Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ithaca, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 35Number of bridges
  • 377ft / 115mTotal length
  • $81,222,000Total costs
  • 236,184Total average daily traffic
  • 10,215Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ithaca
  • No street view available for this location

New bridges in Ithaca, NY - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 61930-1939
  • 31950-1959
  • 131960-1969
  • 11980-1989
  • 61990-1999
  • 22000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Ithaca, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 31980-1989
  • 41990-1999
  • 22000-2009
  • 12010-2019
Average Bridge Daily Traffic in Ithaca, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.7%Excellent
  • 7.1%Very good
  • 46.4%Good
  • 28.6%Satisfactory
  • 3.6%Fair
  • 3.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.9%Excellent
  • 13.8%Very good
  • 31.0%Good
  • 27.6%Satisfactory
  • 20.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.4%Excellent
  • 13.8%Very good
  • 27.6%Good
  • 41.4%Satisfactory
  • 10.3%Fair
  • 3.4%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.4%Excellent
  • 13.8%Very good
  • 41.4%Good
  • 27.6%Satisfactory
  • 13.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Excellent
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 101035,  Location: .1 MI S JCT SH 13 & SH 79 (Lat: 42.435892,  Lng: -76.508172),  Route carried "on" structure: State highway 13,  Year Built: 1965,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 19,501 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 19,592 (year 2040),  Design Load: HS 20,  Features Intersected: SIXMILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.993,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.7m (54.8ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $2,318,000,  Roadway Improvement Cost: $1,358,000,  Total Project Cost: $3,676,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101036,  Location: 1.0 MI S JCT RTS 13 + 34 (Lat: 42.450772,  Lng: -76.504231),  Route carried "on" structure: State highway 13,  Year Built: 1965,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 23,657 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,820 (year 2040),  Design Load: HS 20,  Features Intersected: CASCADILLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.779,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 21.8m (71.5ft),  Out-to-Out Width: 22.7m (74.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,344,000,  Roadway Improvement Cost: $787,000,  Total Project Cost: $2,130,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101037,  Location: 0.6 MI S JCT RTS 13 + 34 (Lat: 42.454778,  Lng: -76.500722),  Route carried "on" structure: State highway 13,  Year Built: 1965,  Status: Open,  Structure Length: 3.72m (12.20ft),  Average Daily Traffic: 23,657 (year 2011),  Truck Traffic: 7%,  Average Future Daily Traffic: 30,820 (year 2040),  Design Load: HS 20,  Features Intersected: FALL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.293,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.6m (116.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.71m (12.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,955,000,  Roadway Improvement Cost: $1,145,000,  Total Project Cost: $3,100,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1010381,  Location: JCT OF SH 13 SB & SH 34 (Lat: 42.463553,  Lng: -76.498794),  Route carried "on" structure: State highway 13,  Year Built: 1964,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 9,590 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,493 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.275,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.31m (23.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,089,000,  Roadway Improvement Cost: $1,223,000,  Total Project Cost: $3,313,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1010382,  Location: JCT OF SH 13 NB & SH 34 (Lat: 42.463383,  Lng: -76.498703),  Route carried "on" structure: State highway 13,  Year Built: 1964,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 6.89m (22.60ft),  Average Daily Traffic: 9,590 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 12,493 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.259,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.88m (22.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,494,000,  Roadway Improvement Cost: $875,000,  Total Project Cost: $2,369,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101069,  Location: 0.9 MI NE JCT RTS 13 &13A (Lat: 42.426703,  Lng: -76.527219),  Route carried "on" structure: State highway 13A,  Year Built: 1987,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 4,804 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,835 (year 2040),  Design Load: HS 20,  Features Intersected: COY GLEN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $97,000,  Total Project Cost: $262,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107723,  Location: JUST N JCT SH 79 & INLET (Lat: 42.441108,  Lng: -76.514628),  Route carried "on" structure: Spur State highway 96,  Year Built: 1996,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 10,441 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,683 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FLOOD CONTROL CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.885,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.3m (128.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.37m (24.18ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $2,296,000,  Roadway Improvement Cost: $1,345,000,  Total Project Cost: $3,641,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107724,  Location: IN ITHACA (Lat: 42.443525,  Lng: -76.513861),  Route carried "on" structure: State highway 89,  Year Built: 1997,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 5,201 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,435 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: FLOOD CNT CHANNEL, CAYUG
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 61.5m (201.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.19m (39.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $3,221,000,  Roadway Improvement Cost: $1,886,000,  Total Project Cost: $5,107,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22104,  Location: IN CITY OF ITHACA (Lat: 42.439222,  Lng: -76.512544),  Route carried "on" structure: City street ,  Year Built: 2020,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 1,852 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,593 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA INLET,  Facility Carried by Structure: BRINDLEY STREET
