Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hartford, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 180ft / 55.3mTotal length
  • $17,624,000Total costs
  • 11,988Total average daily traffic
  • 784Total average daily truck traffic
  • 17,400Total future (year 2033) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hartford
  • No street view available for this location

New bridges in Hartford, AL - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 61960-1969
  • 11970-1979
  • 31980-1989
  • 21990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Hartford, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 50.0%Very good
  • 37.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 50.0%Very good
  • 12.5%Good
  • 25.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 37.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.5%Very good
  • 26.3%Good
  • 42.1%Satisfactory
  • 21.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 36.4%Good
  • 45.5%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 3808,  Location: 2 MILES SOUTH OF HARTFORD (Lat: 31.072831,  Lng: -85.700394),  Route carried "on" structure: County highway 61,  Year Built: 1950,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 340 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 590 (year 2041),  Design Load: H 15,  Features Intersected: BURCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $319,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $351,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 629,  Location: 5 MILE NORTH OF HARTFORD (Lat: 31.171700,  Lng: -85.698692),  Route carried "on" structure: County highway 41,  Year Built: 1958,  Status: Posted for load,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 180 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 200 (year 2040),  Design Load: H 15,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 35.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 8.76m (28.74ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $1,381,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $1,519,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 633,  Location: 2 MILES NORTH OF HARTFORD (Lat: 31.128431,  Lng: -85.696297),  Route carried "on" structure: County highway 61,  Year Built: 1958,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 220 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 250 (year 2040),  Design Load: H 20,  Features Intersected: COX MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $356,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6331,  Location: 4 MILES NORTH OF HARTFORD (Lat: 31.157525,  Lng: -85.696486),  Route carried "on" structure: County highway 61,  Year Built: 1958,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 220 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 253 (year 2040),  Design Load: H 20,  Features Intersected: COX MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 40.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $483,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $531,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7579,  Location: 3 MI. SW OF HARTFORD (Lat: 31.073231,  Lng: -85.720650),  Route carried "on" structure: County highway 16,  Year Built: 1962,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 104 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 239 (year 2042),  Design Load: H 20,  Features Intersected: BURCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $701,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7877,  Location: 4 MI NE OF HARTFORD (Lat: 31.151219,  Lng: -85.653303),  Route carried "on" structure: County highway ,  Year Built: 1963,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 120 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 170 (year 2041),  Design Load: H 20,  Features Intersected: SANDY BRANCH,  Facility Carried by Structure: HWY46 T Peacock Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $268,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 863,  Location: 3 MI S OF HARTFORD (Lat: 31.058108,  Lng: -85.676625),  Route carried "on" structure: County highway 67,  Year Built: 1965,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 106 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 140 (year 2040),  Design Load: H 15,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 32.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $341,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 9714,  Location: 3 MI W OF HARTFORD (Lat: 31.114100,  Lng: -85.748472),  Route carried "on" structure: County highway 38,  Year Built: 1968,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 160 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 175 (year 2041),  Design Load: H 15,  Features Intersected: BARNES ROARING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 46.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $435,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1022,  Location: 3 MI SE OF HARTFORD (Lat: 31.074581,  Lng: -85.649769),  Route carried "on" structure: County highway 16,  Year Built: 1970,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 210 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 298 (year 2040),  Design Load: H 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.08m (10.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $711,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $782,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12289,  Location: 2.5 MI NORTH OF HARTFORD (Lat: 31.138719,  Lng: -85.699431),  Route carried "on" structure: County highway ,  Year Built: 1961,  Year Reconstructed: 1991,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 55 (year 2020),  Average Future Daily Traffic: 75 (year 2040),  Design Load: H 15,  Features Intersected: COX MILL CREEK,  Facility Carried by Structure: MACEDONIA RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 26.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $201,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $221,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 13483,  Location: 2 MI SW OF HARTFORD (Lat: 31.073611,  Lng: -85.732964),  Route carried "on" structure: County highway 16,  Year Built: 1985,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 107 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 166 (year 2040),  Design Load: H 20,  Features Intersected: JUSTICE MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $474,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $521,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14338,  Location: 2 MI E OF HARTFORD (Lat: 31.093033,  Lng: -85.650878),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 50 (year 2020),  Average Future Daily Traffic: 120 (year 2040),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: COE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $777,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 14955,  Location: 4.5 MI. N. FLA. LINE (Lat: 31.050217,  Lng: -85.681617),  Route carried "on" structure: State highway 167,  Year Built: 1989,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 3,100 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,420 (year 2033),  Design Load: HS 20,  Features Intersected: SPRING CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.239,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.94m (6.36ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $830,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $913,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16619,  Location: 0.2MI S CONO44 (Lat: 31.129600,  Lng: -85.656444),  Route carried "on" structure: State highway 123,  Year Built: 2002,  Status: Open,  Structure Length: 10.97m (35.99ft),  Average Daily Traffic: 2,470 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,529 (year 2033),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.242,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.86m (38.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,417,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $3,759,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17356,  Location: 1 MILES S. OF HARTFORD (Lat: 31.072475,  Lng: -85.712322),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 55 (year 2020),  Average Future Daily Traffic: 65 (year 2040),  Design Load: HS 20,  Features Intersected: BURCH CREEK,  Facility Carried by Structure: RECREATION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $188,000,  Roadway Improvement Cost: $19,000,  Total Project Cost: $207,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 17357,  Location: 3 MILES NE. OF HARTFORD (Lat: 31.143931,  Lng: -85.671711),  Route carried "on" structure: County highway 69,  Year Built: 1996,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 210 (year 2020),  Average Future Daily Traffic: 500 (year 2040),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,545,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $1,700,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17732,  Location: 1 MILE S.W. OF HARTFORD (Lat: 31.075917,  Lng: -85.735472),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 25 (year 2020),  Average Future Daily Traffic: 36 (year 2040),  Design Load: HS 20,  Features Intersected: JUSTICE MILL CREEK,  Facility Carried by Structure: TYLER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.47m (4.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $383,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18859,  Location: 3.5 MI. E. SR. 123 (Lat: 31.106281,  Lng: -85.650525),  Route carried "on" structure: State highway 52,  Year Built: 2008,  Status: Open,  Structure Length: 7.77m (25.49ft),  Average Daily Traffic: 4,210 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,110 (year 2033),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.957,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.5m (44.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.79m (28.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,772,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $3,049,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 20305,  Location: 2 MILES EAST OF HARTFORD (Lat: 31.118689,  Lng: -85.653875),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 46 (year 2021),  Average Future Daily Traffic: 64 (year 2041),  Design Load: HS 20,  Features Intersected: HURRICANE CREEK,  Facility Carried by Structure: FOSTER CLARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.98m (13.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $736,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $810,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Hartford, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.