Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Gulf Shores, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 305ft / 93.4mTotal length
  • $55,946,000Total costs
  • 226,981Total average daily traffic
  • 11,335Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Gulf Shores
  • No street view available for this location

New bridges in Gulf Shores, AL - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 81970-1979
  • 11980-1989
  • 81990-1999
  • 12000-2009
  • 42010-2019
Reconstructed bridges in Gulf Shores, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Gulf Shores, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 50.0%Good
  • 12.5%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 37.5%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.8%Very good
  • 35.3%Good
  • 29.4%Satisfactory
  • 23.5%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Good
  • 30.0%Satisfactory
  • 10.0%Poor
Find on map >>   Show street view

Structure Number: 1834,  Location: 4170 FT N JCT 1073 (Lat: 34.242458,  Lng: -86.314342),  Route carried "on" structure: County highway 159,  Year Built: 1960,  Status: Posted for load,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 200 (year 1994),  Truck Traffic: 1%,  Average Future Daily Traffic: 350 (year 2040),  Design Load: H 10,  Features Intersected: SLAB CREEK,  Facility Carried by Structure: COUNTY HIGHWAY115
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 13.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $273,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 10764,  Location: 1.8 MI N SR 182 (Lat: 30.275511,  Lng: -87.687008),  Route carried "on" structure: State highway 59,  Year Built: 1972,  Status: Open,  Structure Length: 5.33m (17.49ft),  Average Daily Traffic: 44,604 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 66,906 (year 2039),  Design Load: HS 20,  Features Intersected: 22ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.000,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.36m (20.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,665,000,  Roadway Improvement Cost: $367,000,  Total Project Cost: $4,032,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1125,  Location: 1 MI S JCT CO RD 10 (Lat: 30.321728,  Lng: -87.683000),  Route carried "on" structure: State highway 59,  Year Built: 1974,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 34,496 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 51,744 (year 2040),  Design Load: HS 20,  Features Intersected: BRIGHTS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.206,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.0m (78.7ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 79.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $1,650,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 11464,  Location: .4 MI N JCT SR 182 (Lat: 30.254694,  Lng: -87.688811),  Route carried "on" structure: State highway 59,  Year Built: 1975,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 38,400 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 57,600 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE LAGOON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.705,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Underwater Inspection Date: November 2021,  Bridge Improvement Cost: $2,681,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $2,949,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11551,  Location: 1.9 MI N SR 182 (Lat: 30.277031,  Lng: -87.686814),  Route carried "on" structure: State highway 59,  Year Built: 1972,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 53.71m (176.21ft),  Average Daily Traffic: 44,604 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 66,906 (year 2039),  Design Load: HS 20,  Features Intersected: INTRACOASTAL CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.188,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.0m (82.0ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 22.3m (73.2ft), Horizontal Clearance: 38.1m (125.0ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 24.7m (81.0ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 56.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 53.71m (176.21ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: Febuary 2022,  Bridge Improvement Cost: $30,934,000,  Roadway Improvement Cost: $3,093,000,  Total Project Cost: $34,027,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15042,  Location: E OF GU SH POST OFFICE (Lat: 30.274486,  Lng: -87.683894),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 488 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 732 (year 2041),  Features Intersected: W 1ST ST DRAINAGE,  Facility Carried by Structure: W 21ST AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $476,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15234,  Location: 0.1 MI S CLUBHOUSE DR (Lat: 30.263333,  Lng: -87.688333),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 697 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,046 (year 2041),  Features Intersected: WEST 1ST ST DRAINAGE,  Facility Carried by Structure: WEST 2ND ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.526,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 82.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $373,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15235,  Location: 192' W OF SR 59 (Lat: 30.271028,  Lng: -87.688683),  Route carried "on" structure: City street ,  Year Built: 1990,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,220 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,830 (year 2041),  Features Intersected: WEST 1ST ST. DRAINAGE,  Facility Carried by Structure: CLUBHOUSE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.702,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,390,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $2,629,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15236,  Location: 321' W OF SR 59 (Lat: 30.272464,  Lng: -87.685597),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,220 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,830 (year 2041),  Features Intersected: W 1ST ST DRAINAGE,  Facility Carried by Structure: W 19TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.428,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15237,  Location: 0.3 MI W OF E 2ND ST (Lat: 30.275558,  Lng: -87.688742),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 731 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,097 (year 2041),  Features Intersected: W 1ST ST DRAINAGE,  