Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Golden Gate, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 295ft / 89.7mTotal length
  • 350,561Total average daily traffic
  • 26,676Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Golden Gate
  • No street view available for this location

New bridges in Golden Gate, FL - historical statistics
  • New bridges - historical statistics
  • 111960-1969
  • 41970-1979
  • 71980-1989
  • 21990-1999
  • 12000-2009
  • 42010-2019
Reconstructed bridges in Golden Gate, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Golden Gate, FL
Average Bridge Truck Traffic in Golden Gate, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.2%Excellent
  • 8.3%Very good
  • 66.7%Good
  • 12.5%Satisfactory
  • 4.2%Poor
  • 4.2%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.2%Excellent
  • 12.5%Very good
  • 62.5%Good
  • 8.3%Satisfactory
  • 4.2%Fair
  • 4.2%Poor
  • 4.2%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 87.5%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.4%Very good
  • 73.9%Good
  • 8.7%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 30038,  Location: 7.2 MI EAST OF I-75 (Lat: 26.275175,  Lng: -81.625567),  Route carried "on" structure: County highway 846,  Year Built: 1966,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 21,523 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 22,599 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.611,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 26.3m (86.3ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 30123,  Location: 1.68MI W OF CR-951 (Lat: 26.176872,  Lng: -81.711114),  Route carried "on" structure: County highway 886,  Year Built: 1971,  Status: Open,  Structure Length: 3.06m (10.04ft),  Average Daily Traffic: 10,000 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,500 (year 2041),  Design Load: HS 20,  Features Intersected: SANTA BARBARA CNL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.691,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 14.4m (47.2ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 15.1m (49.5ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Good,  Channel: Very good,  Operating Rating: 35.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Other Special Inspection Date: September 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 30195,  Location: 1.1mi Wof Toll Plz MM93.2 (Lat: 26.160522,  Lng: -81.686583),  Route carried "on" structure: Interstate 75,  Year Built: 1984,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 13,202 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 22,905 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SR-951
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.130,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 30196,  Location: 1.1mi W/O Toll Pl MM101.3 (Lat: 26.160194,  Lng: -81.686611),  Route carried "on" structure: Interstate 75,  Year Built: 1984,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 13,202 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 22,905 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: SR-951
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.119,  Lanes on structure: 2,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 60.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 30205,  Location: 4.0MI SOUTH OF CR 896 (Lat: 26.163806,  Lng: -81.718722),  Route carried "on" structure: City street ,  Year Built: 1984,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 15.91m (52.20ft),  Average Daily Traffic: 38,500 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 66,798 (year 2041),  Design Load: HS 20,  Features Intersected: I-75 (SR 93),  Facility Carried by Structure: SANTA BARBARA BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.980,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 26.3m (86.3ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 26.3m (86.3ft),  Out-to-Out Width: 37.1m (121.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 30237,  Location: 0.6MI W OF EVERGLADES BLV (Lat: 26.141639,  Lng: -81.555306),  Route carried "on" structure: State lands road ,  Year Built: 1990,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 50%,  Average Future Daily Traffic: 24 (year 2041),  Design Load: HS 20,  Features Intersected: GOLDEN GATE MAIN CANAL,  Facility Carried by Structure: 52ND AVE SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 34011,  Location: 1.0MI SOUTH OF CR-886 (Lat: 26.172153,  Lng: -81.701975),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 580 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 725 (year 2041),  Design Load: HS 20,  Features Intersected: TROPICANA CANAL,  Facility Carried by Structure: TROPICANA BLVD. NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 50.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Other Special Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34012,  Location: SW 25TH AVE AT CR-951 (Lat: 26.183292,  Lng: -81.686808),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 1,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,839 (year 2040),  Features Intersected: CR-951 CANAL,  Facility Carried by Structure: SW 25TH AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.5m (21.3ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34014,  Location: 1MILE WEST OF CR-951 (Lat: 26.199389,  Lng: -81.703472),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.97m (6.46ft),  Average Daily Traffic: 4,200 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,450 (year 2040),  Features Intersected: GOLDEN GATE CANAL,  Facility Carried by Structure: GREEN BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.587,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34017,  Location: 1MI SOUTH OF CR-886 (Lat: 26.172175,  Lng: -81.702111),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 580 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 725 (year 2040),  Design Load: HS 20,  Features Intersected: TROPICANA CANAL,  Facility Carried by Structure: TROPICANA BLVD. SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34019,  Location: 0.5MI E OF 53RD ST SW (Lat: 26.169819,  Lng: -81.705233),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 570 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 713 (year 2040),  Design Load: HS 20,  Features Intersected: SHELL CANAL,  Facility Carried by Structure: 32ND AVE. SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34032,  Location: 1.2 MI N of GLDN GT BLVD. (Lat: 26.246256,  Lng: -81.606889),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 1,500 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2041),  Features Intersected: CYPRESS CANAL,  Facility Carried by Structure: WILSON BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.814,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Underwater Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34042,  Location: 1MI W OF EVERGLADES BLVD (Lat: 26.263208,  Lng: -81.561417),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 3.82m (12.53ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 360 (year 2041),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL,  Facility Carried by Structure: 18th AVENUE NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Underwater Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34044,  Location: 1 MI E OF EVERGLADES BLVD (Lat: 26.263583,  Lng: -81.528769),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 3.15m (10.33ft),  Average Daily Traffic: 1,750 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,100 (year 2041),  Design Load: HS 20,  Features Intersected: GOLDEN GATE DRAIN CANAL,  Facility Carried by Structure: 18TH AVE. NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34048,  Location: 1MI W OF EVERGLADES BLVD. (Lat: 26.277850,  Lng: -81.561636),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 11,205 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,765 (year 2041),  Design Load: HS 20,  Features Intersected: GOLDEN GATE MAIN CANAL,  Facility Carried by Structure: RANDALL BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.808,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34052,  Location: 1MI E OF EVERGLADES BLD (Lat: 26.310858,  Lng: -81.529481),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 201 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 241 (year 2041),  Design Load: HS 20,  Features Intersected: FAKA UNION CANAL,  Facility Carried by Structure: 43RD AVE. NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.6m (18.