Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hobart, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 38Number of bridges
  • 614ft / 187mTotal length
  • $104,122,000Total costs
  • 486,438Total average daily traffic
  • 55,884Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hobart
  • No street view available for this location

New bridges in Hobart, WA - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 31960-1969
  • 11980-1989
  • 141990-1999
  • 192000-2009
Average Bridge Daily Traffic in Hobart, WA
Average Bridge Truck Traffic in Hobart, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.7%Very good
  • 70.0%Good
  • 3.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 76.7%Good
  • 3.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.3%Very good
  • 73.3%Good
  • 3.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 46.2%Very good
  • 23.1%Good
  • 23.1%Satisfactory
  • 7.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 3703A,  Location: 1.9 N JCT SR 18 (Lat: 47.418417,  Lng: -122.046306),  Route carried "on" structure: State highway 169,  Year Built: 1950,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 23,098 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 32,614 (year 2039),  Design Load: HS 20,  Features Intersected: CEDAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Bridge Improvement Cost: $936,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $1,872,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 6403A,  Location: 0.2 N JCT SR 18 (Lat: 47.436944,  Lng: -121.978056),  Route carried "on" structure: Ramp State highway 18,  Year Built: 1960,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 5,214 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,362 (year 2039),  Design Load: HS 20,  Features Intersected: HOLDER CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $680,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,360,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6541A,  Location: 4.6 E JCT SR 169 (Lat: 47.435583,  Lng: -121.976222),  Route carried "on" structure: State highway 18,  Year Built: 1961,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 12,547 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 17,716 (year 2039),  Design Load: HS 20,  Features Intersected: HOLDER CR HOBART RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.734,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.27m (30.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,736,000,  Roadway Improvement Cost: $547,000,  Total Project Cost: $5,472,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 13791A,  Location: 3.6 N JCT SR 516 (Lat: 47.405722,  Lng: -122.039556),  Route carried "on" structure: State highway 169,  Year Built: 1991,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 23,098 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 32,614 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: CEDAR RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $3,074,000,  Roadway Improvement Cost: $615,000,  Total Project Cost: $6,149,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567A,  Location: 3.9 E JCT SR 169 (Lat: 47.429500,  Lng: -121.988056),  Route carried "on" structure: State highway 18,  Year Built: 1995,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 16,582 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 23,413 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CAREY CR TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.608,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $1,824,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567B,  Location: 3.9 E JCT SR 169 (Lat: 47.429361,  Lng: -121.987861),  Route carried "on" structure: State highway 18,  Year Built: 1996,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 16,582 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 23,413 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CAREY CR TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.608,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.47m (11.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $912,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $1,824,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567C,  Location: 4.0 E JCT SR 169 (Lat: 47.431222,  Lng: -121.985778),  Route carried "on" structure: State highway 18,  Year Built: 1995,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 16,582 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 23,413 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CAREY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.849,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,680,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $3,360,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567D,  Location: 4.0 E JCT SR 169 (Lat: 47.431167,  Lng: -121.985361),  Route carried "on" structure: State highway 18,  Year Built: 1996,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 16,582 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 23,413 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: CAREY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.881,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.57m (11.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $936,000,  Roadway Improvement Cost: $187,000,  Total Project Cost: $1,872,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567E,  Location: 4.2 E JCT SR 169 (Lat: 47.432361,  Lng: -121.982778),  Route carried "on" structure: County highway ,  Year Built: 1996,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 850 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,068 (year 2033),  Design Load: HS 25 or greater,  Features Intersected: SR 18,  Facility Carried by Structure: SE 188TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,554,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $3,108,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567F,  Location: 4.6 E JCT SR 169 (Lat: 47.435444,  Lng: -121.976111),  Route carried "on" structure: State highway 18,  Year Built: 1996,  Status: Open,  Structure Length: 9.97m (32.71ft),  Average Daily Traffic: 12,547 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 17,716 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: HOLDER CR HOBART RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.734,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.97m (32.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,616,000,  Roadway Improvement Cost: $523,000,  Total Project Cost: $5,232,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567G,  Location: 4.6 E JCT SR 169 (Lat: 47.435278,  Lng: -121.976000),  Route carried "on" structure: Ramp State highway 18,  Year Built: 1996,  Status: Open,  Structure Length: 10.49m (34.42ft),  Average Daily Traffic: 959 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,354 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: HOLDER CR & HOBART RD
