Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Greenfield, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 18Number of bridges
  • 131ft / 40.0mTotal length
  • $28,000Total costs
  • 8,250Total average daily traffic
  • 1,201Total average daily truck traffic
  • 9,025Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greenfield
  • No street view available for this location

New bridges in Greenfield, IL - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 11920-1929
  • 11930-1939
  • 11970-1979
  • 31980-1989
  • 31990-1999
  • 42000-2009
  • 32010-2019
Average Bridge Truck Traffic in Greenfield, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 50.0%Good
  • 27.8%Satisfactory
  • 5.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 44.4%Good
  • 27.8%Satisfactory
  • 5.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 44.4%Very good
  • 11.1%Good
  • 38.9%Satisfactory
  • 5.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 55.6%Very good
  • 11.1%Good
  • 22.2%Satisfactory
  • 5.6%Fair
  • 5.6%Serious
Find on map >>   Show street view

Structure Number: 310025,  Location: 8.8 M E CARROLLTON (Lat: 39.305589,  Lng: -90.231600),  Route carried "on" structure: State highway 108,  Year Built: 1928,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,050 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,250 (year 2032),  Features Intersected: MID TAYLOR CREEK BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.8m (25.6ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 310028,  Location: 0.5 M E JCT IL 267 (Lat: 39.305600,  Lng: -90.200144),  Route carried "on" structure: State highway 108,  Year Built: 1930,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 800 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 950 (year 2032),  Design Load: HS 20,  Features Intersected: TAYLOR CREEK
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 36.097,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Other Special Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 310042,  Location: 9.4 M E CARROLTON (Lat: 39.305550,  Lng: -90.221206),  Route carried "on" structure: State highway 108,  Year Built: 2009,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 1,050 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,250 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: EAST TAYLOR CREEK BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.278,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 63.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 310044,  Location: 3.5 M N GREENFIELD (Lat: 39.404486,  Lng: -90.212450),  Route carried "on" structure: State highway 267,  Year Built: 2011,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 2,200 (year 2021),  Truck Traffic: 22%,  Average Future Daily Traffic: 2,400 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: BEAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.610,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 310045,  Location: 8.5 M E CARROLTON (Lat: 39.305572,  Lng: -90.240892),  Route carried "on" structure: State highway 108,  Year Built: 2009,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 1,050 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,250 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WEST TAYLOR CREEK BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.572,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 313117,  Location: 3.6 MI SW GREENFIELD (Lat: 39.318986,  Lng: -90.264364),  Route carried "on" structure: County highway ,  Year Built: 1901,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 100 (year 2017),  Truck Traffic: 29%,  Average Future Daily Traffic: 100 (year 2032),  Features Intersected: STREAM,  Facility Carried by Structure: TR 258
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Serious,  Operating Rating: 11.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 6.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $3,000,  Total Project Cost: $28,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 313133,  Location: 3.6 M N GREENFIELD (Lat: 39.398283,  Lng: -90.202972),  Route carried "on" structure: County highway ,  Year Built: 1915,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 25 (year 2017),  Truck Traffic: 20%,  Average Future Daily Traffic: 25 (year 2032),  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TR 300
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.129,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 313138,  Location: GREENFIELD (Lat: 39.345097,  Lng: -90.205667),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 775 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 450 (year 2032),  Design Load: HS 15,  Features Intersected: RUBICON CREEK,  Facility Carried by Structure: MSS 1030
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 315037,  Location: 2.4 MI SE GREENFIELD (Lat: 39.320239,  Lng: -90.185697),  Route carried "on" structure: County highway ,  Year Built: 1982,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 175 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 325 (year 2032),  Design Load: HS 20,  Features Intersected: TAYLOR CREEK,  Facility Carried by Structure: TR-217
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315039,  Location: 4 M NW GREENFIELD (Lat: 39.400964,  Lng: -90.235769),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 125 (year 2017),  Truck Traffic: 21%,  Average Future Daily Traffic: 125 (year 2032),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TR-131
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.803,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315071,  Location: 2 MI. S. GREENFIELD (Lat: 39.320033,  Lng: -90.242411),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 150 (year 2017),  Truck Traffic: 17%,  Average Future Daily Traffic: 50 (year 2032),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: TR 217
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315077,  Location: 2.8 MI SW GREENFIELD (Lat: 39.320231,  Lng: -90.247661),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 75 (year 2017),  Truck Traffic: 20%,  Average Future Daily Traffic: 100 (year 2032),  Design Load: HS 20,  Features Intersected: STREAM,  Facility Carried by Structure: TR 217
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.173,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315091,  Location: 1.5MI W. OF FAYETTE (Lat: 39.321711,  Lng: -90.181756),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 3.16m (10.37ft),  Average Daily Traffic: 50 (year 2017),  Truck Traffic: 14%,  Average Future Daily Traffic: 50 (year 2032),  Design Load: HS 20,  Features Intersected: TAYLOR CREEK,  Facility Carried by Structure: TR 314
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.122,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315092,  Location: 3 MI W. GREENFIELD (Lat: 39.341831,  Lng: -90.260642),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 50 (year 2017),  Truck Traffic: 20%,  Average Future Daily Traffic: 25 (year 2032),  Design Load: HS 20,  Features Intersected: TRIB. TO TAYLOR CR.,  Facility Carried by Structure: TR 278
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.0m (49.2ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315225,  Location: 1 MI N GREENFIELD (Lat: 39.360300,  Lng: -90.206283),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 125 (year 2017),  Truck Traffic: 11%,  Average Future Daily Traffic: 100 (year 2032),  Design Load: HS 20,  Features Intersected: RUBICON CREEK,  Facility Carried by Structure: TR 183
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315235,  Location: 2.5 E GREENFIELD (Lat: 39.346272,  Lng: -90.159372),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 2.79m (9.15ft),  Average Daily Traffic: 225 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 200 (year 2032),  Design Load: HS 20,  Features Intersected: TAYLOR CREEK,  Facility Carried by Structure: TR 201
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315251,  Location: 2.1M SE GREENFIELD (Lat: 39.320147,  Lng: -90.199450),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 175 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 325 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RUBICON CREEK,  Facility Carried by Structure: TR 217
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.293,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported by rating factor (RF) using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 315259,  Location: 1.8 Mi NE Greenfield (Lat: 39.366456,  Lng: -90.188383),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 50 (year 2017),  Truck Traffic: 16%,  Average Future Daily Traffic: 50 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: Rubicon Creek,  Facility Carried by Structure: TR 302
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.543,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.9m (68.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels
Discuss Greenfield, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.