  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 121ft / 36.7mTotal length
  • $7,063,000Total costs
  • 21,040Total average daily traffic
  • 2,224Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Homeland
  • No street view available for this location

New bridges in Homeland, GA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 71950-1959
  • 11990-1999
Average Bridge Daily Traffic in Homeland, GA
Average Bridge Truck Traffic in Homeland, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Very good
  • 42.9%Satisfactory
  • 28.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 71.4%Good
  • 28.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 71.4%Good
  • 28.6%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 28.6%Very good
  • 28.6%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 490007,  Location: 6 MI N OF FOLKSTON (Lat: 30.907958,  Lng: -82.071869),  Route carried "on" structure: US 1,  Year Built: 1947,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 6,330 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,495 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LITTLE SPANISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $879,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 490009,  Location: 2 MI N OF FOLKSTON (Lat: 30.871889,  Lng: -82.015039),  Route carried "on" structure: US 1,  Year Built: 1958,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 3,060 (year 2012),  Truck Traffic: 34%,  Average Future Daily Traffic: 4,590 (year 2032),  Design Load: HS 20,  Features Intersected: SR 23S-039.20N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.37m (37.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 49001,  Location: 2 MI N OF FOLKSTON (Lat: 30.872828,  Lng: -82.018297),  Route carried "on" structure: US 1,  Year Built: 1958,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 3,060 (year 2012),  Truck Traffic: 34%,  Average Future Daily Traffic: 4,590 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CSX RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 11 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.34m (40.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $758,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $1,137,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 49004,  Location: 6 MI N OF FOLKSTON (Lat: 30.907219,  Lng: -82.076658),  Route carried "on" structure: County highway 618,  Year Built: 1954,  Status: Posted for load,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 350 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 525 (year 2032),  Design Load: H 10,  Features Intersected: LITTLE SPANISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 11.31m (37.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 490044,  Location: 6 MI N OF FOLKSTON (Lat: 30.850247,  Lng: -82.073778),  Route carried "on" structure: County highway 1225,  Year Built: 1950,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 190 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 285 (year 2032),  Design Load: H 15,  Features Intersected: SPANISH CREEK TRIB.,  Facility Carried by Structure: SPANISH CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 490045,  Location: 8 MI NW OF FOLKSTON (Lat: 30.873897,  Lng: -82.081800),  Route carried "on" structure: County highway 1225,  Year Built: 1950,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 190 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 285 (year 2032),  Design Load: H 15,  Features Intersected: SPANISH CREEK TRIB.,  Facility Carried by Structure: SPANISH CREEK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 490052,  Location: 6 MI N OF FOLKSTON (Lat: 30.907869,  Lng: -82.072078),  Route carried "on" structure: US 1,  Year Built: 1992,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 6,330 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,495 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LITTLE SPANISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.703,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $586,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $879,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 495038,  Location: 2 MI NW OF FOLKSTON (Lat: 30.849308,  Lng: -82.070289),  Route carried "on" structure: County highway 56,  Year Built: 1950,  Status: Posted for load,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 10,  Features Intersected: SPANISH CREEK,  Facility Carried by Structure: PAXTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 11.31m (37.11ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $625,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $938,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 495052,  Location: 5 MI N OF FOLKSTON (Lat: 30.890939,  Lng: -82.081419),  Route carried "on" structure: County highway 95,  Year Built: 1950,  Status: Posted for load,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 80 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 120 (year 2032),  Design Load: H 15,  Features Intersected: SPANISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 11.80m (38.71ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $688,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $1,032,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 490009,  Location: 2 MI N OF FOLKSTON (Lat: 30.871889,  Lng: -82.015039),  Route carried "under" structure: US 301,  Structure Length: 0. m,  Average Daily Traffic: 960 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 4N -007.09N,  Facility Carried by Structure: SR 4 US 1 (NBL) /
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 62.764,  Lanes on structure: 2,  Length of Maximum Span: 0.0m