Minimum Vertical Clearance: 8.61m (28.25ft),  Kilometerpoint: 0.563,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.49m (34.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,858,000,  Roadway Improvement Cost: $372,000,  Total Project Cost: $3,715,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567H,  Location: 4.6 E JCT SR 169 (Lat: 47.434533,  Lng: -121.973078),  Route carried "on" structure: County highway 18,  Year Built: 1996,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 8,691 (year 2010),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,662 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: HOLDER CREEK,  Facility Carried by Structure: ISSAQUAH-HOBART RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $588,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $1,176,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14567I,  Location: 3.9 E JCT SR 169 (Lat: 47.430278,  Lng: -121.987500),  Route carried "on" structure: State highway 18,  Year Built: 1995,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 16,582 (year 2019),  Truck Traffic: 16%,  Average Future Daily Traffic: 23,413 (year 2039),  Features Intersected: CAREY CREEK TRIBUTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.640,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 3.4m (11.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2018,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,024,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16611A,  Location: 5.2 N JCT SR 516 (Lat: 47.406067,  Lng: -122.041703),  Route carried "on" structure: State highway 18,  Year Built: 2005,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: CEDAR RIVER, SE BAIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.699,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.70m (35.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,018,000,  Roadway Improvement Cost: $604,000,  Total Project Cost: $6,037,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611B,  Location: 5.2 N JCT SR 516 (Lat: 47.406194,  Lng: -122.042056),  Route carried "on" structure: State highway 18,  Year Built: 2004,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: CEDAR RIVER, SE BAIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.699,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.70m (35.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,370,000,  Roadway Improvement Cost: $674,000,  Total Project Cost: $6,739,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611C,  Location: JCT SR 169 (Lat: 47.408194,  Lng: -122.038611),  Route carried "on" structure: State highway 18,  Year Built: 2005,  Status: Open,  Structure Length: 15.88m (52.10ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: SR 169,MAXWELL,TAYLOR CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.037,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.88m (52.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $4,376,000,  Roadway Improvement Cost: $875,000,  Total Project Cost: $8,753,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611D,  Location: JCT SR 169 (Lat: 47.408444,  Lng: -122.038750),  Route carried "on" structure: State highway 18,  Year Built: 2004,  Status: Open,  Structure Length: 18.38m (60.30ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: SR 169,MAXWELL,TAYLOR CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.037,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.38m (60.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $5,789,000,  Roadway Improvement Cost: $1,158,000,  Total Project Cost: $11,578,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611E,  Location: 0.01 MI N OF SR-18 (Lat: 47.409142,  Lng: -122.037339),  Route carried "on" structure: County highway 82321,  Year Built: 2005,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 1,600 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,000 (year 2039),  Design Load: HL 93,  Features Intersected: TAYLOR CREEK,  Facility Carried by Structure: NORVYDAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 11.2m (36.7ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $735,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,470,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611F,  Location: 0.1 S JCT SR 18 (Lat: 47.414389,  Lng: -122.015717),  Route carried "on" structure: County highway 18,  Year Built: 2005,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 2,212 (year 2005),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,898 (year 2036),  Design Load: HL 93,  Features Intersected: TAYLOR CREEK,  Facility Carried by Structure: SE 244TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.13m (6.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,064,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611G,  Location: 1.2 E JCT SR 169 (Lat: 47.415844,  Lng: -122.016014),  Route carried "on" structure: State highway 18,  Year Built: 2005,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: 244TH AVE SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.952,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $976,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $1,952,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611H,  Location: 1.2 E JCT SR 169 (Lat: 47.415583,  Lng: -122.015889),  Route carried "on" structure: State highway 18,  Year Built: 2006,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: 244TH AVE SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.952,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.72m (12.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,269,000,  Roadway Improvement Cost: $254,000,  Total Project Cost: $2,538,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611J,  Location: 1.2 E JCT SR 169 (Lat: 47.416139,  Lng: -122.015611),  Route carried "on" structure: Ramp State highway 18,  Year Built: 2005,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 420 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 593 (year 2039),  Design Load: HL 93,  Features Intersected: 244TH AVE SE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,285,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611K,  Location: 1.4 E JCT SR 169 (Lat: 47.417167,  Lng: -122.012400),  Route carried "on" structure: State highway 18,  Year Built: 2005,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: TAYLOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.274,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,152,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $2,304,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611L,  Location: 1.4 E JCT SR 169 (Lat: 47.417072,  Lng: -122.012053),  Route carried "on" structure: State highway 18,  Year Built: 2006,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: TAYLOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.274,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.9m (144.