Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hastings, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 331ft / 101mTotal length
  • $47,848,000Total costs
  • 225,126Total average daily traffic
  • 16,747Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hastings
  • No street view available for this location

New bridges in Hastings, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11930-1939
  • 71950-1959
  • 121960-1969
  • 11980-1989
  • 41990-1999
  • 12000-2009
  • 12010-2019
Reconstructed bridges in Hastings, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 32010-2019
Average Bridge Daily Traffic in Hastings, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Excellent
  • 7.1%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 21.4%Fair
  • 7.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 28.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Very good
  • 28.6%Good
  • 64.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 13.3%Very good
  • 20.0%Good
  • 33.3%Satisfactory
  • 26.7%Fair
  • 6.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Good
  • 37.5%Satisfactory
  • 37.5%Fair
  • 12.5%Poor
Find on map >>   Show street view

Structure Number: 100855,  Location: .8 MI S JCT US 11 & SH 49 (Lat: 43.274625,  Lng: -76.144514),  Route carried "on" structure: US 11,  Year Built: 1994,  Status: Open,  Structure Length: 10.33m (33.89ft),  Average Daily Traffic: 5,430 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,718 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CSX TRANSPRTATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.781,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.33m (33.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,796,000,  Roadway Improvement Cost: $1,637,000,  Total Project Cost: $4,433,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102616,  Location: 3.2 MI W JCT RTS 49 + 11 (Lat: 43.299111,  Lng: -76.207436),  Route carried "on" structure: State highway 49,  Year Built: 1933,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 3,322 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,342 (year 2040),  Design Load: HS 20,  Features Intersected: CAUGHDENOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.022,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $233,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $370,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102618,  Location: JCT OF RTS 49 + I-81 (Lat: 43.286278,  Lng: -76.125369),  Route carried "on" structure: State highway 49,  Year Built: 1960,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 10,087 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 12,253 (year 2040),  Design Load: HS 20,  Features Intersected: 81I 81I34041036, RTE I81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.150,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.88m (22.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,726,000,  Roadway Improvement Cost: $1,596,000,  Total Project Cost: $4,322,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031771,  Location: W MONROE @ ONEIDA LAKE (Lat: 43.241442,  Lng: -76.131194),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 18,270 (year 2007),  Truck Traffic: 13%,  Design Load: HS 20,  Features Intersected: CR 37 - SWAMP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,370,000,  Roadway Improvement Cost: $802,000,  Total Project Cost: $2,172,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1031772,  Location: W MONROE @ ONEIDA LAKE (Lat: 43.241456,  Lng: -76.130972),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 12,773 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 18,425 (year 2040),  Design Load: HS 20,  Features Intersected: CR 37 - SWAMP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.08m (13.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,370,000,  Roadway Improvement Cost: $802,000,  Total Project Cost: $2,172,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103178,  Location: 1.1 MI N JCT I81 & SH 49 (Lat: 43.304575,  Lng: -76.126719),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 928 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 954 (year 2040),  Design Load: HS 20,  Features Intersected: 81I 81I34041046 NB, RTE,  Facility Carried by Structure: COUNTY ROAD 12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.228,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.83m (28.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,885,000,  Roadway Improvement Cost: $1,104,000,  Total Project Cost: $2,989,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 103179,  Location: 2.6 MI N JCT RTS 81I + 49 (Lat: 43.327744,  Lng: -76.124850),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 870 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 894 (year 2040),  Design Load: HS 20,  Features Intersected: SB - 81I 81I34041063, RT,  Facility Carried by Structure: COUNTY ROAD 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.639,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,649,000,  Roadway Improvement Cost: $966,000,  Total Project Cost: $2,615,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1031801,  Location: 2.9 MI N JCT RTS I81SB+49 (Lat: 43.330075,  Lng: -76.123778),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 11,875 (year 2013),  Truck Traffic: 16%,  Design Load: H 20,  Features Intersected: DYKEMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.732,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $626,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031802,  Location: 2.9 MI N JCT RTS I81NB+49 (Lat: 43.330008,  Lng: -76.123433),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 9,999 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 14,423 (year 2040),  Design Load: H 20,  Features Intersected: DYKEMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.732,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $231,000,  Total Project Cost: $626,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103181,  Location: 1.9 MI S JCT I81 & SH 69 (Lat: 43.373792,  Lng: -76.122414),  Route carried "on" structure: County highway ,  Year Built: 1960,  Status: Open,  Structure Length: 7.04m (23.10ft),  Average Daily Traffic: 680 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 952 (year 2038),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: County Road 84
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.767,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 16.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 12.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 7.04m (23.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,484,000,  Roadway Improvement Cost: $869,000,  Total Project Cost: $2,354,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1031821,  Location: 1.8 MI S JCT RTS I81SB+69 (Lat: 43.377361,  Lng: -76.121664),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 11,875 (year 2013),  Truck Traffic: 16%,  Design Load: H 20,  Features Intersected: LITTLE SALMON RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.026,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $723,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031822,  Location: 1.8 MI S JCT I81NB & SH69 (Lat: 43.377311,  Lng: -76.121311),  Route carried "on" structure: Interstate 81,  Year Built: 1960,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 9,999 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 11,208 (year 2040),  Design Load: H 20,  Features Intersected: LITTLE SALMON RVR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.026,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $267,000,  Total Project Cost: $723,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220893,  Location: 3.2 MI SE OF PARISH (Lat: 43.367931,  Lng: -76.096553),  Route carried "on" structure: Other road ,  Year Built: 1987,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 4 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6 (year 2039),  Features Intersected: S BR LIL SALMON R,  Facility Carried by Structure: NELLIS DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 73.