Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Freeport, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 33ft / 9.6mTotal length
  • $33,746,000Total costs
  • 415,580Total average daily traffic
  • 3,235Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Freeport
  • No street view available for this location

New bridges in Freeport, NY - historical statistics
  • New bridges - historical statistics
  • 61930-1939
  • 21950-1959
  • 51960-1969
Average Bridge Daily Traffic in Freeport, NY
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Good
  • 66.7%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 1056611,  Location: AT FREEPORT-S OF SSP (Lat: 40.684092,  Lng: -73.573106),  Route carried "on" structure: State highway 908E,  Year Built: 1935,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 42,046 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 50,013 (year 2040),  Design Load: HS 20,  Features Intersected: EAST MEADOW BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.362,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $787,000,  Roadway Improvement Cost: $461,000,  Total Project Cost: $1,248,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1059169,  Location: AT FREEPORT-S OF SSP (Lat: 40.653817,  Lng: -73.566939),  Route carried "on" structure: County highway ,  Year Built: 1934,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 40,382 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 49,056 (year 2040),  Features Intersected: 908E908E03011043, RTE 90,  Facility Carried by Structure: MERRICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.336,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.6m (80.7ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 14.8m (48.6ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Superstructure: Good,  Substructure: Very good,  Operating Rating: 64.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $4,942,000,  Roadway Improvement Cost: $2,894,000,  Total Project Cost: $7,835,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1059179,  Location: AT FREEPORT-S OF SSP (Lat: 40.658481,  Lng: -73.567922),  Route carried "on" structure: State highway 908E,  Year Built: 1938,  Year Reconstructed: 1964,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 71,723 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 85,314 (year 2040),  Design Load: H 20,  Features Intersected: 27 27 03041086, E/B, RT
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.450,  Lanes on structure: 8,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.7m (113.8ft),  Skew: 22 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 36.8m (120.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.29m (10.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $6,451,000,  Roadway Improvement Cost: $3,778,000,  Total Project Cost: $10,228,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1059189,  Location: AT FREEPORT-S OF SSP (Lat: 40.660069,  Lng: -73.568181),  Route carried "on" structure: Other road 908E,  Year Built: 1934,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 71,723 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 85,314 (year 2040),  Design Load: H 20,  Features Intersected: LONG ISLAND-MK BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.627,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.6m (107.0ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 32.5m (106.6ft),  Out-to-Out Width: 36.8m (120.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $6,367,000,  Roadway Improvement Cost: $3,728,000,  Total Project Cost: $10,095,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33002,  Location: 0.6 MI E BALDWIN (Lat: 40.651058,  Lng: -73.603050),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 19,137 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,247 (year 2040),  Features Intersected: MILBURN CREEK,  Facility Carried by Structure: MERRICK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.215,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 85.0m (278.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,737,000,  Roadway Improvement Cost: $1,603,000,  Total Project Cost: $4,340,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1059169,  Location: AT FREEPORT-S OF SSP (Lat: 40.653817,  Lng: -73.566939),  Route carried "under" structure: State highway 908E,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 31,171 (year 2002),  Features Intersected: 908E908E03011043, RTE 90,  Facility Carried by Structure: MERRICK ROAD
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 6.806,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Length of Maximum Span: 24.6m (80.7ft)

Find on map >>   Show street view

Structure Number: 1059179,  Location: AT FREEPORT-S OF SSP (Lat: 40.658481,  Lng: -73.567922),  Route carried "under" structure: State highway 27,  Year Built: 1938,  Structure Length: 0. m,  Average Daily Traffic: 92,398 (year 2000),  Features Intersected: 27 27 03041086, E/B, RT,  Facility Carried by Structure: RTE 908E
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 13.902,  Lanes on structure: 8,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 770987,  Location: 0.5 MI E OF BALDWIN (Lat: 40.656689,  Lng: -73.600883),  Route carried "under" structure: Other road ,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 1977),  Features Intersected: BROOKSIDE AVE,  Facility Carried by Structure: LIRR MONTAUK BR
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: 770988,  Location: 0.7 MI W OF FREEPORT (Lat: 40.656661,  Lng: -73.594833),  Route carried "under" structure: Other road ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2021),  Features Intersected: PENNSYLVANIA AV,  Facility Carried by Structure: LIRR MONTAUK BR
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 24.3m (79.7ft)

Find on map >>   Show street view

Structure Number: 770989,  Location: 0.5 MI W OF FREEPORT (Lat: 40.656831,  Lng: -73.590675),  Route carried "under" structure: Other road ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2021),  Features Intersected: LONG BEACH AVE,  Facility Carried by Structure: LIRR MONTAUK BR
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 77099,  Location: 0.4 MI W OF FREEPORT (Lat: 40.656942,  Lng: -73.588217),  Route carried "under" structure: Other road ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2021),  Features Intersected: BERGEN PLACE,  Facility Carried by Structure: LIRR MONTAUK BR
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 23.1m (75.8ft)

Find on map >>   Show street view

Structure Number: 770991,  Location: 0.3 MI W OF FREEPORT (Lat: 40.657017,  Lng: -73.586903),  Route carried "under" structure: Other road ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 9,000 (year 2021),  Features Intersected: OCEAN AVE,  Facility Carried by Structure: LIRR MONTAUK BR
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 770992,  Location: AT FREEPORT (Lat: 40.657356,  Lng: -73.583356),  Route carried "under" structure: County highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 11,500 (year 1977),  Features Intersected: MAIN ST,  Facility Carried by Structure: LIRR MONTAUK BR
Minimum Vertical Clearance: 4.41m (14.47ft),  Kilometerpoint: 0.000,  Lanes under structure: 12,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 30.4m (99.7ft)

Discuss Freeport, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.