Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Hornbeak, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 52ft / 15.8mTotal length
  • $495,000Total costs
  • 3,394Total average daily traffic
  • 150Total average daily truck traffic
  • 5,430Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hornbeak
  • No street view available for this location

New bridges in Hornbeak, TN - historical statistics
  • New bridges - historical statistics
  • 11970-1979
  • 61980-1989
  • 11990-1999
  • 22000-2009
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 25.0%Satisfactory
  • 25.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 66015300005,  Location: 4.6 MI NE JCT SR21&SR183 (Lat: 36.390444,  Lng: -89.256250),  Route carried "on" structure: County highway 5742,  Year Built: 2001,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 170 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 272 (year 2041),  Design Load: HS 20,  Features Intersected: SO. REELFOOT CREEK,  Facility Carried by Structure: NFA 1530 (SA 6613)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.801,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 660A0320001,  Location: 2.7 MI NE JCT SR21&SR183 (Lat: 36.333444,  Lng: -89.253556),  Route carried "on" structure: County highway 32,  Year Built: 1970,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 112 (year 2039),  Design Load: H 15,  Features Intersected: ROGERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.671,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $299,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 660A0370003,  Location: 2.7 MI SW JCT SR21&SR183 (Lat: 36.324583,  Lng: -89.345194),  Route carried "on" structure: County highway 37,  Year Built: 2002,  Status: Open,  Structure Length: 1.09m (3.58ft),  Average Daily Traffic: 110 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 176 (year 2041),  Design Load: HS 20,  Features Intersected: NORTH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.948,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 660A6930001,  Location: 3.5 MI SW JCT SR21&SR184 (Lat: 36.284833,  Lng: -89.315444),  Route carried "on" structure: County highway 693,  Year Built: 1984,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 80 (year 2041),  Design Load: HS 20,  Features Intersected: CLOVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.234,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 660A6950001,  Location: 3.5 MI SW JCT SR21&SR183 (Lat: 36.288000,  Lng: -89.318056),  Route carried "on" structure: County highway 695,  Year Built: 1983,  Status: Closed,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 140 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 224 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.336,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $130,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $196,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 660A6980001,  Location: 2.1 MI S JCT SR21&SR183 (Lat: 36.303722,  Lng: -89.304361),  Route carried "on" structure: County highway 698,  Year Built: 1984,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 70 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 112 (year 2041),  Design Load: HS 20,  Features Intersected: CLOVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.759,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 660A7170001,  Location: 2.3 MI SE JCT SR21&SR183 (Lat: 36.320833,  Lng: -89.259528),  Route carried "on" structure: County highway 717,  Year Built: 1984,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 180 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 288 (year 2041),  Design Load: HS 20,  Features Intersected: ROBINSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.594,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 660A7180001,  Location: 3.2 MI SE JCT SR21&SR183 (Lat: 36.305750,  Lng: -89.250667),  Route carried "on" structure: County highway 718,  Year Built: 1992,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 40 (year 2022),  Truck Traffic: 4%,  Average Future Daily Traffic: 64 (year 2041),  Design Load: HS 20,  Features Intersected: RICHLAND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.917,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 66S80060003,  Location: 4.5 MI.SOUTH OF HORNBEAK (Lat: 36.293056,  Lng: -89.273944),  Route carried "on" structure: State highway 183,  Year Built: 1986,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 965 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,544 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.957,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 66SR0210015,  Location: E. OF HORNBEAK (Lat: 36.338639,  Lng: -89.289611),  Route carried "on" structure: State highway 21,  Year Built: 1980,  Status: Open,  Structure Length: 0.69m (2.26ft),  Average Daily Traffic: 1,599 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,558 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.521,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Discuss Hornbeak, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.