Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for George, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 184ft / 56.4mTotal length
  • $34,054,000Total costs
  • 73,829Total average daily traffic
  • 17,225Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for George
  • No street view available for this location

New bridges in George, WA - historical statistics
  • New bridges - historical statistics
  • 71950-1959
  • 111960-1969
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in George, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 02000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Daily Traffic in George, WA
Average Bridge Truck Traffic in George, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.5%Very good
  • 57.9%Good
  • 5.3%Satisfactory
  • 5.3%Fair
  • 10.5%Poor
  • 10.5%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.1%Very good
  • 36.8%Good
  • 26.3%Satisfactory
  • 15.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 26.3%Very good
  • 42.1%Good
  • 21.1%Satisfactory
  • 10.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 46.7%Very good
  • 46.7%Good
  • 6.7%Fair
Find on map >>   Show street view

Structure Number: 11WC025,  Location: West Canal W39.9 Station (Lat: 47.153686,  Lng: -119.853067),  Route carried "on" structure: ServiceOther road ,  Year Built: 1950,  Year Reconstructed: 2020,  Status: Posted for load,  Structure Length: 1.21m (3.97ft),  Average Daily Traffic: 40 (year 2020),  Average Future Daily Traffic: 40 (year 2040),  Design Load: H 10,  Features Intersected: WEST CANAL W39.9,  Facility Carried by Structure: MAINTENANCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Bureau of Reclamation,  Maintenance Responsibility: Private,  Approaching Roadway Width: 5.0m (16.4ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 30.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Wood or Timber
Find on map >>   Show street view

Structure Number: 11WC0251,  Location: West Canal W39.9 Station (Lat: 47.149567,  Lng: -119.853081),  Route carried "on" structure: ServiceOther road ,  Year Built: 2016,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 10 (year 2020),  Average Future Daily Traffic: 10 (year 2040),  Features Intersected: WEST CANAL W39.9,  Facility Carried by Structure: MAINTENANCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Bureau of Reclamation,  Maintenance Responsibility: Private,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Good,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11WC0252,  Location: West Canal W39.9 Station (Lat: 47.143164,  Lng: -119.853092),  Route carried "on" structure: ServiceOther road ,  Year Built: 1950,  Year Reconstructed: 2003,  Status: Posted for load,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 20 (year 2020),  Average Future Daily Traffic: 20 (year 2040),  Features Intersected: WEST CANAL W39.9,  Facility Carried by Structure: MAINTENANCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Bureau of Reclamation,  Maintenance Responsibility: Private,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Very good,  Channel: Good,  Operating Rating: 17.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Deck Structure Type: Steel plate
Find on map >>   Show street view

