Bridge Statistics for Hillsborough, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 230ft / 69.7mTotal length
  • $69,124,000Total costs
  • 92,691Total average daily traffic
  • 6,437Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hillsborough
  • No street view available for this location

New bridges in Hillsborough, NH - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 51900-1909
  • 21910-1919
  • 11930-1939
  • 11950-1959
  • 11960-1969
  • 11980-1989
  • 142000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Hillsborough, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 41990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Hillsborough, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Excellent
  • 26.7%Very good
  • 33.3%Good
  • 20.0%Satisfactory
  • 13.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.7%Excellent
  • 33.3%Very good
  • 33.3%Good
  • 6.7%Satisfactory
  • 13.3%Fair
  • 6.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.3%Very good
  • 60.0%Good
  • 20.0%Satisfactory
  • 6.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 18.8%Very good
  • 50.0%Good
  • 31.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Excellent
  • 14.3%Very good
  • 14.3%Good
  • 14.3%Satisfactory
  • 14.3%Fair
  • 28.6%Poor
Find on map >>   Show street view

Structure Number: 122008800093,  Location: 2.6 MILE FR NH RTE 9 (Lat: 43.144994,  Lng: -71.959397),  Route carried "on" structure: Other road ,  Year Built: 1900,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 81 (year 2020),  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: BEARDS BROOK,  Facility Carried by Structure: GLEASON FALLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.263,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 9.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 5.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 122008900064,  Location: 0.2 MI FR NH RTE 31 (Lat: 43.124589,  Lng: -71.952836),  Route carried "on" structure: Other road ,  Year Built: 1919,  Year Reconstructed: 1936,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 81 (year 2020),  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: SHEDD BROOK,  Facility Carried by Structure: SHEDD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.684,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 4.7m (15.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 12200920009,  Location: 2.7 MI FR NH RTE 9 (Lat: 43.143614,  Lng: -71.955725),  Route carried "on" structure: Other road ,  Year Built: 1900,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: BEARDS BROOK,  Facility Carried by Structure: BEARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.342,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Fair,  Operating Rating: 9.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 6.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 122009300044,  Location: 1.0 MI FR ANTRIM TL (Lat: 43.111458,  Lng: -71.943050),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 733 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,084 (year 2042),  Design Load: HS 15,  Features Intersected: BROOK,  Facility Carried by Structure: SECOND NH TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 68.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 122009300045,  Location: 1.0 MI. ANTRIM TL (Lat: 43.111642,  Lng: -71.943261),  Route carried "on" structure: Other road ,  Year Built: 1900,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 733 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,084 (year 2042),  Design Load: HS 15,  Features Intersected: BROOK,  Facility Carried by Structure: SECOND NH TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.584,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12201000007,  Location: 1.3 MI FR NH RTE 31 (Lat: 43.130264,  Lng: -71.944719),  Route carried "on" structure: Other road ,  Year Built: 1900,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Features Intersected: BEARDS BROOK,  Facility Carried by Structure: JONES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.711,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Masonry,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft)