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $134,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $213,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 320894,  Location: 2.0 MI S OF PARISH (Lat: 43.377572,  Lng: -76.119147),  Route carried "on" structure: Other road ,  Year Built: 1999,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 375 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 525 (year 2037),  Features Intersected: CARLEY MILLS POND,  Facility Carried by Structure: WHITE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $151,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $240,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331354,  Location: 2.5 MI SW OF CENTRAL SQUA (Lat: 43.275336,  Lng: -76.191292),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 2,619 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,661 (year 2040),  Features Intersected: CAUGHDENOY CREEK,  Facility Carried by Structure: COUNTY ROAD 12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.582,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Inventory Rating: 77.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.08m (3.54ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $318,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331355,  Location: 3 MI NE OF CENTRAL SQUARE (Lat: 43.322806,  Lng: -76.116831),  Route carried "on" structure: County highway ,  Year Built: 1996,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,429 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 2,001 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DYKEMAN CREEK,  Facility Carried by Structure: COUNTY ROAD 12
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.604,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 73.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $137,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $216,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331356,  Location: 3 MI NE OF CENTRAL SQUARE (Lat: 43.322333,  Lng: -76.111361),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,401 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,961 (year 2040),  Features Intersected: BIG BAY CREEK,  Facility Carried by Structure: COUNTY ROAD 32
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.119,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $284,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331359,  Location: 2 MI SOUTH OF PARISH (Lat: 43.377778,  Lng: -76.122925),  Route carried "on" structure: County highway ,  Year Built: 1958,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 246 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 344 (year 2037),  Design Load: HS 20,  Features Intersected: S B LIL SALMON RV,  Facility Carried by Structure: CARLEY MILLS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $437,000,  Roadway Improvement Cost: $256,000,  Total Project Cost: $692,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33136,  Location: 2.8 MI SW OF CENTRAL SQ (Lat: 43.268178,  Lng: -76.195014),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,379 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,927 (year 2040),  Features Intersected: CAUGHDENOY CREEK,  Facility Carried by Structure: COUNTY ROAD 37
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $545,000,  Roadway Improvement Cost: $319,000,  Total Project Cost: $864,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336046,  Location: 3.3 MI SW OF CENTRAL SQ (Lat: 43.270939,  Lng: -76.206492),  Route carried "on" structure: County highway ,  Year Built: 1900,  Status: Open,  Structure Length: 11.19m (36.71ft),  Average Daily Traffic: 1,054 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,476 (year 2036),  Features Intersected: ONEIDA RIVER,  Facility Carried by Structure: CAUGHDENOY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.18m (36.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,352,000,  Roadway Improvement Cost: $2,548,000,  Total Project Cost: $6,900,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 4031761,  Location: 81I SB OVER ONEIDA LAKE (Lat: 43.239372,  Lng: -76.130739),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 14.48m (47.51ft),  Average Daily Traffic: 18,270 (year 2007),  Truck Traffic: 13%,  Design Load: HS 20,  Features Intersected: NYS BARGE CANAL, ONEIDA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 60.9m (199.8ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 97.5m (319.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.47m (47.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $4,413,000,  Roadway Improvement Cost: $2,584,000,  Total Project Cost: $6,998,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4031762,  Location: 81I NB OVER ONEIDA LAKE (Lat: 43.239403,  Lng: -76.130525),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 14.48m (47.51ft),  Average Daily Traffic: 12,773 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 18,425 (year 2040),  Design Load: HS 20,  Features Intersected: NYS BARGE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 60.9m (199.8ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 97.5m (319.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.47m (47.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: July 2017,  Bridge Improvement Cost: $4,413,000,  Roadway Improvement Cost: $2,584,000,  Total Project Cost: $6,998,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 102618,  Location: JCT OF RTS 49 + I-81 (Lat: 43.286278,  Lng: -76.125369),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,005 (year 2000),  Features Intersected: 81I 81I34041036, RTE I81,  Facility Carried by Structure: RTE 49
Minimum Vertical Clearance: 5.02m (16.47ft),  Kilometerpoint: 5.873,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 1031771,  Location: W MONROE @ ONEIDA LAKE (Lat: 43.241442,  Lng: -76.131194),  Route carried "under" structure: County highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 724 (year 2020),  Truck Traffic: 6%,  Features Intersected: CR 37 - SWAMP RD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 6.114,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 1031772,  Location: W MONROE @ ONEIDA LAKE (Lat: 43.241456,  Lng: -76.130972),  Route carried "under" structure: County highway ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 724 (year 2020),  Truck Traffic: 6%,  Features Intersected: CR 37 - SWAMP RD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 7.047,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: 103178,  Location: 1.1 MI N JCT I81 & SH 49 (Lat: 43.304575,  Lng: -76.126719),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,005 (year 2000),  Features Intersected: 81I 81I34041046 NB, RTE,  Facility Carried by Structure: COUNTY ROAD 12
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 7.981,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.5m (60.7ft)

Find on map >>   Show street view

Structure Number: 103179,  Location: 2.6 MI N JCT RTS 81I + 49 (Lat: 43.327744,  Lng: -76.124850),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,005 (year 2000),  Features Intersected: SB - 81I 81I34041063, RT,  Facility Carried by Structure: COUNTY ROAD 32
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 10.555,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.4m (53.8ft)

Find on map >>   Show street view

Structure Number: 103181,  Location: 1.9 MI S JCT I81 & SH 69 (Lat: 43.373792,  Lng: -76.122414),  Route carried "under" structure: Interstate 81,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 22,005 (year 2000),  Features Intersected: RTE I81,  Facility Carried by Structure: County Road 84
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 15.768,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Discuss Hastings, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.