Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Greenleaf, Idaho (ID)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 98ft / 30.4mTotal length
  • $2,874,000Total costs
  • 9,290Total average daily traffic
  • 860Total average daily truck traffic
  • 13,935Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greenleaf
  • No street view available for this location

New bridges in Greenleaf, ID - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 41950-1959
  • 31960-1969
  • 11980-1989
  • 111990-1999
Reconstructed bridges in Greenleaf, ID - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 21970-1979
Average Bridge Truck Traffic in Greenleaf, ID
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 50.0%Good
  • 45.0%Satisfactory
  • 5.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.0%Very good
  • 30.0%Good
  • 55.0%Satisfactory
  • 5.0%Fair
  • 5.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.0%Very good
  • 55.0%Good
  • 30.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.0%Excellent
  • 25.0%Very good
  • 70.0%Good
Find on map >>   Show street view

Structure Number: 19681,  Location: 7.9 E. HOMEDALE (Lat: 43.617639,  Lng: -116.776972),  Route carried "on" structure: County highway 3724,  Year Built: 1991,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 2,300 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,450 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE LOW LINE CNL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.838,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 197,  Location: 3.0 S. NOTUS (Lat: 43.681778,  Lng: -116.802861),  Route carried "on" structure: County highway 3740,  Year Built: 1940,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,400 (year 2039),  Design Load: H 15,  Features Intersected: RIVERSIDE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.373,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $95,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26746,  Location: 3.0 S. 5.0 E. WILDER (Lat: 43.633139,  Lng: -116.812611),  Route carried "on" structure: County highway 3717,  Year Built: 1995,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 1,900 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,850 (year 2039),  Design Load: HS 20,  Features Intersected: LOWLINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.026,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2679,  Location: 5.2 N. 1.5 E. MARSING (Lat: 43.621194,  Lng: -116.782639),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 1,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,500 (year 2039),  Design Load: H 15,  Features Intersected: GOLDEN GATE LOW LINE CNL,  Facility Carried by Structure: PRIDE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.562,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.14m (10.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $646,000,  Roadway Improvement Cost: $65,000,  Total Project Cost: $969,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26815,  Location: 2.0 S. 4.8 E. WILDER (Lat: 43.647556,  Lng: -116.816556),  Route carried "on" structure: County highway 3792,  Year Built: 1950,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 260 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 390 (year 2039),  Design Load: HS 20,  Features Intersected: DEER FLAT LOW LINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.492,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 26875,  Location: 2.0 S. 5.0 E. WILDER (Lat: 43.647611,  Lng: -116.811750),  Route carried "on" structure: County highway 3792,  Year Built: 1950,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 260 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 390 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.879,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $498,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2695,  Location: 1.2 N. 3.4 E. WILDER (Lat: 43.695194,  Lng: -116.844361),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Posted for load,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 20 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 30 (year 2039),  Design Load: H 15,  Features Intersected: DIXIE SLOUGH,  Facility Carried by Structure: TUCKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.353,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 20.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $347,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 26956,  Location: 1.1 N. 3.3 E. WILDER (Lat: 43.694839,  Lng: -116.845600),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 20 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 30 (year 2039),  Design Load: HS 20,  Features Intersected: RIVERSIDE CANAL,  Facility Carried by Structure: TUCKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.259,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 26961,  Location: 7.0 S. 0.3 E. NOTUS (Lat: 43.620417,  Lng: -116.792678),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 100 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2039),  Design Load: H 20,  Features Intersected: LOW LINE CANAL,  Facility Carried by Structure: BEET ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.991,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2701,  Location: 2.0 S. 3.2 E. WILDER (Lat: 43.647250,  Lng: -116.848972),  Route carried "on" structure: County highway 3792,  Year Built: 1950,  Year Reconstructed: 1972,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 190 (year 2019),  Average Future Daily Traffic: 285 (year 2039),  Design Load: H 10,  Features Intersected: DEER FLAT CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 169.264,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $292,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $438,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27061,  Location: 2.0 S. 2.7 E. WILDER (Lat: 43.647167,  Lng: -116.857333),  Route carried "on" structure: County highway 3792,  Year Built: 1989,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 190 (year 2019),  Average Future Daily Traffic: 285 (year 2039),  Design Load: HS 15,  Features Intersected: DEER FLAT CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.548,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.8m (15.7ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000 ( Estimate for 2019),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27071,  Location: 2.2 S. 3.0 E. WILDER (Lat: 43.645139,  Lng: -116.852528),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 30 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 45 (year 2039),  Design Load: HS 20,  Features Intersected: DEER FLAT CANAL,  Facility Carried by Structure: VAN SLYKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.048,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27086,  Location: 2.0 S. 2.5 E. WILDER (Lat: 43.647139,  Lng: -116.861556),  Route carried "on" structure: County highway 3792,  Year Built: 1997,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 190 (year 2019),  Average Future Daily Traffic: 285 (year 2039),  Design Load: HS 20,  Features Intersected: DEER FLAT CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.204,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2717,  Location: 1.9 S. 4.5 E. WILDER (Lat: 43.649889,  Lng: -116.822639),  Route carried "on" structure: County highway 3717,  Year Built: 1961,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 440 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 660 (year 2039),  Design Load: H 15,  Features Intersected: DEER FLAT LOW LINE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.989,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27206,  Location: 0.8 S. 3.0 E. WILDER (Lat: 43.664472,  Lng: -116.852500),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 80 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 120 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL,  Facility Carried by Structure: VAN SLYKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 166.158,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27245,  Location: 1.1 S. 4.5 E. WILDER (Lat: 43.660972,  Lng: -116.822694),  Route carried "on" structure: County highway 3717,  Year Built: 1967,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 440 (year 2019),  Truck Traffic: 23%,  Average Future Daily Traffic: 660 (year 2039),  Design Load: H 15,  Features Intersected: GOLDEN GATE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 164.935,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: November 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2729,  Location: 1.1 S. 4.0 E. WILDER (Lat: 43.660694,  Lng: -116.832611),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 70 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 105 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL,  Facility Carried by Structure: TUCKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 163.229,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27346,  Location: 3.5 S. 5.5 E. WILDER (Lat: 43.624889,  Lng: -116.799833),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 75 (year 2039),  Design Load: HS 20,  Features Intersected: LOWLINE CANAL,  Facility Carried by Structure: LONKEY LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 162.761,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27356,  Location: 1.0 S. 4.0 E. WILDER (Lat: 43.649200,  Lng: -116.832564),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 70 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 105 (year 2039),  Design Load: HS 20,  Features Intersected: LOW LINE CANAL,  Facility Carried by Structure: TUCKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 161.956,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27386,  Location: 1.0 S. 3.8 E. WILDER (Lat: 43.661944,  Lng: -116.837028),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 80 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 120 (year 2039),  Design Load: HS 20,  Features Intersected: GOLDEN GATE CANAL,  Facility Carried by Structure: LOW PLEASANT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 170.967,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Greenleaf, Idaho (ID) on our hugely popular Idaho forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.