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,152,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $2,304,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611M,  Location: 1.4 E JCT SR 169 (Lat: 47.416869,  Lng: -122.012183),  Route carried "on" structure: Ramp State highway 18,  Year Built: 2006,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 454 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 641 (year 2039),  Design Load: HL 93,  Features Intersected: TAYLOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.4m (139.1ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $835,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $1,670,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611N,  Location: 1.6 E JCT SR 169 (Lat: 47.418467,  Lng: -122.007650),  Route carried "on" structure: State highway 18,  Year Built: 2005,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: TAYLOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.660,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $880,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $1,760,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611O,  Location: 1.6 E JCT SR 169 (Lat: 47.418433,  Lng: -122.007617),  Route carried "on" structure: State highway 18,  Year Built: 2004,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 17,679 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 24,962 (year 2039),  Design Load: HL 93,  Features Intersected: TAYLOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.660,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 14.4m (47.2ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,078,000,  Roadway Improvement Cost: $216,000,  Total Project Cost: $2,156,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16611P,  Location: 2.1 E JCT SR 169 (Lat: 47.422283,  Lng: -121.999144),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 11.95m (39.21ft),  Average Daily Traffic: 1,800 (year 2012),  Average Future Daily Traffic: 2,196 (year 2033),  Design Load: HL 93,  Features Intersected: SR 18,  Facility Carried by Structure: SE 200TH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.180,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 44.2m (145.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.95m (39.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,136,000,  Roadway Improvement Cost: $627,000,  Total Project Cost: $6,272,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 82561,  Location: 1.5 MI N KENT KANGL RD (Lat: 47.374644,  Lng: -121.971600),  Route carried "on" structure: County highway 93690,  Year Built: 1982,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 4,675 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,000 (year 2038),  Design Load: HS 20,  Features Intersected: CEDAR RIVER,  Facility Carried by Structure: LANDSBURG ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.02m (13.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,056,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $2,112,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 86087,  Location: 0.05 MI E OF SR-169 (Lat: 47.407019,  Lng: -122.037539),  Route carried "on" structure: County highway 98571,  Year Built: 1994,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 6,082 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,669 (year 2040),  Design Load: HS 20,  Features Intersected: CEDAR RIVER TRAIL,  Facility Carried by Structure: SE 216TH WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft)

Condition: Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,034,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 86104,  Location: 4.2 E ISSAQ-HOBART (Lat: 47.414722,  Lng: -121.887917),  Route carried "on" structure: County highway 81540,  Year Built: 1994,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 200 (year 2020),  Average Future Daily Traffic: 300 (year 2040),  Design Load: HS 20,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: SE 208TH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $546,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87196,  Location: 1 MI E SR-169 ON SE 248TH (Lat: 47.379944,  Lng: -122.017333),  Route carried "on" structure: County highway 14150,  Year Built: 2003,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 455 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 600 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: ROCK CREEK,  Facility Carried by Structure: SE 248TH ST
Minimum Vertical Clearance: 3.35m (10.99ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.57m (14.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,280,000,  Roadway Improvement Cost: $456,000,  Total Project Cost: $4,560,000 ( Estimate for 2014),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6541A,  Location: 4.6 E JCT SR 169 (Lat: 47.435583,  Lng: -121.976222),  Route carried "under" structure: County highway ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 8,691 (year 2010),  Truck Traffic: 5%,  Features Intersected: HOLDER CR HOBART RD,  Facility Carried by Structure: SR 18
Minimum Vertical Clearance: 10.24m (33.60ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 14567E,  Location: 4.0 E JCT SR 169 (Lat: 47.432361,  Lng: -121.982778),  Route carried "under" structure: State highway 18,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 25,094 (year 2019),  Truck Traffic: 16%,  Features Intersected: SR 18
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 32.123,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 14567F,  Location: 4.6 E JCT SR 169 (Lat: 47.435444,  Lng: -121.976111),  Route carried "under" structure: County highway ,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 8,691 (year 2010),  Truck Traffic: 5%,  Features Intersected: HOLDER CR HOBART RD,  Facility Carried by Structure: SR 18
Minimum Vertical Clearance: 9.68m (31.76ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 16611C,  Location: 3.8 N JCT SR 516 (Lat: 47.408194,  Lng: -122.038611),  Route carried "under" structure: State highway 169,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 23,098 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 169,MAXWELL,TAYLOR CR,  Facility Carried by Structure: SR 18
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 24.478,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 16611D,  Location: 3.8 N JCT SR 516 (Lat: 47.408444,  Lng: -122.038750),  Route carried "under" structure: State highway 169,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 23,098 (year 2019),  Truck Traffic: 4%,  Features Intersected: SR 169,MAXWELL,TAYLOR CR,  Facility Carried by Structure: SR 18
Minimum Vertical Clearance: 8.84m (29.00ft),  Kilometerpoint: 24.510,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 16611P,  Location: 2.1 E JCT SR 169 (Lat: 47.422283,  Lng: -121.999144),  Route carried "under" structure: State highway 18,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 33,164 (year 2019),  Truck Traffic: 16%,  Features Intersected: SR 18,  Facility Carried by Structure: SE 200TH
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 30.481,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Discuss Hobart, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.