Facility Carried by Structure: W 22ND AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $605,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $666,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15238,  Location: 0.3 MI W OF E 2ND ST (Lat: 30.277939,  Lng: -87.688756),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 490 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 733 (year 2041),  Features Intersected: W 1ST ST DRAINAGE,  Facility Carried by Structure: W CANAL AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.629,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $605,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $666,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16843,  Location: 4.3 MI. W. OF AL. HWY. 59 (Lat: 30.283436,  Lng: -87.734317),  Route carried "on" structure: County highway 6,  Year Built: 1997,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 977 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,466 (year 2039),  Design Load: HS 20,  Features Intersected: OYSTER BAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Underwater Inspection Date: October 2020,  Bridge Improvement Cost: $1,277,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,405,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17925,  Location: 2.3 MI. E. OF AL. HWY. 59 (Lat: 30.297525,  Lng: -87.644928),  Route carried "on" structure: County highway 4,  Year Built: 2000,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 405 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 547 (year 2038),  Features Intersected: COTTON CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.85m (9.35ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $708,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 18205,  Location: 0.2 MI N SR 182 (Lat: 30.256122,  Lng: -87.653814),  Route carried "on" structure: State lands road 2,  Year Built: 1975,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 185 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 278 (year 2039),  Design Load: HS 20,  Features Intersected: GULF ST PARK BOAT CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.345,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.89m (19.32ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $1,615,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $1,777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1834,  Location: 1 MI W 29TH AVE (Lat: 30.282747,  Lng: -87.704361),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 630 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 945 (year 2041),  Design Load: HS 20,  Features Intersected: 28TH AVE DRAINAGE,  Facility Carried by Structure: 28TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $377,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $415,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20631,  Location: 1 Mile West Of SR 59 (Lat: 30.241394,  Lng: -87.738172),  Route carried "on" structure: State highway 182,  Year Built: 2015,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 6,068 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,102 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE LAGOON PASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.681,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.1m (82.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 82.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.86m (22.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $1,929,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,122,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21549,  Location: _0.9 MI N SR 182 (Lat: 30.256325,  Lng: -87.679042),  Route carried "on" structure: State highway 135,  Year Built: 2019,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 10,151 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,227 (year 2040),  Design Load: HS 20,  Features Intersected: _SALT LAKE CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.455,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 11.4m (37.4ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 84.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $617,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $679,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 21553,  Location: 189 ft south of HWY 180. (Lat: 30.235833,  Lng: -87.916389),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED CREEK,  Facility Carried by Structure: MORGANTOWN BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 1.5m (4.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.54m (8.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $558,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $614,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10764,  Location: 1.8 MI N SR 182 (Lat: 30.275511,  Lng: -87.687008),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 955 (year 2019),  Truck Traffic: 1%,  Features Intersected: 22ND AVE,  Facility Carried by Structure: SR 59
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 11551,  Location: 1.9 MI N SR 182 (Lat: 30.277031,  Lng: -87.686814),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 700 (year 2019),  Truck Traffic: 1%,  Features Intersected: INTRACOASTAL CANAL,  Facility Carried by Structure: SR 59
Minimum Vertical Clearance: 11.89m (39.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 11551,  Location: 1.9 MI N SR 182 (Lat: 30.277031,  Lng: -87.686814),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2019),  Truck Traffic: 1%,  Features Intersected: INTRACOASTAL CANAL,  Facility Carried by Structure: SR 59
Minimum Vertical Clearance: 11.89m (39.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 21394,  Location: .1 Mi. E. Of SR-135 & 182 (Lat: 30.251875,  Lng: -87.664794),  Route carried "under" structure: State highway 182,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 21,670 (year 2017),  Truck Traffic: 3%,  Features Intersected: SR-182,  Facility Carried by Structure: Ped. O'pass @ Pier
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 12.826,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 21399,  Location: _ (Lat: 30.255419,  Lng: -87.644697),  Route carried "under" structure: State highway 182,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 17,440 (year 2017),  Truck Traffic: 3%,  Features Intersected: SR-182,  Facility Carried by Structure: Ped Opass @ Pavil
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 14.886,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 0.0m

Discuss Gulf Shores, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.