Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hopewell, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 171ft / 51.9mTotal length
  • $9,901,000Total costs
  • 33,949Total average daily traffic
  • 2,211Total average daily truck traffic
  • 50,364Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hopewell
  • No street view available for this location

New bridges in Hopewell, PA - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 51930-1939
  • 51950-1959
  • 11960-1969
  • 11980-1989
  • 22000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Hopewell, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
  • 11990-1999
  • 32000-2009
Average Bridge Daily Traffic in Hopewell, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.3%Excellent
  • 18.8%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 6.3%Fair
  • 12.5%Poor
  • 6.3%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 17.6%Very good
  • 23.5%Good
  • 17.6%Satisfactory
  • 23.5%Fair
  • 11.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 11.8%Very good
  • 29.4%Good
  • 11.8%Satisfactory
  • 41.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.3%Excellent
  • 15.8%Good
  • 36.8%Satisfactory
  • 26.3%Fair
  • 15.8%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Excellent
  • 33.3%Good
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 1924,  Location: 0.3 MI. N.W. OF SR 4002 (Lat: 40.498322,  Lng: -79.978942),  Route carried "on" structure: State highway ,  Year Built: 1931,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 11,703 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 17,328 (year 2032),  Features Intersected: GIRTYS RUN,  Facility Carried by Structure: BABCOCK BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.064,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $109,000
Find on map >>   Show street view

Structure Number: 3727,  Location: 200' S.W. OF TWP.RD.370 (Lat: 40.532283,  Lng: -80.434483),  Route carried "on" structure: State highway ,  Year Built: 1934,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 285 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 513 (year 2032),  Design Load: HS 20,  Features Intersected: LITTLE SERVICE RUN,  Facility Carried by Structure: KENDALL HARSHAV RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.112,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $10,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $137,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4139,  Location: 0.6 MILE SOUTH OF TR 26 (Lat: 40.131564,  Lng: -78.266361),  Route carried "on" structure: State highway 915,  Year Built: 1959,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 767 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,006 (year 2032),  Design Load: HL 93,  Features Intersected: SANDY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.024,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $89,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $1,206,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4198,  Location: 1.3 MILE EAST OF CYPHER (Lat: 40.091508,  Lng: -78.293939),  Route carried "on" structure: State highway ,  Year Built: 1937,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 158 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 399 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: RAYSTOWN BR.JUNIATA RIV.,  Facility Carried by Structure: SR 1020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.704,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2020,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $644,000,  Total Project Cost: $2,953,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 42,  Location: 2.8 MILE EAST OF SR 1009 (Lat: 40.077750,  Lng: -78.286247),  Route carried "on" structure: State highway ,  Year Built: 1950,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 158 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 399 (year 2032),  Design Load: HS 20,  Features Intersected: SHERMAN VALLEY RUN,  Facility Carried by Structure: SR 1020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.857,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $63,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $845,000,  Deck Structure Type: Closed Grating,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4202,  Location: 3.0 MILE EAST OF SR 1009 (Lat: 40.077064,  Lng: -78.283442),  Route carried "on" structure: State highway ,  Year Built: 1950,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 158 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 399 (year 2032),  Design Load: H 20,  Features Intersected: SHERMAN VALLEY RUN,  Facility Carried by Structure: SR 1020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.259,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4495,  Location: 1 MI.NW.OF HOPEWELL (Lat: 40.139589,  Lng: -78.275881),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1977,  Status: Posted for load,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 62 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 87 (year 2041),  Design Load: H 15,  Features Intersected: YELLOW CREEK,  Facility Carried by Structure: T526,Polecat Hlw R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $335,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4496,  Location: 1 MI.SE.OF YELLOW CREEK (Lat: 40.124286,  Lng: -78.317133),  Route carried "on" structure: City street ,  Year Built: 1884,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 3.02m (9.91ft),  Average Daily Traffic: 45 (year 2021),  Average Future Daily Traffic: 48 (year 2041),  Design Load: H 10,  Features Intersected: YELLOW CREEK,  Facility Carried by Structure: T539,St Paul Ch Rd
Minimum Vertical Clearance: 2.97m (9.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.2m (10.5ft),  Out-to-Out Width: 3.9m (12.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $92,000,  Roadway Improvement Cost: $272,000,  Total Project Cost: $1,247,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 4497,  Location: 3 MI.SE.OF LOYSBURG (Lat: 40.135889,  Lng: -78.328292),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Posted for load,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 60 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 45 (year 2041),  Design Load: HS 20,  Features Intersected: YELLOW CREEK,  Facility Carried by Structure: T557,Yellow Crk Dr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 23.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $22,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $292,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4498,  Location: .5 MI.NW.HOPEWELL (Lat: 40.138100,  Lng: -78.271297),  Route carried "on" structure: City street ,  Year Built: 1889,  Year Reconstructed: 2011,  Status: Posted for load,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 20 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 25 (year 2041),  Design Load: H 10,  Features Intersected: YELLOW CREEK,  Facility Carried by Structure: T-655, Langdon Dr
