Bridge Statistics for Grovetown, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 194ft / 59.3mTotal length
  • $12,462,000Total costs
  • 262,865Total average daily traffic
  • 19,154Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Grovetown
  • No street view available for this location

New bridges in Grovetown, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61960-1969
  • 11980-1989
  • 11990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Grovetown, GA
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Very good
  • 71.4%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 37.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 80.0%Good
Find on map >>   Show street view

Structure Number: 730017,  Location: 4.6 MI NE OF HARLEM (Lat: 33.476439,  Lng: -82.280139),  Route carried "on" structure: State highway 223,  Year Built: 1934,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,590 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,885 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE KIOKEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 730025,  Location: 1.2 MI N OF SR-223 (Lat: 33.485008,  Lng: -82.214228),  Route carried "on" structure: County highway 238,  Year Built: 1966,  Status: Open,  Structure Length: 8.26m (27.10ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: I-20,  Facility Carried by Structure: CHAMBLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 48.49m (159.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,059,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,588,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 730026,  Location: 1.3 MI N OF SR-223 (Lat: 33.488569,  Lng: -82.245197),  Route carried "on" structure: County highway 253,  Year Built: 1966,  Status: Open,  Structure Length: 7.59m (24.90ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: I-20 & OFF RAMP FOR WS,  Facility Carried by Structure: BAKER PLACE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 29.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $973,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $1,459,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 730032,  Location: 2.7 MI NW OF GROVETOWN (Lat: 33.485769,  Lng: -82.222319),  Route carried "on" structure: Interstate 20,  Year Built: 1966,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 37,890 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 56,835 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: UCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 302.557,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,231,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 730033,  Location: 2.7 MI NW OF GROVETOWN (Lat: 33.486011,  Lng: -82.222258),  Route carried "on" structure: Interstate 20,  Year Built: 1966,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 37,890 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 56,835 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: UCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 302.557,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,231,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 730039,  Location: 4.8 MI NW OF GROVETOWN (Lat: 33.486728,  Lng: -82.271928),  Route carried "on" structure: County highway 2122,  Year Built: 1963,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,520 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,280 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE KIOKEE CREEK,  Facility Carried by Structure: LOUISVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 73004,  Location: 5.2 MI NW OF GROVETOWN (Lat: 33.492128,  Lng: -82.275647),  Route carried "on" structure: County highway 2122,  Year Built: 1966,  Status: Open,  Structure Length: 9.60m (31.50ft),  Average Daily Traffic: 1,520 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,280 (year 2032),  Design Load: H 15,  Features Intersected: I-20,  Facility Carried by Structure: LOUISVILLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 49.83m (163.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,231,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,846,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 735007,  Location: 3 MI NW OF GROVETOWN (Lat: 33.490747,  Lng: -82.221808),  Route carried "on" structure: County highway 238,  Year Built: 1984,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: UCHEE CREEK,  Facility Carried by Structure: CHAMBLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 735016,  Location: 2 MI W OF GROVETOWN (Lat: 33.456369,  Lng: -82.232917),  Route carried "on" structure: County highway 2121,  Year Built: 1996,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 5,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,500 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: UCHEE CREEK,  Facility Carried by Structure: HARLEM-GROVETOWN R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 735019,  Location: 2.1 MI NW OF GROVETOWN (Lat: 33.480839,  Lng: -82.210889),  Route carried "on" structure: County highway 1776,  Year Built: 2006,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 830 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,245 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: MILL BRANCH,  Facility Carried by Structure: SAWMILL TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $105,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $158,000
Find on map >>   Show street view

Structure Number: 735023,  Location: 2.1 MI NORTH OF GROVETOWN (Lat: 33.483808,  Lng: -82.199278),  Route carried "on" structure: State highway 388,  Year Built: 2009,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 14,500 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 21,750 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: LEWISTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 26.4m (86.6ft),  Out-to-Out Width: 29.0m (95.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,584,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,376,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 735024,  Location: 2.2 MI NW OF GROVETOWN (Lat: 33.466919,  Lng: -82.232581),  Route carried "on" structure: State highway 223,  Year Built: 2011,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 4,780 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,170 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: UCHEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,172,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,758,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 730025,  Location: 1.2 MI N OF SR-223 (Lat: 33.485008,  Lng: -82.214228),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 33,900 (year 2010),  Truck Traffic: 15%,  Features Intersected: CR 238 CHAMBLIN ROAD,  Facility Carried by Structure: CHAMBLIN ROAD
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 304.166,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 730026,  Location: 1.3 MI N OF SR-223 (Lat: 33.488569,  Lng: -82.245197),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 33,900 (year 2010),  Truck Traffic: 15%,  Features Intersected: CR253 BAKER PLACE CIRCLE,  Facility Carried by Structure: BAKER PLACE ROAD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 300.947,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 730026,  Location: 1.3 MI N OF SR-223 (Lat: 33.488569,  Lng: -82.245197),  Route carried "under" structure: Ramp Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 8,475 (year 2004),  Truck Traffic: 10%,  Features Intersected: CR253 BAKER PLACE CIRCLE,  Facility Carried by Structure: BAKER PLACE ROAD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 300.947,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 73004,  Location: 5.2 MI NW OF GROVETOWN (Lat: 33.492128,  Lng: -82.275647),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 33,900 (year 2010),  Truck Traffic: 1%,  Features Intersected: S-2122 LOUISVILLE ROAD,  Facility Carried by Structure: LOUISVILLE ROAD
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 297.729,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 735023,  Location: 2.1 MI NORTH OF GROVETOWN (Lat: 33.483808,  Lng: -82.199278),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 44,700 (year 2010),  Truck Traffic: 15%,  Features Intersected: SR 388 LEWISTON,  Facility Carried by Structure: LEWISTON ROAD
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 305.776,  Lanes on structure: 5,  Length of Maximum Span: 0.0m