Bridge Statistics for Glasgow, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 364ft / 111mTotal length
  • $5,805,000Total costs
  • 141,956Total average daily traffic
  • 27,843Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Glasgow
  • No street view available for this location

New bridges in Glasgow, VA - historical statistics
  • New bridges - historical statistics
  • 91930-1939
  • 11940-1949
  • 121960-1969
  • 11970-1979
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Glasgow, VA
Average Bridge Truck Traffic in Glasgow, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 27.8%Good
  • 38.9%Satisfactory
  • 22.2%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.6%Very good
  • 27.8%Good
  • 44.4%Satisfactory
  • 22.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 21.4%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 15281,  Location: 4.66 TO 11 & 8.14 TO 60 (Lat: 37.668889,  Lng: -79.506708),  Route carried "on" structure: Interstate 81,  Year Built: 1963,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 17,166 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 24,032 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 11 & RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.245,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,975,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $2,040,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 15305,  Location: 4.73 TO 11 & 8.07 TO 60 (Lat: 37.670906,  Lng: -79.506414),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 5.87m (19.26ft),  Average Daily Traffic: 16,896 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 23,654 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RELOC RTE 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.840,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 15307,  Location: 2.85 TO 11 & 5.29 TO 60 (Lat: 37.697983,  Lng: -79.470172),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 4.84m (15.88ft),  Average Daily Traffic: 17,166 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 24,032 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 679
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 295.847,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.85m (15.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $115,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $150,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 15325,  Location: 8.07 TO 60 & 0.07 TO 11 (Lat: 37.669681,  Lng: -79.505247),  Route carried "on" structure: Interstate 81,  Year Built: 1964,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 530 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 743 (year 2040),  Design Load: HS 20,  Features Intersected: & RMP O TRIB POAGUE RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 291.411,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 1.9m (6.2ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $75,000
Find on map >>   Show street view

