Bridge Statistics for Greenville, Virginia (VA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 187ft / 56.9mTotal length
  • $264,000Total costs
  • 287,216Total average daily traffic
  • 74,432Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greenville
  • No street view available for this location

New bridges in Greenville, VA - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 21950-1959
  • 191960-1969
  • 11970-1979
  • 11980-1989
Reconstructed bridges in Greenville, VA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Greenville, VA
Average Bridge Truck Traffic in Greenville, VA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Very good
  • 14.3%Good
  • 64.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Very good
  • 7.1%Good
  • 50.0%Satisfactory
  • 35.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Good
  • 71.4%Satisfactory
  • 21.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 12.5%Very good
  • 12.5%Good
  • 75.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 1685,  Location: 0.03 RT 1206- 0.02 RT 662 (Lat: 38.005147,  Lng: -79.155503),  Route carried "on" structure: US 11,  Year Built: 1934,  Year Reconstructed: 1949,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 6,807 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,744 (year 2040),  Design Load: H 15,  Features Intersected: SOUTH RIVER,  Facility Carried by Structure: LEE-JACKSON HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 363.589,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.5m (44.3ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.0m (42.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1698,  Location: 0.04 RT 340 - 0.30 RT 659 (Lat: 38.019456,  Lng: -79.140519),  Route carried "on" structure: US 11,  Year Built: 1950,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 6,807 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,744 (year 2040),  Design Load: H 15,  Features Intersected: CHRISTIANS CREEK,  Facility Carried by Structure: LEE-JACKSON HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 365.726,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.3m (17.4ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 44.5m (146.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $4,000,  Total Project Cost: $25,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1699,  Location: 1.00 RT 671 - 0.01 RT 666 (Lat: 37.961606,  Lng: -79.179761),  Route carried "on" structure: US 11,  Year Built: 1955,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 4,249 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,787 (year 2040),  Features Intersected: BRANCH POOR CREEK,  Facility Carried by Structure: LEE-JACKSON HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 358.237,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 18.2m (59.7ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1759,  Location: 4.53 ROCKBR CO-3.13 RT 11 (Lat: 37.991186,  Lng: -79.178111),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 3.76m (12.34ft),  Average Daily Traffic: 21,677 (year 2020),  Truck Traffic: 31%,  Average Future Daily Traffic: 30,348 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 675
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 338.807,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.69m (12.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $46,000,  Total Project Cost: $46,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1761,  Location: 4.53 ROCKBR CO-3.13 RT 11 (Lat: 37.991244,  Lng: -79.178583),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 20,818 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 29,145 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 675
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 339.322,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $42,000,  Total Project Cost: $44,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1765,  Location: 6.04 RCKBR CO- 1.62 RT 11 (Lat: 38.010144,  Lng: -79.165211),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 7.00m (22.97ft),  Average Daily Traffic: 20,818 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 29,145 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: STOVER SCHOOL RD (662)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 341.655,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1767,  Location: 7.67 RCKBR CO-4.72 RT 654 (Lat: 38.024447,  Lng: -79.141111),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 7.58m (24.87ft),  Average Daily Traffic: 20,847 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 29,186 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RT 11
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 343.811,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.3m (66.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1769,  Location: 7.67 RCKBR CO-4.72 RT 654 (Lat: 38.024889,  Lng: -79.141164),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 7.60m (24.93ft),  Average Daily Traffic: 20,818 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 29,145 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 344.278,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.1m (69.2ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1777,  Location: 0.15 RT 11 - 3.21 RT 654 (Lat: 38.041389,  Lng: -79.123783),  Route carried "on" structure: Interstate 81,  Year Built: 1968,  Status: Open,  Structure Length: 3.52m (11.55ft),  Average Daily Traffic: 20,847 (year 2020),  Truck Traffic: 40%,  Average Future Daily Traffic: 29,186 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RT 694
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 346.289,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $44,000,  Total Project Cost: $46,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1779,  Location: 1.51 RT 11 - 7.03 RT 64 (Lat: 38.041736,  Lng: -79.124278),  Route carried "on" structure: Interstate 81,  Year Built: 1968,  Status: Open,  Structure Length: 3.70m (12.14ft),  Average Daily Traffic: 20,681 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 28,953 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RT 694
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 346.756,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $44,000,  Total Project Cost: $46,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1797,  Location: 6.50 ROCKBR CL-1.16 RT 11 (Lat: 38.014003,  Lng: -79.157386),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 21,677 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 30,348 (year 2040),  Design Load: HS 20,  Features Intersected: CHRISTIANS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 341.977,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 2101,  Location: 0.35 RT 657 - 1.10 RT 608 (Lat: 38.016583,  Lng: -79.114386),  Route carried "on" structure: County highway 658,  Year Built: 1932,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 162 (year 2017),  Average Future Daily Traffic: 237 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SOUTH RIVER,  Facility Carried by Structure: AVIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2102,  Location: 0.40 RT 657 - 1.05 RT 608 (Lat: 38.016094,  Lng: -79.114044),  Route carried "on" structure: County highway 658,  Year Built: 1984,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 162 (year 2017),  Average Future Daily Traffic: 237 (year 2040),  Features Intersected: PINE RUN,  Facility Carried by Structure: AVIS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.644,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.1m (16.7ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 2104,  Location: 0.39 TO 613 - 0.17 TO1201 (Lat: 38.006967,  Lng: -79.161156),  Route carried "on" structure: County highway 662,  Year Built: 1971,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 2.45m (8.04ft),  Average Daily Traffic: 437 (year 2013),  Average Future Daily Traffic: 582 (year 2040),  Features Intersected: SOUTH RIVER,  Facility Carried by Structure: STOVER SCHOOL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.122,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2114,  Location: 0.07 RT F215-0.28 RT F214 (Lat: 37.979211,  Lng: -79.185022),  Route carried "on" structure: County highway 671,  Year Built: 1966,  Status: Open,  Structure Length: 10.34m (33.92ft),  Average Daily Traffic: 361 (year 2013),  Average Future Daily Traffic: 471 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 81,  Facility Carried by Structure: ALMO CHAPEL RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.450,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.0m (72.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $54,000,  Total Project Cost: $57,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2402,  Location: 1.17 RT 675 - 2.04 RT 620 (Lat: 37.981844,  Lng: -79.200511),  Route carried "on" structure: County highway 919,  Year Built: 1932,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 527 (year 2017),  Average Future Daily Traffic: 656 (year 2040),  Design Load: HS 20,  Features Intersected: TRIB OF SOUTH RIVER,  Facility Carried by Structure: OLD PROVIDENCE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.438,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 1759,  Location: 4.53 ROCKBR CO-3.13 RT 11 (Lat: 37.991186,  Lng: -79.178111),  Route carried "under" structure: County highway 675,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 720 (year 2018),  Truck Traffic: 3%,  Features Intersected: RTE 675,  Facility Carried by Structure: NBL ROUTE 0081
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 10.861,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 1761,  Location: 4.53 ROCKBR CO-3.13 RT 11 (Lat: 37.991244,  Lng: -79.178583),  Route carried "under" structure: County highway 675,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 720 (year 2018),  Truck Traffic: 3%,  Features Intersected: RTE 675,  Facility Carried by Structure: SBL ROUTE 0081
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 10.796,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>   Show street view