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Underwater Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34054,  Location: 1 MI E OF Everglades Blvd (Lat: 26.334514,  Lng: -81.529756),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 60 (year 2021),  Truck Traffic: 40%,  Average Future Daily Traffic: 75 (year 2041),  Design Load: HS 20,  Features Intersected: CIA DRAIN CANAL,  Facility Carried by Structure: 56TH AVE NE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 34072,  Location: 1.1MI S OF GOLDEN GATE BL (Lat: 26.213939,  Lng: -81.632697),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 4.13m (13.55ft),  Average Daily Traffic: 700 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 875 (year 2041),  Features Intersected: GOLDEN GATE MAIN CANAL,  Facility Carried by Structure: 13TH STREET SW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.385,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: January 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 34102,  Location: 0.2MI E of SANTA BARBARA (Lat: 26.182847,  Lng: -81.716322),  Route carried "on" structure: County highway ,  Year Built: 1972,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 1,440 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,800 (year 2040),  Design Load: HS 20,  Features Intersected: CORONADO CANAL,  Facility Carried by Structure: CORONADO PKWY EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.4m (24.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.0m (29.5ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.0m (3.3ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34103,  Location: 0.2MI E OF SANTA BARBARA (Lat: 26.182967,  Lng: -81.716333),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 1,340 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,800 (year 2040),  Design Load: HS 20,  Features Intersected: CORONADO CANAL,  Facility Carried by Structure: CORONADO PKWY WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.8m (22.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.0m (29.5ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34107,  Location: 0.4MI E OF SUNSHINE BLVD (Lat: 26.191622,  Lng: -81.696558),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 1.99m (6.53ft),  Average Daily Traffic: 660 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 825 (year 2040),  Design Load: HS 20,  Features Intersected: SUNSHINE CANAL,  Facility Carried by Structure: SUNSET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 34131,  Location: 0.2MI S OF GREEN BLVD. (Lat: 26.197303,  Lng: -81.719314),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,250 (year 2040),  Design Load: HS 20,  Features Intersected: GREEN CANAL,  Facility Carried by Structure: SANTA BARBARA NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.764,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.0m (26.2ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Inventory Rating: 65.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3418,  Location: 50FT E/O COLLIER BLVD (Lat: 26.199525,  Lng: -81.686944),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 10,300 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,875 (year 2041),  Design Load: HL 93,  Features Intersected: DRAINAGE CANAL,  Facility Carried by Structure: GREEN BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 30.4m (99.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 72.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 65.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Underwater Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 34804,  Location: 7.9 MI E/O CR-591 (Lat: 26.230400,  Lng: -81.560942),  Route carried "on" structure: County highway ,  Year Built: 2013,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 20,628 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 30,504 (year 2041),  Design Load: HL 93,  Features Intersected: MILLER CANAL,  Facility Carried by Structure: GOLDEN GATE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.2m (33.5ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 29.5m (96.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 34828,  Location: 2.0 MI E/O CR-951 (Lat: 26.212728,  Lng: -81.655344),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 3,600 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,500 (year 2040),  Design Load: HL 93,  Features Intersected: GOLDEN GATE MAIN CANAL,  Facility Carried by Structure: WHITE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3483,  Location: 1.0 MI EAST OF CR-951 (Lat: 26.212500,  Lng: -81.670833),  Route carried "on" structure: County highway 951,  Year Built: 2018,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 27,500 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 34,375 (year 2041),  Design Load: HL 93,  Features Intersected: CYPRESS CANAL,  Facility Carried by Structure: WHITE BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 64.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Underwater Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 30195,  Location: 1.1mi Wof Toll Plz MM93.2 (Lat: 26.160522,  Lng: -81.686583),  Route carried "under" structure: State highway 951,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 58,000 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR-951,  Facility Carried by Structure: I-75 NB (SR-93)
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 26.705,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 30196,  Location: 1.1mi W/O Toll Pl MM101.3 (Lat: 26.160194,  Lng: -81.686611),  Route carried "under" structure: State highway 951,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 58,000 (year 2021),  Truck Traffic: 8%,  Features Intersected: SR-951,  Facility Carried by Structure: I-75 SB (SR-93)
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 26.667,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 30205,  Location: 4.0MI SOUTH OF CR 896 (Lat: 26.163806,  Lng: -81.718722),  Route carried "under" structure: Interstate 75,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 2021),  Truck Traffic: 12%,  Features Intersected: I-75 (SR 93),  Facility Carried by Structure: SANTA BARBARA BLVD
Minimum Vertical Clearance: 18.47m (60.60ft),  Kilometerpoint: 84.413,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Golden Gate, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.