FORK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.425,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,815,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $2,723,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23085,  Location: 11.5 N. POCATELLO (Lat: 43.036667,  Lng: -112.408472),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: HS 20,  Features Intersected: I 15;SHEEPSKIN ROAD GS,  Facility Carried by Structure: SHEEPSKIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 181.926,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 23095,  Location: 6.9 S. BLACKFOOT (Lat: 43.104167,  Lng: -112.393139),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 250 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 375 (year 2039),  Design Load: HS 20,  Features Intersected: I 15;SAND ROAD GS,  Facility Carried by Structure: SAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 171.062,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,218,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,827,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: P04180B0402,  Location: 15KM W FT HALL IN BOTTOMS (Lat: 43.020028,  Lng: -112.603528),  Route carried "on" structure: Federal lands road 68,  Year Built: 2014,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 35 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 40 (year 2041),  Design Load: HS 20,  Features Intersected: BIG JIMMEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.700,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 8.4m (27.6ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2216,  Location: 10.5 N. POCATELLO (Lat: 43.022167,  Lng: -112.408500),  Route carried "under" structure: Interstate 15,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2018),  Truck Traffic: 16%,  Features Intersected: I 15 NB-SB;FORT HALL IC,  Facility Carried by Structure: ROSS FORK RD
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 128.591,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 23085,  Location: 11.5 N. POCATELLO (Lat: 43.036667,  Lng: -112.408472),  Route carried "under" structure: Interstate 15,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2018),  Truck Traffic: 16%,  Features Intersected: I 15;SHEEPSKIN ROAD GS,  Facility Carried by Structure: SHEEPSKIN ROAD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 130.207,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 2309,  Location: 14.0 N. POCATELLO (Lat: 43.071639,  Lng: -112.402639),  Route carried "under" structure: Interstate 15,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2018),  Truck Traffic: 16%,  Features Intersected: I 15;MACHINE PASS GS,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 134.128,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Find on map >>   Show street view

Structure Number: 23095,  Location: 6.9 S. BLACKFOOT (Lat: 43.104167,  Lng: -112.393139),  Route carried "under" structure: Interstate 15,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2018),  Truck Traffic: 16%,  Features Intersected: I 15;SAND ROAD GS,  Facility Carried by Structure: SAND ROAD
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 137.821,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.9m (48.9ft)

Discuss Fort Hall, Idaho (ID) on our hugely popular Idaho forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.