Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gig Harbor, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 187ft / 56.5mTotal length
  • $38,178,000Total costs
  • 423,254Total average daily traffic
  • 19,216Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gig Harbor
  • No street view available for this location

New bridges in Gig Harbor, WA - historical statistics
  • New bridges - historical statistics
  • 21940-1949
  • 91970-1979
  • 21980-1989
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Gig Harbor, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Very good
  • 70.0%Good
  • 10.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 60.0%Good
  • 20.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Very good
  • 60.0%Good
  • 10.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 33.3%Good
Find on map >>   Show street view

Structure Number: 3639A,  Location: 12.8 N JCT I-5 (Lat: 47.330250,  Lng: -122.598778),  Route carried "on" structure: State highway 16,  Year Built: 1949,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 39,307 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 56,916 (year 2039),  Design Load: HS 20,  Features Intersected: ROSEDALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.535,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,304,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $2,608,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8694A,  Location: 12.8 N JCT I-5 (Lat: 47.330117,  Lng: -122.599028),  Route carried "on" structure: State highway 16,  Year Built: 1970,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 39,307 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 56,916 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: ROSEDALE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.535,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,097,000,  Roadway Improvement Cost: $419,000,  Total Project Cost: $4,194,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9245A,  Location: 10.7 N JCT I-5 (Lat: 47.305111,  Lng: -122.576778),  Route carried "on" structure: County highway ,  Year Built: 1972,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 6.31m (20.70ft),  Average Daily Traffic: 22,899 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 37,738 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 16,  Facility Carried by Structure: OLYMPIC DR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 30.8m (101.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.31m (20.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,856,000,  Roadway Improvement Cost: $571,000,  Total Project Cost: $5,713,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9380A,  Location: 12.0 N JCT I-5 (Lat: 47.320722,  Lng: -122.590611),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 15,003 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,535 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: SR 16,  Facility Carried by Structure: WOLLOCHET DR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,505,000,  Roadway Improvement Cost: $301,000,  Total Project Cost: $3,010,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10280A,  Location: 0.3 N JCT SR 302 (Lat: 47.370992,  Lng: -122.618881),  Route carried "on" structure: State highway 16,  Year Built: 1977,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 25,011 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 36,215 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: N-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.347,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,108,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $4,217,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10280B,  Location: 0.3 N JCT SR 302 (Lat: 47.371297,  Lng: -122.619169),  Route carried "on" structure: State highway 16,  Year Built: 1977,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 25,011 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 36,215 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: N-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.379,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.6m (97.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.34m (20.80ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,747,000,  Roadway Improvement Cost: $349,000,  Total Project Cost: $3,494,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12617A,  Location: 14.9 N JCT I-5 (Lat: 47.358611,  Lng: -122.615028),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 6.95m (22.80ft),  Average Daily Traffic: 16,262 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 26,800 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 16,  Facility Carried by Structure: BURNHAM DR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.95m (22.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,326,000,  Roadway Improvement Cost: $465,000,  Total Project Cost: $4,651,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 79848,  Location: 3.0 W JCT SR16 (Lat: 47.339389,  Lng: -122.652675),  Route carried "on" structure: County highway 27670,  Year Built: 1941,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 900 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,500 (year 2041),  Design Load: H 15,  Features Intersected: LAY INLET / NELYAL CREEK,  Facility Carried by Structure: 86 AV NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.350,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $699,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $1,398,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 86498,  Location: 5.5 W JCT SR 16 (Lat: 47.322111,  Lng: -122.660281),  Route carried "on" structure: County highway 27010,  Year Built: 2000,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 2,900 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,800 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: HENDERSON BAY INLET,  Facility Carried by Structure: KOPACHUCK DR NW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,542,000,  Roadway Improvement Cost: $708,000,  Total Project Cost: $7,083,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 88655,  Location: 0.05 NE JCT HARBORVIEW DR (Lat: 47.337500,  Lng: -122.593611),  Route carried "on" structure: City street 3327,  Year Built: 2013,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 7,270 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,360 (year 2037),  Design Load: HL 93,  Features Intersected: DONKEY CREEK,  Facility Carried by Structure: N HARBORVIEW DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 4.4m (14.4ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $905,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,810,000 ( Estimate for 2020),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9245A,  Location: 10.7 N JCT I-5 (Lat: 47.305111,  Lng: -122.576778),  Route carried "under" structure: State highway 16,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 63,391 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 16,  Facility Carried by Structure: OLYMPIC DR NW
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 17.284,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 9380A,  Location: 12.0 N JCT I-5 (Lat: 47.320722,  Lng: -122.590611),  Route carried "under" structure: State highway 16,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 79,871 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 16,  Facility Carried by Structure: WOLLOCHET DR NW
Minimum Vertical Clearance: 6.43m (21.10ft),  Kilometerpoint: 19.328,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 10280A,  Location: 0.3 N JCT SR 302 (Lat: 47.370992,  Lng: -122.618881),  Route carried "under" structure: Ramp State highway 16,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 11,344 (year 2019),  Truck Traffic: 6%,  Features Intersected: N-W RAMP
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 27.150,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 10280B,  Location: 0.3 N JCT SR 302 (Lat: 47.371297,  Lng: -122.619169),  Route carried "under" structure: Ramp State highway 16,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 11,344 (year 2019),  Truck Traffic: 6%,  Features Intersected: N-W RAMP
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 27.117,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 12617A,  Location: 14.9 N JCT I-5 (Lat: 47.358611,  Lng: -122.615028),  Route carried "under" structure: State highway 16,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 58,109 (year 2019),  Truck Traffic: 5%,  Features Intersected: SR 16,  Facility Carried by Structure: BURNHAM DR NW
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 23.915,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 88347,  Location: 0.07 W JCT 26TH AV NW (Lat: 47.276169,  Lng: -122.575556),  Route carried "under" structure: County highway 92720,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 5,325 (year 2020),  Truck Traffic: 5%,  Features Intersected: TACOMA NARROWS AIRPORT,  Facility Carried by Structure: STONE DR NW
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.001,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 19.2m (63.0ft)

Discuss Gig Harbor, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.