Structure Number: 15343,  Location: .03 TO 773 & 0.02 TO 1304 (Lat: 37.622919,  Lng: -79.500792),  Route carried "on" structure: State highway 130,  Year Built: 1930,  Status: Open,  Structure Length: 4.19m (13.75ft),  Average Daily Traffic: 2,985 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,717 (year 2040),  Design Load: H 15,  Features Intersected: N&W RWY @ NATURAL-BR-STA,  Facility Carried by Structure: WERT FAULKNER Hwy
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.560,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.21m (13.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $30,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $55,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 15344,  Location: .23 TO 1304 & .02 TO 772 (Lat: 37.622456,  Lng: -79.505706),  Route carried "on" structure: State highway 130,  Year Built: 1930,  Status: Open,  Structure Length: 4.95m (16.24ft),  Average Daily Traffic: 2,985 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,717 (year 2040),  Design Load: H 15,  Features Intersected: CRAWFORD CREEK & RTE 688,  Facility Carried by Structure: WERT FAULKNER HW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.071,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.9m (32.5ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 33.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.97m (16.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $850,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $1,030,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 15401,  Location: .01 TO 700N & .01 TO 700S (Lat: 37.685875,  Lng: -79.434053),  Route carried "on" structure: County highway 608,  Year Built: 1939,  Status: Posted for load,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 776 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 928 (year 2040),  Design Load: H 15,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: FORGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.484,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $320,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 15402,  Location: 0.30 TO 680 & 0.60 TO 679 (Lat: 37.680261,  Lng: -79.441892),  Route carried "on" structure: County highway 608,  Year Built: 1948,  Status: Posted for load,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 585 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 689 (year 2040),  Design Load: H 15,  Features Intersected: CHILDRESS CREEK,  Facility Carried by Structure: FORGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.511,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $60,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 15592,  Location: 0.30 TO 680 & 0.30 TO 608 (Lat: 37.679481,  Lng: -79.453675),  Route carried "on" structure: County highway 679,  Year Built: 1932,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 385 (year 2020),  Average Future Daily Traffic: 413 (year 2040),  Features Intersected: POAGUE RUN,  Facility Carried by Structure: LONE JACK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.889,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $175,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15597,  Location: 0.20 TO 11 & 0.05 TO F233 (Lat: 37.686767,  Lng: -79.486458),  Route carried "on" structure: County highway 680,  Year Built: 1966,  Status: Open,  Structure Length: 4.87m (15.98ft),  Average Daily Traffic: 519 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 571 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I 81 NBL,  Facility Carried by Structure: FALLING SPRINGS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.1m (62.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $260,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15599,  Location: 0.15 TO 11 & 0.10 TO F233 (Lat: 37.687317,  Lng: -79.487194),  Route carried "on" structure: County highway 680,  Year Built: 1966,  Status: Open,  Structure Length: 5.02m (16.47ft),  Average Daily Traffic: 519 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 571 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I 81 SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.1m (62.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.03m (16.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $270,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $290,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15633,  Location: 0.00 TO 698 & 0.80 TO 795 (Lat: 37.697000,  Lng: -79.443242),  Route carried "on" structure: County highway 700,  Year Built: 1932,  Status: Posted for load,  Structure Length: 2.36m (7.74ft),  Average Daily Traffic: 84 (year 2013),  Average Future Daily Traffic: 95 (year 2040),  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: BUNKER HILL MILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.648,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.4m (11.2ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 10.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 7.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $850,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15691,  Location: 0.33 TO 782 & 0.07 TO 793 (Lat: 37.615308,  Lng: -79.498578),  Route carried "on" structure: County highway 759,  Year Built: 1970,  Status: Open,  Structure Length: 20.48m (67.19ft),  Average Daily Traffic: 1,215 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,336 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: JAMES RIVER & CSX RWY,  Facility Carried by Structure: ARONLD'S VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.245,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: August 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $65,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 15692,  Location: 0.90 TO 782 & 0.57 TO 799 (Lat: 37.601131,  Lng: -79.504261),  Route carried "on" structure: County highway 759,  Year Built: 1938,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 1,215 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,336 (year 2040),  Design Load: H 15,  Features Intersected: ELK CREEK,  Facility Carried by Structure: ARNOLD'S VALLEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.496,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.32m (7.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $120,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $180,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15712,  Location: 0.70 TO 790 & 0.10 TO 759 (Lat: 37.592072,  Lng: -79.510236),  Route carried "on" structure: County highway 781,  Year Built: 1932,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 385 (year 2013),  Average Future Daily Traffic: 437 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ELK CREEK,  Facility Carried by Structure: BACK RUN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 15715,  Location: 0.15 TO 759 & 1.45 TO END (Lat: 37.612089,  Lng: -79.497567),  Route carried "on" structure: County highway 782,  Year Built: 1965,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 709 (year 2013),  Average Future Daily Traffic: 722 (year 2040),  Features Intersected: ELK CREEK,  Facility Carried by Structure: JAMES RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $100,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 24933,  Location: 1.28 TO 130 & 0.17 TO 663 (Lat: 37.647781,  Lng: -79.429442),  Route carried "on" structure: US 501,  Year Built: 1995,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,714 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,822 (year 2040),  Design Load: HS 20,  Features Intersected: BATTLE RUN,  Facility Carried by Structure: GLASGOW HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.364,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 26937,  Location: 0.00 TO 795 & 0.03 TO 608 (Lat: 37.686206,  Lng: -79.434489),  Route carried "on" structure: County highway 700,  Year Built: 2001,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 144 (year 2017),  Average Future Daily Traffic: 152 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: FALLING SPRING RUN,  Facility Carried by Structure: BUNKER HILL MILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.381,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 27495,  Location: 0.18 TO 501 - AT ECL GLGW (Lat: 37.631561,  Lng: -79.444414),  Route carried "on" structure: State highway 130,  Year Built: 2010,  Status: Open,  Structure Length: 33.22m (108.99ft),  Average Daily Traffic: 2,915 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,206 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MAURY RIVER,  Facility Carried by Structure: WERT FAULKNER HWY
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 101.389,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 72.2m (236.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 80813000003204,  Location: 1.3 MI. E. ST RTE 781 (Lat: 37.569533,  Lng: -79.461169),  Route carried "on" structure: Federal lands road 35,  Year Built: 1935,  Status: Posted for load,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 10 (year 1997),  Average Future Daily Traffic: 20 (year 2010),  Design Load: H 15,  Features Intersected: EAST FORK ELK CREEK,  Facility Carried by Structure: PETITES GAP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.080,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.6m (41.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 21.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 16.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $5,000,  Total Project Cost: $5,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15281,  Location: 4.66 TO 11 & 8.14 TO 60 (Lat: 37.668889,  Lng: -79.506708),  Route carried "under" structure: US 11,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2018),  Truck Traffic: 3%,  Features Intersected: RTE 11 & RAMP B,  Facility Carried by Structure: NBL ROUTE 0081
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 311.325,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 15305,  Location: 4.73 TO 11 & 8.07 TO 60 (Lat: 37.670906,  Lng: -79.506414),  Route carried "under" structure: US 11,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 1,763 (year 2008),  Truck Traffic: 3%,  Features Intersected: RELOC RTE 11,  Facility Carried by Structure: SBL ROUTE 0081
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 311.551,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 15307,  Location: 2.85 TO 11 & 5.29 TO 60 (Lat: 37.697983,  Lng: -79.470172),  Route carried "under" structure: County highway 679,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 80 (year 2018),  Features Intersected: RTE 679,  Facility Carried by Structure: NBL ROUTE 0081
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 9.751,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>   Show street view

Structure Number: 15344,  Location: .23 TO 1304 & .02 TO 772 (Lat: 37.622456,  Lng: -79.505706),  Route carried "under" structure: County highway 688,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 160 (year 2004),  Features Intersected: CRAWFORD CREEK & RTE 688,  Facility Carried by Structure: WERT FAULKNER HW
Minimum Vertical Clearance: 8.83m (28.97ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 9.9m (32.5ft)

Find on map >>   Show street view

Structure Number: 15597,  Location: 0.20 TO 11 & 0.05 TO F233 (Lat: 37.686767,  Lng: -79.486458),  Route carried "under" structure: Interstate 81,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 33,025 (year 2008),  Truck Traffic: 16%,  Features Intersected: RTE I 81 NBL,  Facility Carried by Structure: FALLING SPRINGS RD
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 293.932,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.1m (62.7ft)

Find on map >>   Show street view

Structure Number: 15599,  Location: 0.15 TO 11 & 0.10 TO F233 (Lat: 37.687317,  Lng: -79.487194),  Route carried "under" structure: Interstate 81,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 33,025 (year 2008),  Truck Traffic: 16%,  Features Intersected: RTE I 81 SBL,  Facility Carried by Structure: ROUTE 0680
Minimum Vertical Clearance: 5.44m (17.85ft),  Kilometerpoint: 293.932,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.1m (62.7ft)

Discuss Glasgow, Virginia (VA) on our hugely popular Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.