Condition: Channel: Good,  Culverts: Poor,  Operating Rating: 9.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 6.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 16 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 122010700056,  Location: 0.8 MI FR NH RTE 9 (Lat: 43.121625,  Lng: -71.933528),  Route carried "on" structure: Other road ,  Year Built: 1965,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 400 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 592 (year 2042),  Features Intersected: BEARDS BROOK,  Facility Carried by Structure: BEARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 5.2m (17.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 122011000051,  Location: NH 9 at Beards Brook (Lat: 43.117250,  Lng: -71.929344),  Route carried "on" structure: State highway 9,  Year Built: 2002,  Status: Open,  Structure Length: 12.53m (41.11ft),  Average Daily Traffic: 5,579 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,256 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: BEARDS BROOK,BEARDS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.074,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 57.0m (187.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 12.53m (41.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122011100042,  Location: 0.3MI JCT 9-31-202 (Lat: 43.113117,  Lng: -71.925247),  Route carried "on" structure: State highway 9,  Year Built: 1951,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 2,731 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,041 (year 2042),  Design Load: H 20,  Features Intersected: BEARDS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.756,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 122011200042,  Location: 1.4 MI. RTE. 9 (Lat: 43.112914,  Lng: -71.925056),  Route carried "on" structure: Other road ,  Year Built: 1919,  Year Reconstructed: 1931,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 648 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 959 (year 2042),  Features Intersected: BEARDS BROOK,  Facility Carried by Structure: SAW MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.042,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 122011200051,  Location: JCT NH 9/US202 (Lat: 43.116367,  Lng: -71.917831),  Route carried "on" structure: State highway 9,  Year Built: 2001,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 9,025 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,357 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: US202
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.013,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.4m (76.8ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12201160005,  Location: NH 9 under Bible Hill Ro (Lat: 43.116264,  Lng: -71.921108),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: NH 9,RAMP A,  Facility Carried by Structure: BIBLE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.608,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.48m (31.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122011700035,  Location: 0.5 MI FROM ANTRIM TL (Lat: 43.111514,  Lng: -71.919231),  Route carried "on" structure: US 202,  Year Built: 1988,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 5,748 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,507 (year 2042),  Design Load: HS 20,  Features Intersected: N BRANCH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.572,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.8m (68.2ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122011800045,  Location: Bible Hill Road / US202 (Lat: 43.113872,  Lng: -71.918561),  Route carried "on" structure: Other road ,  Year Built: 2000,  Status: Open,  Structure Length: 3.32m (10.89ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: US202,  Facility Carried by Structure: BIBLE HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.262,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.32m (10.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122013700051,  Location: 2.2MI W HENNIKER T/L (Lat: 43.121389,  Lng: -71.901292),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 3,015 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,462 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: US202,NH 9,  Facility Carried by Structure: CENTER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.935,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122014400033,  Location: .1 MI. FROM JCT. US 202 (Lat: 43.113369,  Lng: -71.894119),  Route carried "on" structure: State highway 149,  Year Built: 1893,  Year Reconstructed: 1940,  Status: Open,  Structure Length: 7.50m (24.61ft),  Average Daily Traffic: 4,243 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,279 (year 2042),  Design Load: H 15,  Features Intersected: CONTOOCOOK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.382,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.0m,  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.50m (24.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 122015200095,  Location: 0.58 MI N GOULD POND JCT (Lat: 43.156489,  Lng: -71.901044),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 81 (year 2020),  Average Future Daily Traffic: 119 (year 2042),  Design Load: HL 93,  Features Intersected: SAND BROOK,  Facility Carried by Structure: BOG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.146,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122015700056,  Location: 1.2MI W HENNIKER T/L (Lat: 43.130367,  Lng: -71.885103),  Route carried "on" structure: Other road ,  Year Built: 2002,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 81 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 119 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: US202,NH 9,  Facility Carried by Structure: OLD HENNIKER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.726,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.3m (142.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.91m (16.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12201580008,  Location: TOWN ROAD (Lat: 43.148472,  Lng: -71.893983),  Route carried "on" structure: Other road ,  Year Built: 2021,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 100 (year 1993),  Truck Traffic: 5%,  Average Future Daily Traffic: 148 (year 2042),  Design Load: HL 93,  Features Intersected: NELSON BROOK,  Facility Carried by Structure: RED FOX CROSSING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.105,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 12201650006,  Location: 0.8MI W HENNIKER T/L (Lat: 43.135917,  Lng: -71.881083),  Route carried "on" structure: US 202,  Year Built: 2002,  Status: Open,  Structure Length: 3.07m (10.07ft),  Average Daily Traffic: 9,025 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 13,357 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: EASTERN CONNECTOR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.922,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.2m (43.3ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.8m (91.2ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122016900081,  Location: 0.4 MI FR. HENNIKER T/L (Lat: 43.150006,  Lng: -71.880869),  Route carried "on" structure: Other road ,  Year Built: 2013,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 300 (year 2007),  Truck Traffic: 4%,  Average Future Daily Traffic: 444 (year 2042),  Design Load: HL 93,  Features Intersected: SAND BROOK,  Facility Carried by Structure: HUMMINGBIRD LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.652,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 122017100064,  Location: 0.3 MI. HENNIKER TL (Lat: 43.136383,  Lng: -71.874456),  Route carried "on" structure: Other road ,  Year Built: 1933,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 403 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 596 (year 2042),  Design Load: H 15,  Features Intersected: CONTOOCOOK RIVER,  Facility Carried by Structure: CONTOOCOOK FALLS R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.521,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Channel: Good,  Operating Rating: 22.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.83m (22.41ft),  Designated Inspection Frequency: Every 16 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: August 2020,  Underwater Inspection Date: September 2017,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 122011000051,  Location: NH 9 at Beards Brook (Lat: 43.117250,  Lng: -71.929344),  Route carried "under" structure: Other road ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 460 (year 2015),  Truck Traffic: 4%,  Features Intersected: BEARDS BROOK,BEARDS RD,  Facility Carried by Structure: NH 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.0m (187.0ft)

Find on map >>   Show street view

Structure Number: 122011200051,  Location: JCT NH 9/US202 (Lat: 43.116367,  Lng: -71.917831),  Route carried "under" structure: Ramp US 202,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 6,300 (year 2014),  Truck Traffic: 7%,  Features Intersected: US202,  Facility Carried by Structure: NH 9
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 1.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 12201160005,  Location: NH 9 under Bible Hill Ro (Lat: 43.116264,  Lng: -71.921108),  Route carried "under" structure: State highway 9,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 6,300 (year 2014),  Truck Traffic: 7%,  Features Intersected: NH 9,RAMP A,  Facility Carried by Structure: BIBLE HILL ROAD
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 122011800045,  Location: Bible Hill Road / US202 (Lat: 43.113872,  Lng: -71.918561),  Route carried "under" structure: US 202,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 6,300 (year 2014),  Truck Traffic: 7%,  Features Intersected: US202,  Facility Carried by Structure: BIBLE HILL ROAD
Minimum Vertical Clearance: 14.48m (47.51ft),  Kilometerpoint: 2.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 122013700051,  Location: 2.2MI W HENNIKER T/L (Lat: 43.121389,  Lng: -71.901292),  Route carried "under" structure: US 202,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 2014),  Truck Traffic: 7%,  Features Intersected: US202,NH 9,  Facility Carried by Structure: CENTER ROAD
Minimum Vertical Clearance: 4.48m (14.70ft),  Kilometerpoint: 3.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 122015700056,  Location: 1.2MI W HENNIKER T/L (Lat: 43.130367,  Lng: -71.885103),  Route carried "under" structure: US 202,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 13,000 (year 2015),  Truck Traffic: 7%,  Features Intersected: US202,NH 9,  Facility Carried by Structure: OLD HENNIKER ROAD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 5.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 12201650006,  Location: 0.8MI W HENNIKER T/L (Lat: 43.135917,  Lng: -71.881083),  Route carried "under" structure: Ramp State highway ,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 8,600 (year 2001),  Truck Traffic: 7%,  Features Intersected: EASTERN CONNECTOR,  Facility Carried by Structure: US202,NH 9
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 6.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.8m (91.2ft)