Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Herkimer, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 256ft / 78.1mTotal length
  • $56,775,000Total costs
  • 164,086Total average daily traffic
  • 20,648Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Herkimer
  • No street view available for this location

New bridges in Herkimer, NY - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 71940-1949
  • 41950-1959
  • 11960-1969
  • 21970-1979
  • 11980-1989
  • 51990-1999
Reconstructed bridges in Herkimer, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Herkimer, NY
Average Bridge Truck Traffic in Herkimer, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 23.1%Good
  • 30.8%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.7%Excellent
  • 23.1%Very good
  • 30.8%Good
  • 15.4%Satisfactory
  • 15.4%Fair
  • 7.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.7%Very good
  • 23.1%Good
  • 30.8%Satisfactory
  • 30.8%Fair
  • 7.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.0%Good
  • 40.0%Satisfactory
  • 30.0%Fair
Find on map >>   Show street view

Structure Number: 1002429,  Location: 1.7 MI E JCT RTS 5 & 51 (Lat: 43.020100,  Lng: -75.000469),  Route carried "on" structure: State highway 5,  Year Built: 1949,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 13,020 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,081 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANSPRTATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.442,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 26 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 99.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.28m (7.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,666,000,  Roadway Improvement Cost: $1,561,000,  Total Project Cost: $4,227,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100243,  Location: .1 MI W JCT SH 5 & SH 28 (Lat: 43.026561,  Lng: -74.983122),  Route carried "on" structure: State highway 5,  Year Built: 1949,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 15,055 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,125 (year 2040),  Design Load: HS 20,  Features Intersected: HYDRAULIC CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.083,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 27.9m (91.5ft),  Out-to-Out Width: 31.6m (103.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,227,000,  Roadway Improvement Cost: $718,000,  Total Project Cost: $1,945,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100244,  Location: .3 MI W JCT SH 5 & SH 28 (Lat: 43.029181,  Lng: -74.974922),  Route carried "on" structure: State highway 5,  Year Built: 1997,  Status: Open,  Structure Length: 18.14m (59.51ft),  Average Daily Traffic: 11,195 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,247 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: WEST CANADA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.791,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 49.9m (163.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.13m (59.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $6,562,000,  Roadway Improvement Cost: $3,842,000,  Total Project Cost: $10,404,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1020079,  Location: MOHAWK ST RT 28 (Lat: 43.017522,  Lng: -74.993569),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 19,222 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 22,147 (year 2040),  Design Load: HS 20,  Features Intersected: NYS Route 28 SB, RTE 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.812,  Lanes on structure: 4,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 39.6m (129.9ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 39.5m (129.6ft),  Out-to-Out Width: 40.6m (133.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,855,000,  Roadway Improvement Cost: $2,258,000,  Total Project Cost: $6,113,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102009,  Location: 15 MI N JCT RTS 5 & 28 (Lat: 43.049256,  Lng: -74.985767),  Route carried "on" structure: State highway 28,  Year Built: 1964,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 4,000 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,024 (year 2040),  Design Load: HS 20,  Features Intersected: HYDRAULIC CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.751,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 76.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $458,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220462,  Location: .75 MI N JCT SH 5 & SH 28 (Lat: 43.049044,  Lng: -74.985200),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 667 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 934 (year 2037),  Design Load: HS 20,  Features Intersected: WEST CANADA CREEK,  Facility Carried by Structure: SHELLS BUSH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.0m (137.8ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 94.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.51m (34.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,298,000,  Roadway Improvement Cost: $760,000,  Total Project Cost: $2,058,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 220463,  Location: 1 MILE NE OF KAST BRIDGE (Lat: 43.075761,  Lng: -74.972336),  Route carried "on" structure: Other road ,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 93 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 130 (year 2037),  Design Load: HS 15,  Features Intersected: NORTH CREEK,  Facility Carried by Structure: FIDDLETOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.188,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.9m (58.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $244,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $387,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 226373,  Location: VILLAGE OF HERKIMER (Lat: 43.022228,  Lng: -74.978719),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 2,002 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,803 (year 2037),  Features Intersected: HYDRAULIC CANAL,  Facility Carried by Structure: EAST STEELE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 84.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $247,000,  Total Project Cost: $670,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226375,  Location: VILLAGE OF HERKIMER (Lat: 43.024022,  Lng: -74.981344),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1971,  Status: Posted for load,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 477 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 668 (year 2038),  Design Load: H 20,  Features Intersected: HYDRAULIC CANAL,  Facility Carried by Structure: EAST SMITH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $733,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226682,  Location: VILLAGE OF HERKIMER (Lat: 43.026656,  Lng: -74.997442),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 4,125 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,011 (year 2040),  Features Intersected: BELLINGER BROOK,  Facility Carried by Structure: WEST GERMAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $523,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $829,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226683,  Location: VILLAGE OF HERKIMER (Lat: 43.027125,  Lng: -74.997525),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 463 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 572 (year 2040),  Features Intersected: BELLINGER BROOK,  Facility Carried by Structure: MAPLE GROVE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $249,000,  Total Project Cost: $674,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33077,  Location: 0.1 MILE EAST OF NYS RT28 (Lat: 43.070908,  Lng: -74.989458),  Route carried "on" structure: ServiceCounty highway ,  Year Built: 1999,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 723 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,012 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: WEST CANADA CREEK,  Facility Carried by Structure: WEST END ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,654,000,  Roadway Improvement Cost: $969,000,  Total Project Cost: $2,623,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5002419,  Location: 1MI EAST OF HERKIMER (Lat: 43.017628,  Lng: -75.009539),  Route carried "on" structure: Interstate 90,  Year Built: 1994,  Status: Open,  Structure Length: 22.49m (73.79ft),  Average Daily Traffic: 19,222 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 22,147 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NY Route 5 EB, RTE 5, We
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.428,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 32.0m (105.0ft),  Skew: 25 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 83.5m (274.0ft),  Curb-To-Curb Width: 31.9m (104.7ft),  Out-to-Out Width: 33.9m (111.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.49m (73.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $14,057,000,  Roadway Improvement Cost: $8,232,000,  Total Project Cost: $22,288,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5516049,  Location: RTE I-90 AT INT 30 (Lat: 43.017869,  Lng: -74.989578),  Route carried "on" structure: Interstate 90,  Year Built: 1955,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 18,320 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 21,108 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: EXIT 30 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.166,  Lanes on structure: 5,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 32.3m (106.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 36.7m (120.4ft),  Out-to-Out Width: 38.1m (125.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,123,000,  Roadway Improvement Cost: $1,243,000,  Total Project Cost: $3,366,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1020079,  Location: MOHAWK ST RT 28 (Lat: 43.017522,  Lng: -74.993569),  Route carried "under" structure: State highway 28,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 13,383 (year 2000),  Features Intersected: NYS Route 28 SB, RTE 28,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 18.262,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 5002419,  Location: 1MI EAST OF HERKIMER (Lat: 43.017628,  Lng: -75.009539),  Route carried "under" structure: State highway 5,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 11,915 (year 2000),  Features Intersected: NY Route 5 EB, RTE 5, We,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 16.669,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 83.5m (274.0ft)