Structure Number: 1763,  Location: 6.08 RCKBR CO- 1.58 RT 11 (Lat: 38.009939,  Lng: -79.163719),  Route carried "under" structure: County highway 662,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 440 (year 2018),  Features Intersected: STOVER SCHOOL RD (662),  Facility Carried by Structure: I-81 NBL
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 5.648,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 14.8m (48.6ft)

Find on map >>   Show street view

Structure Number: 1765,  Location: 6.04 RCKBR CO- 1.62 RT 11 (Lat: 38.010144,  Lng: -79.165211),  Route carried "under" structure: Interstate 662,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 440 (year 2018),  Features Intersected: STOVER SCHOOL RD (662),  Facility Carried by Structure: I-81 SBL
Minimum Vertical Clearance: 9.65m (31.66ft),  Kilometerpoint: 5.599,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 1767,  Location: 7.67 RCKBR CO-4.72 RT 654 (Lat: 38.024447,  Lng: -79.141111),  Route carried "under" structure: US 11,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 3,600 (year 2018),  Truck Traffic: 3%,  Features Intersected: RT 11,  Facility Carried by Structure: I-81 NBL
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 366.364,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.3m (66.6ft)

Find on map >>   Show street view

Structure Number: 1769,  Location: 7.67 RCKBR CO-4.72 RT 654 (Lat: 38.024889,  Lng: -79.141164),  Route carried "under" structure: US 11,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 3,600 (year 2018),  Truck Traffic: 3%,  Features Intersected: ROUTE 11,  Facility Carried by Structure: I-81 SBL
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 366.381,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.1m (69.2ft)

Find on map >>   Show street view

Structure Number: 1777,  Location: 0.15 RT 11 - 3.21 RT 654 (Lat: 38.041389,  Lng: -79.123783),  Route carried "under" structure: County highway 694,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 440 (year 2020),  Features Intersected: RT 694,  Facility Carried by Structure: NBL ROUTE 0081
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 12.840,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 12.4m (40.7ft)

Find on map >>   Show street view

Structure Number: 1779,  Location: 1.51 RT 11 - 7.03 RT 64 (Lat: 38.041736,  Lng: -79.124278),  Route carried "under" structure: County highway 694,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 440 (year 2018),  Features Intersected: RT 694,  Facility Carried by Structure: SBL ROUTE 0081
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 12.792,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 2024,  Location: 0.42 RT 671- 0.03 RT F213 (Lat: 37.953461,  Lng: -79.209178),  Route carried "under" structure: Interstate 81,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 48,000 (year 2018),  Truck Traffic: 30%,  Features Intersected: RTE I-81,  Facility Carried by Structure: SPOTTSWOOD RD
Minimum Vertical Clearance: 5.80m (19.03ft),  Kilometerpoint: 333.755,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 2114,  Location: 0.07 RT F215-0.28 RT F214 (Lat: 37.979211,  Lng: -79.185022),  Route carried "under" structure: Interstate 81,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 41,121 (year 2008),  Truck Traffic: 15%,  Features Intersected: RTE 81,  Facility Carried by Structure: ALMO CHAPEL RD.
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 337.343,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.0m (72.2ft)