Bridge Statistics for Hyde Park, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 82ft / 25.5mTotal length
  • $22,977,000Total costs
  • 31,163Total average daily traffic
  • 1,216Total average daily truck traffic
  • 37,346Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hyde Park
  • No street view available for this location

New bridges in Hyde Park, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 21920-1929
  • 31960-1969
  • 11970-1979
  • 11980-1989
  • 21990-1999
  • 32010-2019
Reconstructed bridges in Hyde Park, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Hyde Park, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Excellent
  • 33.3%Good
  • 44.4%Satisfactory
  • 11.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Excellent
  • 25.0%Very good
  • 16.7%Good
  • 33.3%Satisfactory
  • 8.3%Fair
  • 8.3%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.0%Very good
  • 25.0%Good
  • 33.3%Satisfactory
  • 8.3%Fair
  • 8.3%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Good
  • 72.7%Satisfactory
Find on map >>   Show street view

Structure Number: 100536,  Location: 0.4 MI N HYDE PARK (Lat: 41.795833,  Lng: -73.938697),  Route carried "on" structure: US 9,  Year Built: 1927,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 9,464 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,508 (year 2040),  Features Intersected: CRUM ELBOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.816,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 10.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,819,000,  Roadway Improvement Cost: $2,236,000,  Total Project Cost: $6,055,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 105037,  Location: IN HYDE PARK (Lat: 41.790656,  Lng: -73.930325),  Route carried "on" structure: County highway ,  Year Built: 1981,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 2,988 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,697 (year 2040),  Design Load: HS 20,  Features Intersected: CRUM ELBOW CREEK,  Facility Carried by Structure: EAST MARKET STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 65.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $900,000,  Roadway Improvement Cost: $527,000,  Total Project Cost: $1,427,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 105038,  Location: 0.8 MI E RT 9 & 9G CONN (Lat: 41.786678,  Lng: -73.923333),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,988 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,697 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CRUM ELBOW CREEK,  Facility Carried by Structure: COUNTY ROAD 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.397,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 26 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,458,000,  Roadway Improvement Cost: $854,000,  Total Project Cost: $2,312,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 234314,  Location: 1.2 MI NW OF PLEASNT PLNS (Lat: 41.857103,  Lng: -73.885336),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 545 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 763 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CRUM ELBOW CREEK,  Facility Carried by Structure: MILLS CROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $396,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334315,  Location: 0.1 MI NW JCT Rt.9G & CR (Lat: 41.841744,  Lng: -73.900267),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 1,649 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,720 (year 2040),  Design Load: HL 93,  Features Intersected: CRUM ELBOW CREEK,  Facility Carried by Structure: NORTH CROSS ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 2.060,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $741,000,  Roadway Improvement Cost: $434,000,  Total Project Cost: $1,175,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 334316,  Location: 2 MI E OF NORRIE ST PARK (Lat: 41.827175,  Lng: -73.897853),  Route carried "on" structure: Other road ,  Year Built: 1964,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 2,695 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,773 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CRUM ELBOW CREEK,  Facility Carried by Structure: SOUTH CROSS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 87.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 67.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $784,000,  Roadway Improvement Cost: $459,000,  Total Project Cost: $1,244,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334317,  Location: 1.9 MI.E.OF EAST PARK (Lat: 41.788972,  Lng: -73.876917),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 4,011 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,962 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FALL KILL,  Facility Carried by Structure: CRUM ELBOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.500,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $399,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $633,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 334318,  Location: 2.3 MI NE OF FAIRVIEW (Lat: 41.748989,  Lng: -73.896333),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 2,011 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,488 (year 2040),  Features Intersected: FALL KILL,  Facility Carried by Structure: EAST DORSEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.496,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 82.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $520,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $824,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336838,  Location: SYCAMORE DR AT CRUM ELBOW (Lat: 41.808108,  Lng: -73.909281),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,132 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,585 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CRUM ELBOW CREEK,  Facility Carried by Structure: Sycamore
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 83.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $380,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $603,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33713,  Location: 0.4 MI E RT 9G J CRUM ELB (Lat: 41.788492,  Lng: -73.907436),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,679 (year 2014),  Average Future Daily Traffic: 5,151 (year 2034),  Design Load: HL 93,  Features Intersected: Maritje Kill,  Facility Carried by Structure: County Road 41
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $527,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $835,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 552178,  Location: .3 MILE SW OF STAATSBURG (Lat: 41.843622,  Lng: -73.935036),  Route carried "on" structure: State lands road ,  Year Built: 1979,  Status: Open,  Structure Length: 5.06m (16.60ft),  Truck Traffic: 4%,  Design Load: H 20,  Features Intersected: CSX TRANS/ AMTRAK,  Facility Carried by Structure: NORRIE STREET PARK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.05m (16.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,481,000,  Roadway Improvement Cost: $867,000,  Total Project Cost: $2,349,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 55218,  Location: .4 MI NORTH OF STAATSBURG (Lat: 41.856942,  Lng: -73.926842),  Route carried "on" structure: State lands road ,  Year Built: 1912,  Status: Open,  Structure Length: 2.19m (7.19ft),  Truck Traffic: 8%,  Features Intersected: CSX, LEASED AMTRA,  Facility Carried by Structure: PARK ENTRANCE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: State Agenciy,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $1,340,000,  Roadway Improvement Cost: $784,000,  Total Project Cost: $2,124,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1797004P,  Location: 0.1 MILES FROM HUDSON RIV (Lat: 41.788889,  Lng: -73.945139),  Route carried "on" structure: Spur Federal lands road 12,  Year Built: 1920,  Status: Closed,  Structure Length: 2.29m (7.51ft),  Average Daily Traffic: 1 (year 2010),  Average Future Daily Traffic: 2 (year 2030),  Features Intersected: CRUM ELBOW CREEK,  Facility Carried by Structure: DOCK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: National Park Service,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Superstructure: Imminent failure,  Substructure: Critical,  Channel: Good,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,000,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,000,000 ( Estimate for 2018)