Structure Number: 6858A,  Location: 14.0 E JCT SR 26 (Lat: 47.102472,  Lng: -119.829611),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 6,291 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 8,228 (year 2039),  Design Load: HS 20,  Features Intersected: SR 281 SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 244.186,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 23.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 17.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,417,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $2,834,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6858B,  Location: 14.0 E JCT SR 26 (Lat: 47.102667,  Lng: -119.829722),  Route carried "on" structure: Interstate 90,  Year Built: 1962,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 6,291 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 8,228 (year 2039),  Design Load: HS 20,  Features Intersected: SR 281 SPUR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 244.186,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.4m (57.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,263,000,  Roadway Improvement Cost: $253,000,  Total Project Cost: $2,526,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7386A,  Location: 10.8 E JCT SR 26 (Lat: 47.071667,  Lng: -119.876111),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 8.75m (28.71ft),  Average Daily Traffic: 574 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 867 (year 2036),  Design Load: HS 20,  Features Intersected: I-90,  Facility Carried by Structure: BEVERLY BURKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.843,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.75m (28.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,181,000,  Roadway Improvement Cost: $436,000,  Total Project Cost: $4,362,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 7386B,  Location: 12.3 E JCT SR 26 (Lat: 47.087361,  Lng: -119.856389),  Route carried "on" structure: Interstate 90,  Year Built: 1964,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 5,408 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,073 (year 2039),  Design Load: HS 20,  Features Intersected: WEST CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 241.514,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,188,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,376,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7386C,  Location: 12.3 E JCT SR 26 (Lat: 47.087536,  Lng: -119.856494),  Route carried "on" structure: Interstate 90,  Year Built: 1964,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 5,408 (year 2019),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,073 (year 2039),  Design Load: HS 20,  Features Intersected: WEST CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 241.514,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Serious,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $872,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $1,744,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 7386D,  Location: JCT I-90 (Lat: 47.084778,  Lng: -119.861278),  Route carried "on" structure: State highway 281,  Year Built: 1964,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 4,760 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 6,226 (year 2039),  Design Load: HS 20,  Features Intersected: I-90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.97m (19.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,450,000,  Roadway Improvement Cost: $290,000,  Total Project Cost: $2,901,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7386E,  Location: 0.6 N JCT I-90 (Lat: 47.091250,  Lng: -119.858444),  Route carried "on" structure: State highway 281,  Year Built: 1964,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 4,887 (year 2019),  Truck Traffic: 25%,  Average Future Daily Traffic: 6,392 (year 2039),  Design Load: HS 20,  Features Intersected: WEST CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.982,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,007,000,  Roadway Improvement Cost: $201,000,  Total Project Cost: $2,014,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 80294,  Location: West Canal @ George (Lat: 47.086642,  Lng: -119.855511),  Route carried "on" structure: County highway 16570,  Year Built: 1950,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 687 (year 2021),  Truck Traffic: 31%,  Average Future Daily Traffic: 1,205 (year 2043),  Design Load: H 20,  Features Intersected: WEST CANAL,  Facility Carried by Structure: SO. FRONTAGE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Serious,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,020,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $2,040,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 81005,  Location: P NW 0.4 S of 5 NW (Lat: 47.150294,  Lng: -119.832497),  Route carried "on" structure: County highway 36250,  Year Built: 1952,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 376 (year 2018),  Truck Traffic: 30%,  Average Future Daily Traffic: 650 (year 2040),  Design Load: H 15,  Features Intersected: LAT W39.9E2 BLK 75,  Facility Carried by Structure: P ROAD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,216,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82037,  Location: 3 NW 0.5 East of P NW (Lat: 47.132278,  Lng: -119.821967),  Route carried "on" structure: County highway 36200,  Year Built: 1952,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 157 (year 2018),  Truck Traffic: 32%,  Average Future Daily Traffic: 250 (year 2040),  Design Load: H 15,  Features Intersected: IRRIGATION LATERAL,  Facility Carried by Structure: 3 RD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,246,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82225,  Location: 3 NW 0.03 East of SR 281 (Lat: 47.132228,  Lng: -119.853061),  Route carried "on" structure: County highway 36200,  Year Built: 1952,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 159 (year 2018),  Truck Traffic: 32%,  Average Future Daily Traffic: 350 (year 2040),  Design Load: H 15,  Features Intersected: IRRIGATION LATERAL,  Facility Carried by Structure: 3 RD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $110,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $121,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 82724,  Location: 2 NW .2 W of P-NW (Lat: 47.117739,  Lng: -119.835747),  Route carried "on" structure: County highway 31140,  Year Built: 1952,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 338 (year 2018),  Truck Traffic: 25%,  Average Future Daily Traffic: 186 (year 2040),  Design Load: H 15,  Features Intersected: IRRIGATION LATERAL,  Facility Carried by Structure: 2 RD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.13m (3.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,125,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84257,  Location: BEVERLY BURKE @ 1 NW (Lat: 47.097303,  Lng: -119.862758),  Route carried "on" structure: County highway 93000,  Year Built: 1987,  Status: Open,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 1,786 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: WEST CANAL BLK 77,  Facility Carried by Structure: BEVERLY BURKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,657,000,  Roadway Improvement Cost: $331,000,  Total Project Cost: $3,314,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86061,  Location: Q SW 1.3 South of 3 (Lat: 47.027194,  Lng: -119.855736),  Route carried "on" structure: County highway 91035,  Year Built: 1993,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 831 (year 2019),  Truck Traffic: 25%,  Average Future Daily Traffic: 980 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: WEST CANAL BLK 78,  Facility Carried by Structure: GEORGE SOUTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $670,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $1,339,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86169,  Location: Q SW .1 South of 1.5 (Lat: 47.063692,  Lng: -119.855814),  Route carried "on" structure: County highway 91035,  Year Built: 1993,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 877 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,000 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: WEST CANAL BLK 78,  Facility Carried by Structure: Q SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $670,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $1,339,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86738,  Location: 3 NW 1 West of SR 281 (Lat: 47.132175,  Lng: -119.874831),  Route carried "on" structure: County highway 31200,  Year Built: 2002,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 96 (year 2021),  Truck Traffic: 26%,  Average Future Daily Traffic: 150 (year 2043),  Design Load: HS 20,  Features Intersected: WEST CANAL,  Facility Carried by Structure: 3 RD NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,778,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $3,557,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6858A,  Location: 0.1 E JCT SR 283 (Lat: 47.102472,  Lng: -119.829611),  Route carried "under" structure: Spur State highway 281,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,244 (year 2019),  Truck Traffic: 20%,  Features Intersected: SR 281 SPUR,  Facility Carried by Structure: I-90
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 6.985,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 6858B,  Location: 0.1 E JCR SR 283 (Lat: 47.102667,  Lng: -119.829722),  Route carried "under" structure: Spur State highway 281,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,244 (year 2019),  Truck Traffic: 20%,  Features Intersected: SR 281 SPUR,  Facility Carried by Structure: I-90
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 6.952,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 7386A,  Location: 10.8 E JCT SR 26 (Lat: 47.071667,  Lng: -119.876111),  Route carried "under" structure: Interstate 90,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 15,529 (year 2019),  Truck Traffic: 24%,  Features Intersected: I-90,  Facility Carried by Structure: BEVERLY BURKE RD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 239.229,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 7386D,  Location: 12.0 E JCT SR 26 (Lat: 47.084778,  Lng: -119.861278),  Route carried "under" structure: Interstate 90,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,816 (year 2019),  Truck Traffic: 24%,  Features Intersected: I-90,  Facility Carried by Structure: SR 281
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 241.048,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Discuss George, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.