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 97.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.68m (12.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,045,000,  Roadway Improvement Cost: $612,000,  Total Project Cost: $1,656,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221042,  Location: IN CITY OF ITHACA (Lat: 42.434433,  Lng: -76.501469),  Route carried "on" structure: City street ,  Year Built: 1926,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 1,765 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,144 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SIXMILE CREEK,  Facility Carried by Structure: SOUTH ALBANY ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $718,000,  Roadway Improvement Cost: $420,000,  Total Project Cost: $1,138,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221043,  Location: ITHACA (Lat: 42.435333,  Lng: -76.498825),  Route carried "on" structure: City street ,  Year Built: 1968,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 7,535 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,323 (year 2040),  Features Intersected: SIX MILE CREEK,  Facility Carried by Structure: SOUTH CAYUGA ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $1,012,000,  Roadway Improvement Cost: $593,000,  Total Project Cost: $1,604,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 221044,  Location: .5 MI E JCT SH 96B & SH13 (Lat: 42.436900,  Lng: -76.498022),  Route carried "on" structure: City street 96B,  Year Built: 2012,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 8,836 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,733 (year 2040),  Design Load: HL 93,  Features Intersected: SIXMILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.77m (9.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,228,000,  Roadway Improvement Cost: $719,000,  Total Project Cost: $1,946,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221045,  Location: 0.8 MI E JCT RTS 79 + 13 (Lat: 42.438828,  Lng: -76.495219),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 6,416 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,794 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE 79, SIX MILE CREEK,  Facility Carried by Structure: SOUTH AURORA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.2m (33.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $1,505,000,  Roadway Improvement Cost: $881,000,  Total Project Cost: $2,386,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221047,  Location: CITY OF ITHACA (Lat: 42.433244,  Lng: -76.485081),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 5.64m (18.50ft),  Average Daily Traffic: 2,879 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,562 (year 2040),  Design Load: HS 20,  Features Intersected: SIXMILE CREEK,  Facility Carried by Structure: GILES STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.63m (18.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $1,348,000,  Roadway Improvement Cost: $789,000,  Total Project Cost: $2,137,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221049,  Location: CITY OF ITHACA (Lat: 42.447853,  Lng: -76.501889),  Route carried "on" structure: City street ,  Year Built: 1931,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,806 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,234 (year 2040),  Features Intersected: CASCADILLA CREEK,  Facility Carried by Structure: HANCOCK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $686,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $1,088,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 22105,  Location: CITY OF ITHACA (Lat: 42.446925,  Lng: -76.501153),  Route carried "on" structure: City street ,  Year Built: 1920,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 368 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 515 (year 2039),  Features Intersected: CASCADILLA CREEK,  Facility Carried by Structure: MADISON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $377,000,  Total Project Cost: $1,021,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221052,  Location: CITY OF ITHACA (Lat: 42.444753,  Lng: -76.499261),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 4,330 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 5,260 (year 2040),  Features Intersected: CASCADILLA CREEK,  Facility Carried by Structure: NORTH CAYUGA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $834,000,  Roadway Improvement Cost: $488,000,  Total Project Cost: $1,323,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221054,  Location: CITY OF ITHACA (Lat: 42.443858,  Lng: -76.497028),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 778 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 962 (year 2040),  Features Intersected: CASCADILLA CREEK,  Facility Carried by Structure: N TIOGA STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $657,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $1,041,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221055,  Location: CITY OF ITHACA (Lat: 42.443547,  Lng: -76.495839),  Route carried "on" structure: City street ,  Year Built: 1930,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,711 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,078 (year 2040),  Features Intersected: CASCADILLA CREEK,  Facility Carried by Structure: NORTH AURORA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb or Sidewalk Widths: Left: 4.8m (15.7ft),  Right: 4.5m (14.8ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $658,000,  Roadway Improvement Cost: $385,000,  Total Project Cost: $1,043,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 221056,  Location: CITY OF ITHACA (Lat: 42.442828,  Lng: -76.494569),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 319 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 447 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CASCADILLA CREEK,  Facility Carried by Structure: LINN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Channel: Satisfactory,  Culverts: Excellent,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $219,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $348,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 221057,  Location: CITY OF ITHACA (Lat: 42.443139,  Lng: -76.489631),  Route carried "on" structure: City street ,  Year Built: 1962,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 6,255 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,739 (year 2040),  Design Load: H 20,  Features Intersected: CASCADILLA CREEK,  Facility Carried by Structure: STEWART AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.7m (28.5ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $2,965,000,  Roadway Improvement Cost: $1,736,000,  Total Project Cost: $4,701,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 22106,  Location: CITY OF ITHACA (Lat: 42.454431,  Lng: -76.499889),  Route carried "on" structure: City street ,  Year Built: 1934,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 2,007 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,438 (year 2040),  Design Load: HS 15,  Features Intersected: FALL CREEK,  Facility Carried by Structure: NORTH CAYUGA STREE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Critical Feature Inspection Date: December 2021,  Bridge Improvement Cost: $3,516,000,  Roadway Improvement Cost: $2,059,000,  Total Project Cost: $5,575,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 221061,  Location: CITY OF ITHACA (Lat: 42.453214,  Lng: -76.494675),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 3,189 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,873 (year 2040),  Design Load: HS 20,  Features Intersected: FALL CREEK,  Facility Carried by Structure: LAKE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,263,000,  Roadway Improvement Cost: $739,000,  Total Project Cost: $2,002,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221062,  Location: ITHACA (Lat: 42.452136,  Lng: -76.489825),  Route carried "on" structure: City street ,  Year Built: 1951,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 2,094 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,590 (year 2040),  Design Load: HS 20,  Features Intersected: FALL CREEK,  Facility Carried by Structure: STEWART AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.529,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.8m (179.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $4,737,000,  Roadway Improvement Cost: $2,774,000,  Total Project Cost: $7,511,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 221063,  Location: ITHACA (Lat: 42.451556,  Lng: -76.481675),  Route carried "on" structure: City street ,  Year Built: 1960,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 7.01m (23.00ft),  Average Daily Traffic: 5,085 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,177 (year 2040),  Features Intersected: FALL CREEK,  Facility Carried by Structure: THURSTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 55.2m (181.1ft),  Curb or Sidewalk Widths: Left: 3.4m (11.2ft),  Right: 3.4m (11.2ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.01m (23.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $6,177,000,  Roadway Improvement Cost: $3,617,000,  Total Project Cost: $9,794,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221064,  Location: CITY OF ITHACA (Lat: 42.436444,  Lng: -76.512633),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 2,458 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,441 (year 2037),  Features Intersected: FLOOD RELIEF CHAN,  Facility Carried by Structure: CECIL A MALONE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $503,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 221066,  Location: .2 MI W JCT NY 13 SB (Lat: 42.440917,  Lng: -76.514769),  Route carried "on" structure: State highway 79,  Year Built: 1968,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 12,722 (year 2014),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,454 (year 2040),  Design Load: HS 20,  Features Intersected: RELIEF CHANNEL, CAYUGA W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.561,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Underwater Inspection Date: August 2017,  Bridge Improvement Cost: $2,509,000,  Roadway Improvement Cost: $1,469,000,  Total Project Cost: $3,978,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 421037,  Location: E OF JCT SH 96 & SH 89 (Lat: 42.440897,  Lng: -76.512056),  Route carried "on" structure: State highway 96,  Year Built: 1996,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 14,546 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,670 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA INLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,779,000,  Roadway Improvement Cost: $1,042,000,  Total Project Cost: $2,822,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 421038,  Location: .1 MI W JCT SH 96 & SH 79 (Lat: 42.440006,  Lng: -76.511878),  Route carried "on" structure: City street 79,  Year Built: 1996,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 10,064 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,225 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA INLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.303,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $867,000,  Roadway Improvement Cost: $508,000,  Total Project Cost: $1,375,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 421039,  Location: 50' E JCT S.H.79 & S.H.89 (Lat: 42.439383,  Lng: -76.511969),  Route carried "on" structure: City street 79,  Year Built: 1997,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 9,300 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,297 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CAYUGA INLET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.1m (98.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.16m (10.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,373,000,  Roadway Improvement Cost: $804,000,  Total Project Cost: $2,178,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 552398,  Location: 0.5MI NE BUTTERMILK FALLS (Lat: 42.425433,  Lng: -76.514606),  Route carried "on" structure: State lands road ,  Year Built: 1936,  Status: Open,  Structure Length: 1.68m (5.51ft),  Truck Traffic: 4%,  Features Intersected: OWL GORGE,  Facility Carried by Structure: PARK ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 25.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $454,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1010381,  Location: JCT OF SH 13 SB & SH 34 (Lat: 42.463553,  Lng: -76.498794),  Route carried "under" structure: State highway 34,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 8,114 (year 2000),  Features Intersected: RTE 34,  Facility Carried by Structure: RTE 13
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.386,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 1010382,  Location: JCT OF SH 13 NB & SH 34 (Lat: 42.463383,  Lng: -76.498703),  Route carried "under" structure: State highway 34,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 8,114 (year 2000),  Features Intersected: RTE 34,  Facility Carried by Structure: RTE 13
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.370,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 221045,  Location: 0.8 MI E JCT RTS 79 + 13 (Lat: 42.438828,  Lng: -76.495219),  Route carried "under" structure: City street 79,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 7,200 (year 1971),  Features Intersected: RTE 79, SIX MILE CREEK,  Facility Carried by Structure: SOUTH AURORA ST
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 226966,  Location: City of Ithaca (Lat: 42.418194,  Lng: -76.522147),  Route carried "under" structure: State highway ,  Year Built: 2001,  Structure Length: 0. m,  Features Intersected: Route 13,  Facility Carried by Structure: Gateway Pedestrian
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 48.8m (160.1ft)

Discuss Ithaca, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.