Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gary, South Dakota (SD)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 79ft / 23.5mTotal length
  • $1,641,000Total costs
  • 3,976Total average daily traffic
  • 634Total average daily truck traffic
  • 5,116Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gary
  • No street view available for this location

New bridges in Gary, SD - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61950-1959
  • 11970-1979
  • 11990-1999
  • 12000-2009
Average Bridge Truck Traffic in Gary, SD
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Satisfactory
  • 87.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Satisfactory
  • 62.5%Fair
  • 25.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 37.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 60.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
  • 20.0%Poor
Find on map >>   Show street view

Structure Number: 2018716,  Location: 8.7 E JCT SD 15 (Lat: 44.747122,  Lng: -96.506608),  Route carried "on" structure: State highway 22,  Year Built: 1955,  Status: Open,  Structure Length: 2.97m (9.74ft),  Average Daily Traffic: 1,134 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,540 (year 2041),  Design Load: H 20,  Features Intersected: COBB CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 610.456,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 2019316,  Location: 9.3 E JCT SD 15 (Lat: 44.747161,  Lng: -96.494431),  Route carried "on" structure: State highway 22,  Year Built: 1955,  Status: Open,  Structure Length: 4.07m (13.35ft),  Average Daily Traffic: 1,134 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,540 (year 2041),  Design Load: H 20,  Features Intersected: COBB CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 611.406,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 20200114,  Location: 1W & 1.5N GARY (Lat: 44.813267,  Lng: -96.479397),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Posted for load,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 197 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 197 (year 2032),  Design Load: H 15,  Features Intersected: MONIGHAN CK,  Facility Carried by Structure: 486 AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.27m (14.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $500,000,  Total Project Cost: $500,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 20200163,  Location: 3.3 S & 1 W GARY (Lat: 44.742622,  Lng: -96.480267),  Route carried "on" structure: County highway ,  Year Built: 1970,  Year Reconstructed: 2001,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 135 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 150 (year 2033),  Features Intersected: CK,  Facility Carried by Structure: TWNSHP RD 486TH AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Good,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 2020913,  Location: MAIN ST OF GARY (Lat: 44.790592,  Lng: -96.461689),  Route carried "on" structure: County highway ,  Year Built: 1959,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 362 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 362 (year 2032),  Design Load: H 15,  Features Intersected: LAUGHING WATER CK,  Facility Carried by Structure: 179 STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $50,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20211127,  Location: PARLE ST. GARY (Lat: 44.795400,  Lng: -96.458117),  Route carried "on" structure: City street ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 50 (year 2032),  Features Intersected: CK,  Facility Carried by Structure: PARLE ST (GARY)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Operating Rating: 7.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $221,000 ( Estimate for 2020),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20211128,  Location: SECOND AVE. GARY (Lat: 44.793764,  Lng: -96.458814),  Route carried "on" structure: City street ,  Year Built: 1930,  Status: Posted for load,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 50 (year 2032),  Features Intersected: CK,  Facility Carried by Structure: 2ND AVE (GARY)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $370,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20211165,  Location: 11.4 E JCT SD 15 (Lat: 44.739189,  Lng: -96.457714),  Route carried "on" structure: State highway 22,  Year Built: 1954,  Status: Open,  Structure Length: 4.07m (13.35ft),  Average Daily Traffic: 874 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,187 (year 2041),  Design Load: H 20,  Features Intersected: COBB CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 614.930,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.0m (42.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 20213111,  Location: 1.9N GARY (Lat: 44.819744,  Lng: -96.451803),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 20 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 20 (year 2032),  Design Load: HS 20,  Features Intersected: MONIGHAN CK,  Facility Carried by Structure: CO RD 310 488TH AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020
Find on map >>   Show street view

Structure Number: 20213121,  Location: 0.9 N GARY (Lat: 44.803550,  Lng: -96.451736),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 20 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 20 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WEST BRANCH LA QUA PARLE,  Facility Carried by Structure: CO RD 310 488TH AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018,  Wearing Surface/Protective System: Wearing Surface: Gravel
Discuss Gary, South Dakota (SD) on our hugely popular South Dakota forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.