Bridge Statistics for Highland Lake, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 75ft / 23.4mTotal length
  • $5,671,000Total costs
  • 7,114Total average daily traffic
  • 295Total average daily truck traffic
  • 10,477Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Highland Lake
  • No street view available for this location

New bridges in Highland Lake, AL - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 31950-1959
  • 21970-1979
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 22010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 62.5%Satisfactory
  • 12.5%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 25.0%Satisfactory
  • 37.5%Fair
  • 25.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 41.7%Satisfactory
  • 50.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1496,  Location: 0.3 MI E ALA HWY 53 (Lat: 34.923369,  Lng: -86.760667),  Route carried "on" structure: County highway 114,  Year Built: 1936,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 200 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 240 (year 2034),  Design Load: H 15,  Features Intersected: SWEETWATER BRANCH,  Facility Carried by Structure: SHADY GROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $175,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $193,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2738,  Location: 6 MI S OF ONEONTA (Lat: 33.860692,  Lng: -86.445819),  Route carried "on" structure: County highway 234,  Year Built: 1942,  Status: Closed,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 106 (year 2015),  Average Future Daily Traffic: 158 (year 2035),  Features Intersected: BLACKBURN FORK,  Facility Carried by Structure: DUMAS BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Fair,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2015,  Critical Feature Inspection Date: January 2015,  Other Special Inspection Date: January 2016,  Bridge Improvement Cost: $314,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $345,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 4691,  Location: 1/2 MI S OF APPALACHAIN (Lat: 33.880608,  Lng: -86.401156),  Route carried "on" structure: County highway 29,  Year Built: 1953,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 392 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 582 (year 2041),  Design Load: H 15,  Features Intersected: BRASHER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $469,000,  Roadway Improvement Cost: $47,000,  Total Project Cost: $516,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4976,  Location: 3 1/2 SOUTH OF CHAMPION (Lat: 33.897400,  Lng: -86.416100),  Route carried "on" structure: County highway 29,  Year Built: 1954,  Status: Posted for load,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 1,865 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,772 (year 2041),  Design Load: H 15,  Features Intersected: HIGHLAND LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 4.17m (13.68ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Underwater Inspection Date: October 2018,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $66,000,  Total Project Cost: $724,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 5755,  Location: 4 MI N OF HOLLY SPRINGS (Lat: 33.865719,  Lng: -86.443364),  Route carried "on" structure: County highway 27,  Year Built: 1957,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 2,612 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,881 (year 2041),  Design Load: H 15,  Features Intersected: BLACKBURN FORK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,174,000,  Roadway Improvement Cost: $117,000,  Total Project Cost: $1,291,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12058,  Location: 3 1/2 MI NE OF HOLLY SPRI (Lat: 33.868850,  Lng: -86.441678),  Route carried "on" structure: County highway 211,  Year Built: 1978,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 413 (year 2022),  Truck Traffic: 1%,  Average Future Daily Traffic: 578 (year 2042),  Features Intersected: BLACKBURN FORK OF WARR,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.5m (21.3ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $395,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $435,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 12233,  Location: 1 MI NE OF APPALACHAIN (Lat: 33.888989,  Lng: -86.387881),  Route carried "on" structure: County highway 248,  Year Built: 1979,  Status: Posted for load,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 205 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 304 (year 2041),  Design Load: HS 15,  Features Intersected: BRASHER CREEK,  Facility Carried by Structure: PUTMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 8.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $309,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $340,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1496,  Location: HIGHLAND LAKE (Lat: 33.874678,  Lng: -86.422397),  Route carried "on" structure: County highway 211,  Year Built: 1989,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 362 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 538 (year 2041),  Design Load: HS 20,  Features Intersected: RENO BRASHER CREEK,  Facility Carried by Structure: LAKESHORE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $305,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $336,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1525,  Location: HIGHLAND LAKE (Lat: 33.883533,  Lng: -86.415261),  Route carried "on" structure: County highway 239,  Year Built: 1990,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 305 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 453 (year 2041),  Design Load: HS 15,  Features Intersected: BRASHER CREEK/ANCHOR,  Facility Carried by Structure: LAKESHORE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $293,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18299,  Location: 5 1/2 MI SE OF ONEONTA (Lat: 33.905767,  Lng: -86.394139),  Route carried "on" structure: County highway 252,  Year Built: 2002,  Status: Open,  Structure Length: 1.47m (4.82ft),  Average Daily Traffic: 330 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 491 (year 2041),  Design Load: HS 20,  Features Intersected: LITTLE WARRIOR RIVER,  Facility Carried by Structure: COUNTY HWY 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.8m (15.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Fair,  Culverts: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.15m (7.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $459,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $505,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20771,  Location: 6 MI E OF ONEONTA (Lat: 33.922422,  Lng: -86.383653),  Route carried "on" structure: County highway 201,  Year Built: 2013,  Status: Posted for load,  Structure Length: 1.87m (6.14ft),  Average Daily Traffic: 75 (year 2021),  Average Future Daily Traffic: 111 (year 2041),  Features Intersected: LITTLE WARRIOR RIVER,  Facility Carried by Structure: ROGERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 19.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $267,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $294,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 21545,  Location: 6 MI S OF ONEONTA (Lat: 33.862361,  Lng: -86.442219),  Route carried "on" structure: County highway 241,  Year Built: 2019,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 249 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 369 (year 2041),  Design Load: HS 20,  Features Intersected: BLACKBURN FORK,  Facility Carried by Structure: JONES CHAPEL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 83.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place