Find on map >>   Show street view

Structure Number: 5002419,  Location: 1MI EAST OF HERKIMER (Lat: 43.017628,  Lng: -75.009539),  Route carried "under" structure: State highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2021),  Features Intersected: NY Route 5 EB, RTE 5, We,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 7.42m (24.34ft),  Kilometerpoint: 16.669,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 83.5m (274.0ft)

Find on map >>   Show street view

Structure Number: 5516049,  Location: RTE I-90 AT INT 30 (Lat: 43.017869,  Lng: -74.989578),  Route carried "under" structure: Ramp Interstate ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2021),  Features Intersected: EXIT 30 RAMP,  Facility Carried by Structure: RTE I90
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 353.497,  Lanes on structure: 5,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 7020081,  Location: 02MI W INT 30 RTE 90I (Lat: 43.019417,  Lng: -74.991814),  Route carried "under" structure: State highway 28,  Year Built: 1943,  Structure Length: 0. m,  Average Daily Traffic: 13,202 (year 2000),  Features Intersected: RTE 28,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.31m (14.14ft),  Kilometerpoint: 18.504,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 7020082,  Location: 02MI W INT 30 RTE 90I (Lat: 43.019328,  Lng: -74.991897),  Route carried "under" structure: State highway 28,  Year Built: 1943,  Structure Length: 0. m,  Average Daily Traffic: 13,202 (year 2000),  Features Intersected: RTE 28,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 18.504,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 771438,  Location: AT HERKIMER (Lat: 43.020567,  Lng: -74.980944),  Route carried "under" structure: State highway 922B,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 2,750 (year 1984),  Features Intersected: RTE 922B,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 771439,  Location: AT HERKIMER (Lat: 43.019764,  Lng: -74.984736),  Route carried "under" structure: City street ,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 150 (year 2021),  Features Intersected: DEWEY AVENUE,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 77144,  Location: HERKIMER (Lat: 43.021572,  Lng: -74.977561),  Route carried "under" structure: City street ,  Year Built: 1941,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2021),  Features Intersected: DUMP ROAD, HYDRAULIC CAN,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.0m (68.9ft)

Discuss Herkimer, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.