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 2.7m (8.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 3.5m (11.5ft),  Out-to-Out Width: 4.0m (13.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $96,000,  Roadway Improvement Cost: $283,000,  Total Project Cost: $1,297,000,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 19226,  Location: DIAMONDVILLE NO.1 (Lat: 40.662947,  Lng: -78.968894),  Route carried "on" structure: State highway ,  Year Built: 1935,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 437 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 515 (year 2032),  Design Load: H 20,  Features Intersected: TWO LICK CREEK,  Facility Carried by Structure: SR1012
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.809,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $25,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $332,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 28275,  Location: GULPH MILLS INTERC.34K04 (Lat: 40.067781,  Lng: -75.343419),  Route carried "on" structure: Ramp State highway ,  Year Built: 1950,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 11,094 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,965 (year 2032),  Design Load: HS 20,  Features Intersected: GULPH CREEK / 3367-F10,  Facility Carried by Structure: RAMPS B & C OFF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 31031,  Location: I-81 RAMP M OVER PA 309 (Lat: 40.881836,  Lng: -76.001567),  Route carried "on" structure: Ramp State highway ,  Year Built: 1967,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 4,344 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,829 (year 2032),  Design Load: HL 93,  Features Intersected: PA 309,  Facility Carried by Structure: SR 8017 (RAMP M)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.1m (79.1ft),  Curb-To-Curb Width: 14.5m (47.6ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.50m (18.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $21,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $287,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 33009,  Location: 0.5 MI SW OF MORRIS RUN (Lat: 41.662639,  Lng: -77.039597),  Route carried "on" structure: State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 974 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,265 (year 2032),  Features Intersected: OVER MORRIS RUN,  Facility Carried by Structure: SR 2014
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.068,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $111,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 42609,  Location: 1.4 MILE EAST OF SR 1009 (Lat: 40.090842,  Lng: -78.295483),  Route carried "on" structure: State highway ,  Year Built: 2004,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 158 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 399 (year 2032),  Design Load: HL 93,  Features Intersected: PIPERS RUN,  Facility Carried by Structure: SR 1020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.704,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 45571,  Location: 49 FEET SOUTH OF SR 1019 (Lat: 40.143967,  Lng: -78.296647),  Route carried "on" structure: State highway 26,  Year Built: 2009,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,811 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,257 (year 2032),  Design Load: HL 93,  Features Intersected: BANK RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.936,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2019,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 47355,  Location: 2.9 MILE EAST OF SR 1009 (Lat: 40.076278,  Lng: -78.285267),  Route carried "on" structure: State highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 158 (year 2022),  Truck Traffic: 11%,  Average Future Daily Traffic: 399 (year 2032),  Design Load: HL 93,  Features Intersected: SHERMAN VALLEY RUN,  Facility Carried by Structure: SR 1020
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.857,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 37.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54086,  Location: 2 MI EAST OF SR 26 (Lat: 40.097800,  Lng: -78.316472),  Route carried "on" structure: State highway ,  Year Built: 2018,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 586 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 464 (year 2032),  Design Load: HL 93,  Features Intersected: PIPERS RUN,  Facility Carried by Structure: Cypher Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.014,  Lanes on structure: 2,  Owner: State Highway Agency,  Maintenance Responsibility: Private,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 70.6 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 57355,  Location: 378 FEET SOUTH OF TR 26 (Lat: 40.137611,  Lng: -78.267278),  Route carried "on" structure: State highway 915,  Year Built: 2019,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 767 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 800 (year 2030),  Design Load: HL 93,  Features Intersected: RAYSTOWN BR JUNIATA RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.386,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.40m (30.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 68425,  Location: 170 FEET EAST OF PA 915 (Lat: 40.129444,  Lng: -78.248064),  Route carried "on" structure: State highway ,  Year Built: 2021,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 204 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 222 (year 2032),  Design Load: HL 93,  Features Intersected: SANDY RUN,  Facility Carried by Structure: T134 LONGS RUN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Discuss Hopewell, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.