Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hooksett, New Hampshire (NH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 144ft / 44.4mTotal length
  • $25,136,000Total costs
  • 373,233Total average daily traffic
  • 32,048Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hooksett
  • No street view available for this location

New bridges in Hooksett, NH - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 101970-1979
  • 11980-1989
Reconstructed bridges in Hooksett, NH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
  • 01990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Hooksett, NH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 42.9%Good
  • 42.9%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 57.1%Good
  • 42.9%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 85.7%Good
  • 14.3%Satisfactory
Find on map >>   Show street view

Structure Number: 128006800099,  Location: AT JCT. WITH FEET. (Lat: 43.056022,  Lng: -71.471433),  Route carried "on" structure: Ramp Other road 93,  Year Built: 1976,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 8.17m (26.80ft),  Average Daily Traffic: 658 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 973 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: FEE TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.964,  Lanes on structure: 1,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 43.6m (143.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.17m (26.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 128006900162,  Location: .5 MI SO. BOW TL (Lat: 43.102503,  Lng: -71.474975),  Route carried "on" structure: City street ,  Year Built: 1978,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 8.32m (27.30ft),  Average Daily Traffic: 1,999 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,958 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I-93,FEE TPK,  Facility Carried by Structure: PINE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.764,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.2m (145.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.32m (27.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 128007100114,  Location: 2.2 MI NO. MANCHESTER TL (Lat: 43.069111,  Lng: -71.471747),  Route carried "on" structure: Interstate 93,  Year Built: 1956,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 65,699 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 97,234 (year 2042),  Design Load: HS 20,  Features Intersected: CROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.945,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 42.4m (139.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 42.4m (139.1ft),  Out-to-Out Width: 44.2m (145.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 128007100134,  Location: 2.5 MI N. MANCHESTER T.L (Lat: 43.083117,  Lng: -71.473208),  Route carried "on" structure: Interstate 93,  Year Built: 1978,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 69,552 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 102,936 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: HACKETT HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.506,  Lanes on structure: 11,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 34.4m (112.9ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 81.7m (268.0ft),  Out-to-Out Width: 90.8m (297.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 128007100138,  Location: 2.7 MI NO MANCHESTER TL (Lat: 43.086278,  Lng: -71.473936),  Route carried "on" structure: Interstate 93,  Year Built: 1957,  Year Reconstructed: 1978,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 64,039 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 94,777 (year 2042),  Design Load: HS 20,  Features Intersected: RAMP A-B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.864,  Lanes on structure: 16,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 35.4m (116.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 42.1m (138.1ft),  Out-to-Out Width: 122.5m (401.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 60.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 128007200136,  Location: 2.6 M NORTH MANCHESTER TL (Lat: 43.085664,  Lng: -71.472567),  Route carried "on" structure: Other road 93,  Year Built: 1978,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 500 (year 2014),  Truck Traffic: 9%,  Average Future Daily Traffic: 740 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I-93 NB OFF RAMP,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.288,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Toll Authority,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 128008000148,  Location: 0.7 MI N JCT US 3 (Lat: 43.095419,  Lng: -71.464436),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 20.57m (67.49ft),  Average Daily Traffic: 16,199 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 23,974 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: MERRIMACK RIVER,PAR,RD,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.227,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 53.3m (174.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 41.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.57m (67.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 128010000166,  Location: 0.7 MI S OF ALLENSTOWN TL (Lat: 43.107506,  Lng: -71.448133),  Route carried "on" structure: US 3,  Year Built: 1981,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 12,535 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 18,551 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: HEADS POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 54.520,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,718,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,142,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 128006800099,  Location: AT JCT. WITH FEET. (Lat: 43.056022,  Lng: -71.471433),  Route carried "under" structure: Interstate 93,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 55,000 (year 2014),  Truck Traffic: 9%,  Features Intersected: FEE TPK
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 7,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.6m (143.0ft)

Find on map >>   Show street view

Structure Number: 128006900162,  Location: .5 MI SO. BOW TL (Lat: 43.102503,  Lng: -71.474975),  Route carried "under" structure: Interstate 93,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 73,052 (year 2015),  Truck Traffic: 9%,  Features Intersected: I-93,FEE TPK,  Facility Carried by Structure: PINE STREET
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 128007100114,  Location: 2.2 MI NO. MANCHESTER TL (Lat: 43.069111,  Lng: -71.471747),  Route carried "under" structure: City street ,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 1,300 (year 2013),  Truck Traffic: 2%,  Features Intersected: CROSS ROAD,  Facility Carried by Structure: I-93,FEE TPK
Minimum Vertical Clearance: 4.19m (13.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 9.1m (29.9ft)

Find on map >>   Show street view

Structure Number: 128007100134,  Location: 2.5 MI N. MANCHESTER T.L (Lat: 43.083117,  Lng: -71.473208),  Route carried "under" structure: City street ,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 2,800 (year 2014),  Truck Traffic: 2%,  Features Intersected: HACKETT HILL ROAD,  Facility Carried by Structure: I-93,FEE TPK RAMP
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 128007100138,  Location: 2.7 MI NO MANCHESTER TL (Lat: 43.086278,  Lng: -71.473936),  Route carried "under" structure: Ramp Interstate 93,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 4,800 (year 1994),  Truck Traffic: 9%,  Features Intersected: RAMP A-B
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 16,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 12.2m (40.0ft)

Find on map >>   Show street view

Structure Number: 128007200136,  Location: 2.6 M NORTH MANCHESTER TL (Lat: 43.085664,  Lng: -71.472567),  Route carried "under" structure: Ramp Interstate 93R,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 4,100 (year 2014),  Truck Traffic: 9%,  Features Intersected: I-93 NB OFF RAMP,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 128008000148,  Location: 0.7 MI N JCT US 3 (Lat: 43.095419,  Lng: -71.464436),  Route carried "under" structure: City street ,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2015),  Features Intersected: MERRIMACK RIVER,PAR,RD,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.3m (174.9ft)

Discuss Hooksett, New Hampshire (NH) on our hugely popular New Hampshire forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.